Scope of Work
Defines the exact structures, elements, and limits of demolition, including selective versus full demolition, areas to remain, and required site access controls.
Precise contract documents reduce ambiguity about scope, safety, environmental controls, and payment, lowering project risk and supporting regulatory approvals and insurance compliance.
Each party should keep an executed copy and supporting exhibits for contract administration, inspections, and potential claims.
Defines the exact structures, elements, and limits of demolition, including selective versus full demolition, areas to remain, and required site access controls.
Details methods, equipment constraints, acceptable materials handling, dust and runoff controls, and criteria for structural shoring or temporary supports.
Lists contractor responsibilities for OSHA compliance, PPE, confined-space procedures, traffic control, and emergency response plans during demolition operations.
Requires surveys (asbestos, lead, PCBs), abatement sequencing, disposal routes, haul permits, and air/water protection measures consistent with local agency rules.
Specifies unit measurements, progress payment milestones, retainage, change-order pricing, and final acceptance criteria for released payments.
Identifies municipal permits, utility disconnect procedures, inspection checkpoints, and required certificates of completion before occupancy or rebuilding.
| Field | Configuration |
|---|---|
| Authentication Method | Email link | SMS code | KBA as needed |
| Signature Order | Sequential signing with owner sign-off last |
| Conditional Fields | Show asbestos clause only if survey positive |
| File Format | PDF/A or DOCX for final executed copies |
Store executed documents in a controlled repository with access logging and retention policies aligned to regulatory and contract requirements.
2–8 weeks depending on municipality and scope
Complete surveys 2–4 weeks before mobilization
Notify utilities at least 7–14 days prior
Start within agreed mobilization period after notice to proceed
Schedule with authority within 7 days of completion
Assess hazardous materials and site constraints before bids.
Obtain required municipal and utility permits.
Perform demolition according to sequence and safety plan.
Complete debris removal and final grading for acceptance.
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | Yes, 7-day trial | Yes, limited trial | Yes, limited trial | Yes, limited trial | Yes, limited trial |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
| Envelope Cap | No cap | 100 envelopes/user/year | No cap | No cap | No cap |
A regional property manager used electronic execution for renovation and demolition contracts to reduce turnaround.
A small development firm centralized contract templates and permit attachments for repeat demolition projects.