Establishing secure connection…Loading editor…Preparing document…

Refrigeration Maintenance Contract

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

REFRIGERATION CONTRACT

THIS REFRIGERATION CONTRACT (“Contract”), effective as of the date of the last party to sign below, is between , having an address at (“Contractor”) and , having an address at (“Owner”).

For valuable consideration the parties hereby agree as follows:

1. SCOPE OF WORK: Refrigeration work involves the use of hand tools, instruments and gauges, measuring tools, fastening devices and refrigeration supplies to construct, fabricate, erect, install, maintain, service and repair the following: refrigeration equipment, producing systems, rooms and insulated spaces; temperature insulation; air-conditioning units, systems or coolers; ducts; blowers; registers; and humidity and thermostatic controls of air, liquid and/or gas temperatures. Refrigeration services may also include the following: complying with blueprints and specifications to install motors, compressors, evaporators and other components; connecting ducts, refrigerant lines and piping; making power hookups; and constructing, installing, re-installing, repairing, replacing, re-setting, altering, converting, or moving heat producing systems (electric or gas), combustion plants, and ventilation systems in any building, structure or appurtenance thereto. Contractor shall provide all labor and materials, and perform all refrigeration work described above and/or as described in the plans and specifications signed by both Owner and Contractor (“Project”). Such plans and specifications are hereby made a part of this Contract and may contain pictures, diagrams or measurements of the work area together with a description of the work to be done, materials to be used, and the equipment to be used or installed.

2. WORK SITE: The Project shall be constructed on the property of Owner located at and more particularly described as (“the Work Site”). Owner hereby authorizes Contractor to commence and complete the usual and customary excavation and grading on the Work Site as may be required in the judgment of the Contractor to complete the Project. Unless called for in the plans or specifications, no landscaping, finish grading, filling or excavation is to be performed at the Work Site by the Contractor.

3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this Contract on or before and shall substantially complete the work on or before . Contractor shall not be liable for any delay due to circumstances beyond its control including strikes, casualty, acts of God, illness, injury, or general unavailability of materials.

4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may be required by the local municipal/county government, the cost thereof shall be included as part of the Project price.

5. INSURANCE: Contractor shall maintain general liability and workers compensation insurance.

6. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work, including changes to the plans and specifications, from time to time during the construction of the Project. However, any such change or modification shall only be made by written "Change Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the estimated cost.

7. CONTRACT PRICE:

{COST PLUS}

Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of $ for performing the services set forth in the scope of the work. Contractor shall be paid as follows:

OR

{FIXED FEE}

Owner agrees to pay Contractor the sum of $ for performing the services set forth in the scope of the work. Contractor shall be paid as follows:

Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or materials provided at the time the next periodic payment shall be due.

8. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10) days from the due date shall be deemed a material breach of this Contract. If payment is not made when due, Contractor may suspend work on the job until such time as all payments due have been made without breach of the Contract pending payment or resolution of any dispute. Owner agrees to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the rate of 1% per month.

9. DESTRUCTION AND DAMAGE: If the Project is destroyed or damaged for any reason, except where such destruction or damage was caused by the sole negligence of the Contractor or its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in rebuilding or restoring the Project to its condition prior to such destruction or damage. If the estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by either party, Contractor shall be excused from further performance under this Contract and Owner shall pay Contractor a percentage of the Contract price in proportion to the amount of work accomplished prior to the destruction or damage.

10. ASSIGNMENT: Neither party may assign this Contract, or payments due under the Contract, without the other party’s written consent. Any such assignment shall be void and of no effect.

11. INTERPRETATION:

(a) Interpretation of Documents. The Contract, plans, and specifications are intended to supplement one another. In the event of a conflict, the specifications shall control the plans, and the Contract shall control both. If work is displayed on the plans but not called for in the specifications, or if the work is called for in the specifications but not displayed on the plans, Contractor shall be required to perform the work as though it were called for and displayed in both documents.

(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other agreements, oral or written, pertaining to the work to be performed under this Contract exists between the parties. This Contract may only be modified by a written agreement signed by both parties.

(c) Governing Law. This Contract shall be interpreted and governed in accordance with the laws of the State of Vermont.

12. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action against the other party arising from or relating to this Contract, the prevailing party in such proceeding shall be entitled to recover reasonable attorney fees and court costs.

13. PERFORMANCE:

(a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant to this Contract provided Contractor shall remain fully responsible for the proper completion of the Project.

(b) All work shall be completed in a workman-like manner and in compliance with all building codes and applicable laws. To the extent required by law, all work shall be performed by individuals duly licensed and authorized by law to perform said work.

(c) Contractor agrees to remove all debris and leave the premises in broom clean condition.

14. WARRANTY: Contractor's warranty shall be limited to defects in workmanship within the scope of work performed by Contractor and which arise and become known within one (1) year from the date hereof. All said defects arising after one (1) year and defects in material are not warranted by Contractor. Contractor hereby assigns to Owner all warranties on materials as provided by the manufacturer of such materials.

AGREED:

CONTRACTOR:

Signature

Print Name & Title

Date

License Number

Name and Address of License Holder

OWNER:

Signature

Print Name

Date

* Optional notice required only for home solicitation sales:

NOTICE OF CANCELLATION

(enter date of transaction) (date)

You may cancel this transaction, without any penalty or obligation, within three business days from the above date. If you cancel, any property traded in, any payments made by you under the contract or sale, and any negotiable instrument executed by you will be returned within ten business days following receipt by the seller of your cancellation notice, and any security interest arising out of the transaction will be canceled. If you cancel, you must make available to the seller at your residence, in substantially as good condition as when received, any goods delivered to you under this contract or sale; or you may, if you wish, comply with the instructions of the seller regarding the return shipment of the goods at the seller's expense and risk. If you do make the goods available to the seller and the seller does not pick them up within twenty days of the date of your notice of cancellation, you may retain or dispose of the goods without any further obligation. If you fail to make the goods available to the seller, or if you agree to return the goods to the seller and fail to do so, then you remain liable for performance of all obligations under the contract. To cancel this transaction, mail or deliver a signed and dated copy of this cancellation notice or any other written notice, or send a telegram, to at not later than midnight of

I hereby cancel this transaction.

(date)

(buyer's signature)

Enter text✕

What a Refrigeration Maintenance Contract Covers

A Refrigeration Maintenance Contract is a written service agreement that defines scheduled maintenance, emergency response, parts and labor responsibilities, and performance standards for refrigeration equipment. It establishes the parties, effective date, scope of inspections, routine preventative tasks, response times for repairs, parts procurement policies, warranty coordination, and invoicing terms. The contract reduces ambiguity about who is responsible for routine upkeep and emergency repairs, sets pricing and payment terms, and creates a record useful for compliance, insurance, and warranty claims when equipment performance or failures are disputed.

Why a Clear Maintenance Contract Matters

A clear Refrigeration Maintenance Contract reduces operational downtime, allocates liability, and documents service levels that affect safety and food compliance. Precise terms help avoid disputes over response times, parts costs, or preventive actions and support insurance and warranty claims when needed.

Why a Clear Maintenance Contract Matters

Who Typically Prepares and Signs This Contract

The contract is used by equipment owners, facility managers, service providers, and procurement teams who need consistent uptime and documented maintenance obligations.

  • Facility managers who schedule preventive maintenance and monitor vendor performance.
  • Service contractors or OEM technicians who perform inspections, repairs, and parts replacement.
  • Procurement or legal teams who manage vendor terms, insurance, and payment schedules.

Parties should ensure signatory authority is documented and that signatures follow the chosen execution method (wet signature, in-person eSign, or remote eSign) consistent with ESIGN and UETA where applicable.

Step-by-step: Completing the Contract

Follow a consistent order to fill, review, and execute the contract to reduce errors and speed approval.

  • 01
    Prepare: Gather equipment lists, warranty documents, and vendor insurance certificates.
  • 02
    Draft: Populate fields: parties, scope, schedule, payment, and termination clauses.
  • 03
    Review: Legal and operations review for liabilities, SLAs, and compliance obligations.
  • 04
    Execute: Obtain authorized signatures and distribute executed copies to stakeholders.

Where to Send and File the Completed Contract

After execution, the contract should be routed to operations, procurement, and the vendor; maintain the master copy in a secure records system.

  • Vendor: Provide the vendor with a fully executed copy for scheduling and service records.
  • Operations: Store the master contract in facility operations for day-to-day reference.
  • Finance: Send invoice-ready copies to accounts payable for billing setup.
  • Records: Retain a signed digital copy in your document management or contract repository.

How to Configure an Online Maintenance Workflow

Set up a simple approval and signature route so the contract moves from draft to signed copy with minimal manual handoffs.

Field Configuration
Signers Order: vendor sign first, then owner or facility manager sign.
Authentication Use email link or SMS code for signer verification.
Notifications Enable reminders at 3, 7, and 14 days for pending signatures.
Storage Save final PDF in cloud storage and records management system.

Digital Signing and Distribution Considerations

Choose a signing platform that supports secure eSignatures, audit trails, and file export in common formats like PDF and DOCX.

  • File formats: PDF and DOCX supported for signing and export.
  • Integrations: Connect to Google Workspace, Microsoft 365, or cloud storage providers.
  • Authentication: Email, SMS, or advanced methods available to verify signers.

Ensure chosen tools meet your compliance needs (for example HIPAA BAA if the contract involves protected health information) and retain audit logs for the agreed retention period.

Typical eSignature Vendor Pricing and Capabilities

Compare common eSignature plans and capabilities; signNow is listed first per vendor comparison. Use published plan pricing and feature notes when selecting a solution.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial Yes, 7-day trial Varies Varies Varies Varies
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Consequences of Poorly Prepared Contracts

Breach Disputes: Loss recovery or specific performance may be limited
Warranty Denial: Vendors may deny warranty without clear maintenance terms
Insurance Gaps: Claims may be reduced if obligations are unclear
Regulatory Fines: Noncompliance with safety rules can result in fines
Service Interruptions: Ambiguous response times increase downtime risk
Tax/Record Issues: Missing records can complicate audits

Common Preparation Errors to Avoid

  • Unclear scope that omits specific equipment makes enforcement difficult
  • Missing authorized signer or incorrect title delays execution and validity
  • Vague payment terms that lack amounts or schedules cause disputes
  • Failure to attach equipment lists, serial numbers, or warranties leads to coverage gaps

Practical Tips for Accurate Contracts

Follow proven practices to minimize disputes and speed implementation.

Use clear, equipment-specific scope language
Describe make, model, and serial numbers and list exact preventive tasks and intervals so both parties share the same expectations and service coverage.
Define measurable service levels
Specify response times, remedies for missed SLAs, and how service credits are calculated to avoid subjective disagreements during incidents.
Require proof of insurance and certifications
Vendor must provide current liability, workers' comp, and any refrigerant handling certifications; maintain copies with the contract for audits or claims.
Keep a single executed master copy
Store the signed PDF in a secure repository with version control and keep distributed read-only copies to prevent unauthorized edits.

Key Dates to Track in the Contract

Track effective dates, renewal windows, inspection schedules, and termination notice requirements to avoid lapses in coverage.

Effective Date:

Date obligations begin; recorded as MM/DD/YYYY

Service Schedule:

Specify monthly, quarterly, or annual preventive visit dates

Renewal Notice:

Provide required notice period (commonly 30–90 days)

Termination Window:

State termination for convenience or cause and required notice

Warranty Claim Period:

Preserve parts receipts and service logs within warranty timeframe

Realistic Use Cases for Maintenance Contracts

These scenarios illustrate how different organizations rely on maintenance contracts to secure uptime and meet compliance.

Restaurant Chain Example

A regional restaurant chain centralized maintenance contracts to ensure consistent preventive visits and predictable parts discounts.

  • The chain required four quarterly inspections per store to protect perishable inventory.
  • Standardized contracts with defined SLAs reduced emergency callouts and improved food safety documentation across 120 locations, easing health inspection readiness.

Healthcare Facility Example

A community clinic specified vendor certification and HIPAA-safe reporting in its maintenance contract.

  • The facility required immediate response for refrigeration storing vaccines.
  • By documenting vendor access controls and service logs, the clinic maintained vaccine integrity and created auditable records for state public health compliance.

Who Signs and Why

Facilities Manager

Facilities managers negotiate scope, approve service schedules, and sign to confirm operational acceptance. They ensure the contract aligns with inventory control and continuity plans and verify vendor credentials and insurance.

Service Provider Representative

An authorized vendor signer accepts performance obligations, warranty coordination, and pricing. This representative must have authority to bind the company for labor, parts commitments, and emergency response.

How This Contract Differs from Similar Documents

Compare a Refrigeration Maintenance Contract with related agreements to select the right document for risk allocation.

Criteria Maintenance Contract Equipment Lease
Primary Purpose service and upkeep transfer possession for use
Duration Focus ongoing inspections fixed term rental
Liability Allocation service provider covers repairs lessee responsible for damage
Includes Parts Coverage often yes sometimes yes

Frequently Asked Questions

Answers to common execution, compliance, and signing questions about Refrigeration Maintenance Contracts.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users