- 1 - FRAMING CONTRACT THIS FRAMING CONTRACT (“Contract”), effective as of the date of the last party to sign
below, is between , having an address at ("Contractor") and , having an
address at ("Owner").
For valuable consideration the parties hereby agree as follows:1. SCOPE OF WORK: Framing shall be to the plans including all details. Floor joist layout shall
be as best to avoid plumbing for tubs and toilets. Framing includes the installation of sill plates;
rim joists; floor joists; sub flooring; plates; exterior and interior walls; ceiling joists; headers; rafters; roof
sheathing; sub fascia and fascia; bridging; joist hangers; rough framing materials for stair jacks, treads and
risers; collar ties; other attic bracing materials; roof overhang and soffit; rake boards; steel and/or wood
girders; columns and posts; sill sealer under the sill plates; sheathing and siding the exterior walls; siding
corners; interior and exterior decorative beams and posts; exterior moldings; drip edge/Z-bar (including
trim materials over z-bar); windows; exterior doors (excepting the garage door); frame and case garage
door as needed; back-out garage door as needed; ventilation materials; termite shield; furring blocks on
concrete walls; bracing; stiffbacks; backing blocks; nailing blocks; shimming windows and doors;
caulking and gluing continuous as needed; set all finish nails; insulation behind tubs located on exterior
walls; drywall behind tubs as required; box in vent areas; box in heat runs as required; framing for future
recessed fixtures; kitchen and bathroom cabinet drops; fire stopping as required; deck posts; deck girders;
deck floor joists and flooring; deck handrail and seating; deck stair jacks, treads and risers; and .
Contractor shall return all excess material and damaged materials. Contractor shall call for inspections of
the work as required.
Fra m in g M ate ria ls :S il l I n su la tio n: T erm ite S hie ld : B rid gin g M ate ria l: Jo is t H an gers : S ub F lo o r M ate ria l: S iz e: G lu e: U nd erla y m en t M ate ria l: S iz e: G lu e: W all S heath in g M ate ria l: S iz e: C orn er B ra ce M ate ria l: W all S id in g M ate ria l: S iz e: R oo f S heath in g M ate ria l: S iz e: F li tc h P la te M ate ria l/S iz e: B olts : N ails -F ra m in g M em bers : S id in g: W in dow s: E xte rio r T rim : E xte rio r D oors : U se M ateri al Type Siz eS p acin gG rea te st S pan
Each S iz e S il l P la te N/A N/A Box Sill/Rim Joist N/A N/A 1st Floor-Floor Joists
- 2 - 2nd Floor-Floor Joists Ceiling Joists Rafters/Roof Trusses Exterior Studs Interior Studs Top & Bottom Plates N/A N/A Headers, Windows & Doors N/A Headers, Garage Door N/A Beams N/A Roof Bracing/Collar Ties Exterior Trim M ate ria l T yp e ThicknessSize Fascia Board Soffit Siding Corners Garage Door Trim Window Trim Door Trim Rake Board Exterior Beams Exterior Posts Flashing Material: Windows: Doors: Soffit Vents: Gable Vents: WINDOWS:Manufacturer/Style: Material: Insulated Glass: Screens: Storms: Grilles: Shutters: STAIRS: LOCATION JACKSTREADSRISERS MaterialSizeMaterialSize Material SizeBasement
- 3 - 1st Floor 2nd Floor Disappearing Stairs- Make and Model Number: EXTERIOR DOORS: (Including Storm Doors) Door Brand/Model/Material SizeThicknessHardwareFront Rear Sliding/Patio Garage 2. WORK SITE: The Project shall be constructed on the property of Owner located at and more
particularly described as (hereafter
"the Work Site"). Owner hereby authorizes Contractor to commence and complete the usual and
customary excavation and grading on the Work Site as may be required in the judgment of the
Contractor to complete the Project. Unless called for in the drawings or specifications, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before
.
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be included as part of
the Project price.5. INSURANCE: Contractor shall maintain general liability, workers compensation and builder's
risk insurance.6. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
out property lines to the Contractor. If the Owner or Contractor has any doubt about the location
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that
affect the Work Site.7. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the drawings and specifications, from time to time during the construction of
the Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the
- 4 - estimated cost.8.CONTRACT PRICE:{COST PLUS}Owner agrees to pay Contractor the actual cost to Contractor of
materials plus the sum of$ for performing the services set forth in the
scope of the work. Contractor shall be paid as follows:
.OR{FIXED FEE}Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.9.LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10)
days from the due date shall be deemed a material breach of this Contract. If payment is not made
when due, Contractor may suspend work on the job until such time as all payments due have been
made without breach of the Contract pending payment or resolution of any dispute. Owner agrees
to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the
rate of 1% per month.10. DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contractor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If the
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
either party, Contractor shall be excused from further performance under this Contract and Owner
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.11. ASSIGNMENT: Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.12.INTERPRETATION:(a)Interpretation of Documents. The Contract, drawings, and specifications are intended to
- 5 - supplement one another. In the event of a conflict, the specifications shall control the drawings,
and the Contract shall control both. If work is displayed on the drawings but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the drawings,
Contractor shall be required to perform the work as though it were called for and displayed in both
documents.(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exists
between the parties. This Contract may only be modified only by a written agreement signed by
both parties.(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
laws of the State of Missouri.13. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing party in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.14.PERFORMANCE:(a)Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
this Contract provided Contractor shall remain fully responsible for the proper completion of the
Project. (b) All work shall be completed in a workman-like manner and in compliance with all
building codes and applicable laws. To the extent required by law, all work shall be performed by
individuals duly licensed and authorized by law to perform said work.(c)Contractor agrees to remove all debris and leave the premises in broom clean condition.15.WARRANTY: Contractor's warranty shall be limited to due to improper framing labor
techniques, except for the following allowances: floor variance shall not exceed 1/4 inch in 32
inches, bowed or out of plumb walls shall not exceed 1/4 inch in 32 inches, non-excessive floor
squeaks or pops. All said defects arising after one (1) year and defects in material are not
warranted by Contractor. Contractor hereby assigns to Owner all warranties on materials as
provided by the manufacturer of such materials.AGREED:CONTRACTOR:Signature Print Name & Title DateOWNER:Signature Print Name Date
- 6 - License Number Name and Address of License Holder STATUTORY NOTICES TO OWNER: NOTICE TO OWNER FAILURE OF THIS CONTRACTOR TO PAY THOSE PERSONS SUPPLYING MATERIAL OR
SERVICES TO COMPLETE THIS CONTRACT CAN RESULT IN THE FILING OF A
MECHANIC'S LIEN ON THE PROPERTY WHICH IS THE SUBJECT OF THIS CONTRACT
PURSUANT TO CHAPTER 429, RSMO. TO AVOID THIS RESULT YOU MAY ASK THIS
CONTRACTOR FOR "LIEN WAIVERS" FROM ALL PERSONS SUPPLYING MATERIAL OR
SERVICES FOR THE WORK DESCRIBED IN THIS CONTRACT. FAILURE TO SECURE
LIEN WAIVERS MAY RESULT IN YOUR PAYING FOR LABOR AND MATERIAL TWICE. CONSENT OF OWNER CONSENT IS HEREBY GIVEN FOR FILING OF MECHANIC'S LIENS BY ANY PERSON
WHO SUPPLIES MATERIALS OR SERVICES FOR THE WORK DESCRIBED IN THIS
CONTRACT ON THE PROPERTY ON WHICH IT IS LOCATED IF HE IS NOT PAID.___________________________(date)___________________________(owner's signature)SECTIONS 436.350 TO 436.365 OF MISSOURI REVISED STATUTES PROVIDE YOU
WITH CERTAIN RIGHTS IF YOU HAVE A DISPUTE WITH A CONTRACTOR REGARDING
CONSTRUCTION DEFECTS. EXCEPT FOR CLAIMS FILED IN SMALL CLAIMS COURT,
IF YOU HAVE A DISPUTE WITH A CONTRACTOR, YOU MUST DELIVER TO THE
CONTRACTOR A WRITTEN CLAIM OF ANY CONSTRUCTION CONDITIONS YOU ALLEGE
ARE DEFECTIVE AND PROVIDE YOUR CONTRACTOR THE OPPORTUNITY TO MAKE AN
OFFER TO REPAIR OR PAY FOR THE DEFECTS. YOU ARE NOT OBLIGATED TO
ACCEPT ANY OFFER MADE BY THE CONTRACTOR. READ THIS NOTICE CAREFULLY.
THERE ARE STRICT DEADLINES AND PROCEDURES UNDER SECTIONS 436.350 TO
436.365 WHICH MUST BE OBEYED IN ORDER TO PRESERVE YOUR ABILITY TO FILE
A LAWSUIT. OTHER THAN REPAIRS TO WORK DONE BY THE CONTRACTOR THAT ARE
NECESSARY TO PROTECT THE LIFE, HEALTH, OR SAFETY OF PERSONS LIVING IN
A RESIDENCE, OR TO AVOID ADDITIONAL SIGNIFICANT AND MATERIAL DAMAGE TO
THE RESIDENCE PURSUANT TO SUBSECTION 10 OF SECTION 436.356, YOU MAY
NOT INCLUDE IN CLAIMS AGAINST YOUR CONTRACTOR THE COSTS OF OTHER
- 7 - REPAIRS YOU PERFORM BEFORE YOU ARE ENTITLED TO FILE A LAWSUIT UNDER
SECTIONS 436.350 TO 436.365.
- 8 - * Optional notice required only for contracts to be paid from insurance proceeds:You may cancel this contract at any time before midnight on the fifth
business day after you have received written notification from your
insurer that all or any part of the claim or contract is not a covered
loss under the insurance policy. See attached notice of cancellation
form for an explanation of this right. NOTICE OF CANCELLATION If you are notified by your insurer that all or any part of the claim or contract is not a covered loss
under the insurance policy, you may cancel the contract by mailing or delivering a signed and dated
copy of this cancellation notice or any other written notice to (name of contractor) at (address of
contractor's place of business) at any time prior to midnight on the fifth business day after you have
received such notice from your insurer. If you cancel, any payments made by you under the
contract, except for certain emergency work already performed by the contractor, will be returned to you within ten business days following receipt by the contractor of your cancellation notice.I HEREBY CANCEL THIS TRANSACTION___________________________(date)___________________________(insured's signature)
- 9 - * Optional notice required only for home solicitation sales: NOTICE OF CANCELLATION ___________________________(Date of transaction must be filled in at time of sale by seller.)If this agreement was solicited at your residence and you do not want the goods or services, you
may cancel, without further obligation, this agreement by mailing a notice to the seller at the
address as shown below, within 3 business days following the above date. You shall return the goods
to seller in substantially the same condition as when you obtained them. Seller will then cancel all
contracts and negotiable instruments executed by you and return any property given by you to
seller within 10 days from date of transaction. If seller does not pick up the purchased goods within
20 days from date of your cancellation, you may retain or dispose of the goods without any further
obligation. The notice must be mailed to: ___________________________. (Name and mailing
address of seller must be filled in at time of sale.)
Valuable advice on preparing your ‘Door As Needed Back Out Garage Door As Needed Ventilation Materials Termite Shield Furring Blocks On’ online
Are you weary of the inconvenience associated with handling paperwork? Look no further than airSlate SignNow, the premier eSignature solution for individuals and organizations. Bid farewell to the lengthy process of printing and scanning documents. With airSlate SignNow, you can effortlessly finalize and sign documents online. Utilize the comprehensive features embedded in this user-friendly and cost-effective platform to transform your document management strategy. Whether you need to approve forms or gather signatures, airSlate SignNow manages it all seamlessly, with just a few clicks.
Adhere to this detailed guide:
- Access your account or register for a complimentary trial with our service.
- Select +Create to upload a file from your device, cloud storage, or our template library.
- Edit your ‘Door As Needed Back Out Garage Door As Needed Ventilation Materials Termite Shield Furring Blocks On’ in the editor.
- Select Me (Fill Out Now) to get the document ready on your end.
- Insert and assign fillable fields for others (if required).
- Continue with the Send Invite settings to request eSignatures from others.
- Download, print your version, or convert it into a reusable template.
Don’t be concerned if you need to collaborate with your team on your Door As Needed Back Out Garage Door As Needed Ventilation Materials Termite Shield Furring Blocks On or send it for notarization—our platform is equipped with everything you need to accomplish such objectives. Sign up with airSlate SignNow today and take your document management to greater levels!