FSME Procedure Approval
ADMINISTRATIVE STAFF SUPPORT UNDER THE
INTEGRATED MATERIALS PERFORMANCE EVALUATION
PROGRAM (IMPEP)
AD-600
Issue Date:
March 22, 2010
Review Date:
March 22, 2013
Robert J. Lewis
Director, MSSA
/RA/
Date: 03/22/2010
A. Duncan White
Branch Chief, ASPB
/RA/
Date: 03/11/2010
Karen Meyer
Procedure Contact, ASPB
/RA/
Date: 03/02/2010
ML100430025
NOTE
Any changes to the procedure will be the responsibility of the FSME Procedure Contact.
Copies of the FSME procedures will be available through the NRC website.
Procedure Title:
Administrative Staff Support Under the
Integrated Materials Performance
Evaluation Program (IMPEP)
Procedure Number: AD-600
I.
Page: 1 of 6
Issue Date:
3/22/2010
INTRODUCTION
This document provides guidance for the administrative staff support involved in the
preparation and management of documents relating to the Integrated Materials
Performance Evaluation Program (IMPEP).
II.
OBJECTIVES
To provide guidance to the Office of Federal and State Materials and Environmental
Management Program (FSME) on the administrative coordination of IMPEP. Support will
be provided by the administrative coordinator from the Division of Materials Safety State
Agreements (MSSA), Agreement States Program Branch (ASPB). When the IMPEP
team leader is from the Region or another U.S. Nuclear Regulatory Commission (NRC)
program office other than FSME, additional administrative coordination with FSME may
be needed.
III.
BACKGROUND
It is the policy of the NRC to evaluate the NRC Regional and Agreement State
radioactive materials programs in an integrated manner. IMPEP assistance for the
IMPEP team leader is performed by the assigned administrative staff.
IV.
ROLES AND RESPONSIBILITIES
A.
MSSA Director:
1.
B.
C.
Approves the Annual IMPEP Review Schedule and IMPEP team
assignments.
ASPB Chief:
1.
Designates the IMPEP Project Manager.
2.
Reviews IMPEP Schedule and IMPEP team assignments.
IMPEP Project Manager:
1.
Prepares Annual IMPEP Schedule and IMPEP team assignments.
2.
Coordinates with the administrative coordinator regarding IMPEP-related
responsibilities.
AD-600: Administrative Staff Support Under the
Integrated Materials Performance Evaluation
Program (IMPEP)
D.
V.
Page: 2 of 6
Issue Date:
3/22/2010
3.
Signs the Proposed Final IMPEP Reports to the Management Review
Board (MRB) Members.
4.
Distributes the Final IMPEP Report and Letter to the Oak Ridge National
Laboratory contractor to be posted on FSME=s web site.
Designated Administrative Coordinator:
1.
Proofreads the IMPEP reports for proper grammar and format.
2.
Verifies that the IMPEP related documents are accurate and that they are
distributed, either in paper copy or electronic e-mail copy, to the
appropriated individuals in the State, the designated State Liaison Officer
(SLO), IMPEP review team leader and members, Office of the Executive
Director for Operations (OEDO), FSME, and Office of the General
Counsel (OGC).
3.
Profiles and posts the IMPEP-related correspondence in the Agencywide
Documents Access and Management System (ADAMS): IMPEP review
scheduling letter, the IMPEP reports (draft, proposed final and final
versions), the MRB public meeting notice, the MRB meeting minutes, and
the acknowledgment letter, if a response to the Final IMPEP Report is
requested.
4.
Schedules the MRB meetings, including those resulting from State
periodic meetings, with OEDO, OGC, FSME, and the appropriate State
personnel. Arranges for videoconferencing, bridge numbers, and
conference rooms, as appropriate, for the MRB meetings.
5.
Request EDATS number for the FSME front office for the Final IMPEP
Report. Prepares Final IMPEP Report for concurrence in accordance to
FSME procedures.
GUIDANCE
The following documents are to be profiled in ADAMS and distributed by the
administrative staff. In order to ensure consistency, this procedure establishes naming
conventions for the Microsoft documents, ADAMS profile templating (FSME-003), and
distribution instructions (both paper copy and electronic e-mail versions).
A.
Scheduling Letter
Scheduling Letter with IMPEP Questionnaire mailed to State.
AD-600: Administrative Staff Support Under the
Integrated Materials Performance Evaluation
Program (IMPEP)
MS Word Name:
Page: 3 of 6
Issue Date:
3/22/2010
[YYYY - Year] [XX - State Name Abbreviation] IMPEP
Scheduling Letter.doc.
Distribution (e-mail): IMPEP team leader and members, IMPEP Project
Manager, ASPB Chief, and Regional State Agreements
Officer (RSAO).
Distribution (via
regular mail):
ADAMS:
B.
Letter Addressee; Carbon Copies: SLO, State Radiation
Control Program Director, if appropriate.
FSME-003 Template Instructions (Appendix A).
IMPEP Questionnaire Response from State
State returns Questionnaire to IMPEP team leader. The IMPEP team leader
reviews for completeness, performs the Sensitive Unclassified Non-Safeguards
Information (SUNSI) review, and ensures that the document is put into ADAMS
by the Administrative Coordinator.
MS Word Name:
[YYYY - Year] [XX - State Name Abbreviation] IMPEP
Questionnaire.doc.
Distribution (e-mail): IMPEP team leader and members, IMPEP Project
Manager, ASPB Chief, and RSAO.
ADAMS:
C.
FSME-003 Template Instructions (Appendix A).
Organization Charts Received from State
State submits organization charts in Questionnaire response or at the IMPEP
review. The IMPEP team leader ensures that the document is put into ADAMS
by the Administrative Coordinator.
MS Word Name:
[YYYY - Year] [XX - State Name Abbreviation] IMPEP
Organization Charts.doc
Distribution (e-mail): IMPEP team leader and members, IMPEP Project
Manager, ASPB Chief, and RSAO.
ADAMS:
FSME-003 Template Instructions (Appendix A). Enter
organization charts as individual document.
AD-600: Administrative Staff Support Under the
Integrated Materials Performance Evaluation
Program (IMPEP)
D.
Page: 4 of 6
Issue Date:
3/22/2010
Draft IMPEP Report
The Draft IMPEP Report is prepared and signed by the IMPEP team leader in
accordance with FSME Procedure SA-100, Implementation of the Integrated
Materials Performance Evaluation Program. The IMPEP team leader also
performs the SUNSI review. Administrative Coordinator is responsible for typing,
proofreading, profiling in ADAMS, and distributing this document.
MS Word Name:
[YYYY - Year] [XX - State Name Abbreviation] Draft IMPEP
Report and Letter.doc.
Distribution (e-mail): IMPEP team leader and members, IMPEP Project
Manager, ASPB Chief, RSAO, SLO, State Radiation
Control Program Director, if appropriate, and Agreement
State IMPEP team member.
E.
Distribution (via
regular mail)
Letter Addressee; Carbon Copies.
ADAMS:
FSME-003 Template Instructions (Appendix A).
State Response to Draft IMPEP Report
State returns the response to the Draft IMPEP Report to the IMPEP team leader.
The IMPEP team leader ensures that the document is put into ADAMS by the
Administrative Coordinator.
MS Word Name:
[YYYY-Year] [XX – State Name Abbreviation] Response to
the Draft IMPEP Report.doc.
Distribution (e-mail): IMPEP team leader and members, IMPEP Project
Manager, ASPB Chief, and RSAO.
ADAMS:
F.
FSME-003 Template Instructions (Appendix A).
Proposed Final IMPEP Report
IMPEP Project Manager and IMPEP team leader revise the Draft IMPEP Report
to reflect the State=s response which is issued as the Proposed Final IMPEP
Report. The IMPEP Project Manager also performs the SUNSI review.
Administrative Coordinator is responsible for typing, proofreading, profiling in
ADAMS, and distributing this document.
AD-600: Administrative Staff Support Under the
Integrated Materials Performance Evaluation
Program (IMPEP)
MS Word Name:
Page: 5 of 6
Issue Date:
3/22/2010
[YYYY - Year] [XX - State Name Abbreviation] Proposed
Final IMPEP Report and Memo.doc
Distribution (e-mail): IMPEP team leader and members, IMPEP Project
Manager, MSSA Director, MSSA Deputy Director, ASPB
Chief, FSME Agreement State Program Point of Contact
(POC), RSAO, Technical Assistant, OEDO, Agreement
State IMPEP team member, and the Organization of
Agreement States (OAS) Liaison to the MRB.
G.
Distribution (NRC
paper copy):
MRB Members/Memorandum Addressees
ADAMS:
FSME-003 Template Instructions (Appendix A).
MRB Meeting Minutes
The FSME Administrative Coordinator takes the minutes at the MRB meeting and
circulates the minutes for review to the IMPEP team leader, the IMPEP Project
Manager, and the State or Region being reviewed. Administrative Coordinator is
responsible for typing, proofreading, profiling in ADAMS, and distributing this
document.
MS Word Name:
[YYYY - Year] [XX - State Name Abbreviation] MRB
Minutes.doc
Distribution (e-mail): IMPEP team leader, IMPEP Project Manager, ASPB Chief,
POC, RSAO, State Radiation Control Program Director,
and OAS Liaison to the MRB.
H.
Distribution (NRC
paper copy):
MRB Members
ADAMS:
FSME-003 Template Instructions (Appendix A).
Final IMPEP Report
Final IMPEP Report is coordinated by the IMPEP team leader and the IMPEP
Project Manager by revising the Proposed Final IMPEP Report to reflect the
actions recommended by the MRB. Administrative Coordinator is responsible for
typing, proofreading, profiling in ADAMS, and distributing this document. The
Final IMPEP Report is signed by the Deputy Executive Director for Materials,
Research, State and Compliance Programs, OEDO.
MS Word Name:
[YYYY - Year] [XX - State Name Abbreviation] Final IMPEP
Report and Letter.doc
AD-600: Administrative Staff Support Under the
Integrated Materials Performance Evaluation
Program (IMPEP)
Page: 6 of 6
Issue Date:
3/22/2010
Distribution (e-mail): IMPEP team leader and members, IMPEP Project
Manager, MSSA Director, MSSA Deputy Director, ASPB
Chief, POC, RSAO, Technical Assistant, OEDO, OGC, and
Agreement State IMPEP team member.
Distribution (NRC
paper copy):
ADAMS:
VI.
FSME-003 Template Instructions (Appendix A). Create a
package inserting the Final IMPEP Report and Letter;
Organization Charts, and State Response.
APPENDIX
Appendix A:
VII.
MRB Members; NRC Commission; and Agreement State
addressee.
ADAMS Profiling Template - FSME-003 (ML092450574)
REFERENCES
FSME Procedure SA-100, Implementation of the Integrated Materials Performance
Evaluation Program
VIII.
ADAMS REFERENCE DOCUMENTS
For knowledge management purposes, all previous revisions of this procedure, as well
as associated correspondence with stakeholders that have been entered into NRC’s
Agencywide Documents Access and Management System (ADAMS) are listed below.
No.
Date
1
8/31/06
Document Title/Description
STP Procedure AD-600
Accession Number
ML062730009
12/8/2009
APPENDIX A
DOCUMENT TYPE SUMMARY
FSME-003
DOCUMENT TYPE: Integrated Material Performance Evaluation Program (IMPEP)
Documents.
**Scheduling Letter, Draft Report, NRC Acknowledgement of State Response on Final
Report, Periodic Meeting Scheduling Letter, Periodic Meeting Summary, All Other
Periodic Meeting Materials/Documents, State Response to Questionnaire, State
Organizational Charts, State Response to Draft Report, Proposed Final Report, MRB
Meeting Minutes, Special MRB Memorandum, Final Report and State Response to Final
Report**
Special Instructions:
This template is to be used by the DPC and staff when processing Integrated Material
Performance Evaluation Program (IMPEP) prepared by the Office of Federal and State
Materials and Environmental Management Programs (FSME) or incoming to FSME that
meet requirements of an Official Agency Record, into ADAMS.
Profile Field Requirements for the DPC:
Item ID
System Assigned
Accession No.
Estimated Page Count
System Assigned
DPC Enter:
Document Date
DPC will input date printed/stamped on document.
Actual number of pages of file
Format is: MM/DD/YYYY
Document Type
Integrated Material Performance Evaluation
Program (IMPEP)-Agreement States
And
Other document types that apply, e.g., Letter, E-mail,
Memo.
Availability
Entered by FSME
Title
Entered by FSME
DPC Will Not Change
Author Name
Name of person who signed cover letter
Author Affiliation
Affiliation of person who signed cover letter
Addressee Name
Name of person cover letter is addressed to
Addressee Affiliation
Affiliation of person cover letter is addressed to
Docket No.
12/8/2009
License No.
Case/Reference No.
Document/Report Number
Keyword
Entered by FSME staff:
“FSME-003”
“DPC - Do Not Change Title"
“SUNSI Review Complete” if Publicly Available
Item Code (e.g., MD 3.4 Non-Public A.3) if NonPublicly Available
Note: Press Enter after each entry
Document Date Received
Date Docketed
Comment
Entered by FSME Staff:
LAN ID of person entering document into ADAMS
and KNM1
DPC will not add any value to this field
Vital Records Category
System Assigned
Document Status
Media Type
Electronic
Physical File Location
ADAMS
FACA Document
No
Date To Be Released
Entered by FSME if Publicly Available
Distribution List Codes
Entered by FSME if applicable
Contact Person
Entered by FSME
Text Source Flag
Entered by FSME:
Native Application
Official Record
System Assigned
Document Sensitivity
Entered by FSME
Entered by FSME:
Security Rights for the Document/Packages, please add:
Karen Meyer (knm1) – Owner
Aaron McCraw (atm) - Owner