- 1 -
PAINTING CONTRACT
THIS PAINTING CONTRACT (“Contract”), effective as of the date of the last party to sign
below, is between , having an address at
("Contractor") and , having an
address at ("Owner").
For valuable consideration the parties hereby agree as follows:
1. SCOPE OF WORK: Contractor shall notify Builder of excessive defects in the drywall or other
surfaces to be painted prior to commencing work. Contractor shall insure the painting surfaces are
free from dust, dirt, mildew, fungus, loose materials, faults, defects and otherwise properly prepare
the surface to receive the paint, that insures complete even coverage and adequate adhesion of the
paint to the surface. Contractor agrees not to begin work until the surfaces to receive paint are
clean, dry, free of defects, firm and sound to design shape. Upon completion, the painted surface
shall be uniform in appearance; with complete coverage; free of runs, sags, and skips; with sharp
clean edges, when finishes join other materials or colors; smooth without roughness, (excepting
those surface materials whose natural texture is roughness, such as rough cedar beams and siding,
textured siding, etc.); and pleasing to the eye.
Contractor is responsible for all scheduling delivery of all painting materials. Contractor is
responsible for the clean-up of any splatters caused during painting.
PAINT, EXTERIOR: Number of Coats:
Siding: Trim:
Doors: Windows: *
Deck: Garage Doors:
Caulking:
PAINT, INTERIOR:
Walls of Finished Area: Number of Coats:
Walls of Papered Area: Number of Coats:
Ceilings: Number of Coats:
Garage Walls: Number of Coats:
Basements Walls: Number of Coats:
Floors: Number of Coats:
Ceilings: Number of Coats:
Paint and Number of Coats Interior Millwork:
Stain, Finish, and Number of Coats Interior Millwork:
Paint and Number of Coats Cabinets:
- 2 -
Stain and Number of Coats Cabinets:
2. WORK SITE: The Project shall be constructed on the property of Owner located at
and more
particularly described as (hereafter
"the Work Site"). Owner hereby authorizes Contractor to commence and complete the usua l and
customary excavation and grading on the Work Site as may be required in the judgment of the
Contractor to complete the Project. Unless called for in the drawings or specificat ions, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before
.
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be include d as part of
the Project price.
5. INSURANCE: Contractor shall maintain general liability, workers compensation and builder's
risk insurance.
6. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
out property lines to the Contractor. If the Owner or Contractor has any doubt about the locat ion
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions tha t
affect the Work Site.
7. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the drawings and specifications, from time to time during the const ruction of
the Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contrac tor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not i t is in excess of the
estimated cost.
8. CONTRACT PRICE: {COST PLUS}
Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of
$ for performing the services set forth in the scope of the work. Contractor
shall be paid as follows:
- 3 -
.
OR
{FIXED FEE}
Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.
Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.
9. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10)
days from the due date shall be deemed a material breach of this Contract. If paym ent is not made
when due, Contractor may suspend work on the job until such time as all payments due have bee n
made without breach of the Contract pending payment or resolution of any dispute. Owner agree s
to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the
rate of 1% per month.
10. DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contra ctor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If t he
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
either party, Contractor shall be excused from further performance under this Contract and Owner
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.
11. ASSIGNMENT : Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.
12. INTERPRETATION: (a) Interpretation of Documents. The Contract, drawings, and specifications are intended to
supplement one another. In the event of a conflict, the specifications shall control the drawings,
and the Contract shall control both. If work is displayed on the drawings but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the drawings,
Contractor shall be required to perform the work as though it were called for and displayed in both
documents.
(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exi sts
between the parties. This Contract may only be modified only by a written agreeme nt signed by
both parties.
(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
- 4 -
laws of the State of New Jersey.
13. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing part y in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.
14. PERFORMANCE: (a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
this Contract provided Contractor shall remain fully responsible for the proper completion of the
Project.
(b) All work shall be completed in a workman-like manner and in compliance with all
building codes and applicable laws. To the extent required by law, all work shall be pe rformed by
individuals duly licensed and authorized by law to perform said work.
(c) Contractor agrees to remove all debris and leave the premises in broom clean condition.
15. WARRANTY: All materials and installations incorporated into the work shall be new, unless
otherwise specified, and shall be of good quality. Contractor agrees to repair any peeling,
deteriorating, fading paint surfaces for a period of one year, and Contractor shall not be
responsible for mildew or fungus that may form on painted surfaces. Contractor shall not be
responsible after this period. Contractor shall not be responsible for builders' negligence.
Contractor agrees to assist in securing fulfillment of warranties provided by the manufacturer on
the materials supplied by Contractor. In the event, of peeling, deteriorating, fading pai nt surfaces
within the warranty period and through fault of contractor, then Contractor agrees to repair within
days of notice, weather permitting. Contractor's obligation to effect repa irs, as described
above in this paragraph, is the only guarantee or warranty provided by Contractor to Owner with
respect to the work.
A mortgage or security interest to be taken in connection with the financing or sale of the home
improvement applies and is described as follows: ______________________________.
A person other than the seller is to act as the general contractor or assume responsibility for
performance of the contract and is identified as:
Name: ______________________________
Address: ______________________________
NOTICE TO OWNER
Do not sign this contract in blank. You are entitled to a copy of the contract at the time you sign.
Keep it to protect your legal rights. Do not sign any completion certificate or agreement stating that
you are satisfied with the entire project before this project is complete. Home repair contractors are
- 5 -
prohibited by law from requesting or accepting a certificate of completion signed by the owner
prior to the actual completion of the work to be performed under the home repair contract.
Workmen's compensation and public liability insurance are carried by the home repair
contractor and applicable to the work to be performed under the contract.
The home repair contractor is qualified as a self-insurer pursuant to Title 34;
The home repair contractor is precluded from purchasing workmen's compensation under
chapter 15 of Title 34 of the Revised Statutes,and does not carry workmen's compensation
insurance.
AGREED:
CONTRACTOR:
Signature
Print Name & Title
Date
License Number
Name and Address of License Holder
Print Name of Salesperson (if applicable)
Address of Salesperson (if applicable)
Phone Number
OWNER:
Signature
Print Name
Date
- 6 -
* Required for use in home solicitation sales only:
RECEIPT
______________________________
Contractor's Name ______________________________
Contractor’s Place of Business
Description of the goods and services sold: ______________________________
Amount of money paid by the owner or the cash value of any goods delivered to the home repair
contractor at the time the home repair contract was entered into: ______________________________
NOTICE TO OWNER: YOU MAY RESCIND THIS SALE PROVIDED THAT YOU NOTIFY THE
HOME REPAIR CONTRACTOR OF YOUR INTENT TO DO SO BY CERTIFIED MAIL, RETURN
RECEIPT REQUESTED, POSTMARKED NOT LATER THAN 5 P.M. OF THE THIRD BUSINESS
DAY FOLLOWING THE SALE. FAILURE TO EXERCISE THIS OPTION, HOWEVER, WILL NOT
INTERFERE WITH ANY OTHER REMEDIES AGAINST THE HOME REPAIR CONTRACTOR
YOU MAY POSSESS. IF YOU WISH YOU MAY USE THIS PAGE AS NOTIFICATION BY
WRITING "I HEREBY RESCIND' AND ADDING YOUR NAME AND ADDRESS. A DUPLICATE
OF THIS RECEIPT IS PROVIDED BY THE HOME REPAIR CONTRACTOR FOR YOUR
RECORDS.
Valuable suggestions for preparing your ‘Contractor Agrees Not To Begin Work Until The Surfaces To Receive Paint Are’ online
Are you exhausted from the complications of managing paperwork? Look no further than airSlate SignNow, the premier electronic signature solution for individuals and small businesses. Bid farewell to the monotonous routine of printing and scanning documents. With airSlate SignNow, you can seamlessly complete and sign paperwork online. Utilize the extensive features incorporated into this user-friendly and cost-effective platform and transform your method of document organization. Whether you need to sign forms or gather eSignatures, airSlate SignNow makes it all effortless, with just a few clicks.
Adhere to this comprehensive guide:
- Access your account or register for a complimentary trial with our service.
- Select +Create to upload a document from your device, cloud storage, or our form repository.
- Open your ‘Contractor Agrees Not To Begin Work Until The Surfaces To Receive Paint Are’ in the editor.
- Click Me (Fill Out Now) to prepare the document on your end.
- Add and assign fillable fields for others (if needed).
- Continue with the Send Invite options to solicit eSignatures from others.
- Save, print your copy, or convert it into a multi-use template.
Do not fret if you need to collaborate with your teammates on your Contractor Agrees Not To Begin Work Until The Surfaces To Receive Paint Are or send it for notarization—our platform offers everything you require to accomplish these tasks. Create an account with airSlate SignNow today and elevate your document management to new levels!
Painting Statement of Work
Contract for painting house
What should be included in a service contract
Rocket Lawyer Construction Contract
Painting scope of work template
Independent contractor contract
What is a service agreement
How does a service contract work