- 1 - FRAMING CONTRACT THIS FRAMING CONTRACT (“Contract”), effective as of the date of the last party to sign
below, is between , having an address at ("Contractor") and , having an
address at ("Owner").
For valuable consideration the parties hereby agree as follows:1. SCOPE OF WORK: Framing shall be to the plans including all details. Floor joist layout shall
be as best to avoid plumbing for tubs and toilets. Framing includes the installation of sill plates;
rim joists; floor joists; sub flooring; plates; exterior and interior walls; ceiling joists; headers; rafters; roof
sheathing; sub fascia and fascia; bridging; joist hangers; rough framing materials for stair jacks, treads and
risers; collar ties; other attic bracing materials; roof overhang and soffit; rake boards; steel and/or wood
girders; columns and posts; sill sealer under the sill plates; sheathing and siding the exterior walls; siding
corners; interior and exterior decorative beams and posts; exterior moldings; drip edge/Z-bar (including
trim materials over z-bar); windows; exterior doors (excepting the garage door); frame and case garage
door as needed; back-out garage door as needed; ventilation materials; termite shield; furring blocks on
concrete walls; bracing; stiffbacks; backing blocks; nailing blocks; shimming windows and doors;
caulking and gluing continuous as needed; set all finish nails; insulation behind tubs located on exterior
walls; drywall behind tubs as required; box in vent areas; box in heat runs as required; framing for future
recessed fixtures; kitchen and bathroom cabinet drops; fire stopping as required; deck posts; deck girders;
deck floor joists and flooring; deck handrail and seating; deck stair jacks, treads and risers; and .
Contractor shall return all excess material and damaged materials. Contractor shall call for inspections of
the work as required.Fra m in g M ate ria ls :S il l I n su la tio n: T erm ite S hie ld : B rid gin g M ate ria l: Jo is t H an gers : S ub F lo o r M ate ria l: S iz e: G lu e: U nd erla y m en t M ate ria l: S iz e: G lu e: W all S heath in g M ate ria l: S iz e: C orn er B ra ce M ate ria l: W all S id in g M ate ria l: S iz e: R oo f S heath in g M ate ria l: S iz e: F li tc h P la te M ate ria l/S iz e: B olts : N ails -F ra m in g M em bers : S id in g: W in dow s: E xte rio r T rim : E xte rio r D oors : U se M ateri al Type Siz eS p acin gG rea te st S pan
Each S iz e S il l P la te N/A N/A Box Sill/Rim Joist N/A N/A 1st Floor-Floor Joists
- 2 - 2nd Floor-Floor Joists Ceiling Joists Rafters/Roof Trusses Exterior Studs Interior Studs Top & Bottom Plates N/A N/A Headers, Windows & Doors N/A Headers, Garage Door N/A Beams N/A Roof Bracing/Collar Ties Exterior Trim M ate ria l T yp e ThicknessSize Fascia Board Soffit Siding Corners Garage Door Trim Window Trim Door Trim Rake Board Exterior Beams Exterior Posts Flashing Material: Windows: Doors: Soffit Vents: Gable Vents: WINDOWS:Manufacturer/Style: Material: Insulated Glass: Screens: Storms: Grilles: Shutters: STAIRS: LOCATION JACKSTREADSRISERS MaterialSizeMaterialSize Material SizeBasement
- 3 - 1st Floor 2nd Floor Disappearing Stairs- Make and Model Number: EXTERIOR DOORS: (Including Storm Doors) Door Brand/Model/Material SizeThicknessHardwareFront Rear Sliding/Patio Garage 2. WORK SITE: The Project shall be constructed on the property of Owner located at and more
particularly described as (hereafter
"the Work Site"). Owner hereby authorizes Contractor to commence and complete the usual and
customary excavation and grading on the Work Site as may be required in the judgment of the
Contractor to complete the Project. Unless called for in the drawings or specifications, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before
.
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be included as part of
the Project price.5. INSURANCE: Contractor shall maintain general liability, workers compensation and builder's
risk insurance.6. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
out property lines to the Contractor. If the Owner or Contractor has any doubt about the location
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that
affect the Work Site.7. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the drawings and specifications, from time to time during the construction of
the Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the
- 4 - estimated cost.8.CONTRACT PRICE:{COST PLUS}Owner agrees to pay Contractor the actual cost to Contractor of
materials plus the sum of$ for performing the services set forth in the
scope of the work. Contractor shall be paid as follows:
.OR{FIXED FEE}Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.9.LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10)
days from the due date shall be deemed a material breach of this Contract. If payment is not made
when due, Contractor may suspend work on the job until such time as all payments due have been
made without breach of the Contract pending payment or resolution of any dispute. Owner agrees
to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the
rate of 1% per month.10. DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contractor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If the
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
either party, Contractor shall be excused from further performance under this Contract and Owner
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.11. ASSIGNMENT: Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.12.INTERPRETATION:(a)Interpretation of Documents. The Contract, drawings, and specifications are intended to
- 5 - supplement one another. In the event of a conflict, the specifications shall control the drawings,
and the Contract shall control both. If work is displayed on the drawings but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the drawings,
Contractor shall be required to perform the work as though it were called for and displayed in both
documents.(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exists
between the parties. This Contract may only be modified only by a written agreement signed by
both parties.(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
laws of the State of Rhode Island.13. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing party in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.14.PERFORMANCE:(a)Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
this Contract provided Contractor shall remain fully responsible for the proper completion of the
Project. (b) All work shall be completed in a workman-like manner and in compliance with all
building codes and applicable laws. To the extent required by law, all work shall be performed by
individuals duly licensed and authorized by law to perform said work.(c)Contractor agrees to remove all debris and leave the premises in broom clean condition.15.WARRANTY: Contractor's warranty shall be limited to due to improper framing labor
techniques, except for the following allowances: floor variance shall not exceed 1/4 inch in 32
inches, bowed or out of plumb walls shall not exceed 1/4 inch in 32 inches, non-excessive floor
squeaks or pops. All said defects arising after one (1) year and defects in material are not
warranted by Contractor. Contractor hereby assigns to Owner all warranties on materials as
provided by the manufacturer of such materials.
Contractor is covered with an insurer by an insurance policy that
will be in effect to cover the work described in this contract.
A permit is required for the work described in this contract. No
work will begin until the permit is obtained by the
Owner
Contractor.
AGREED:CONTRACTOR:OWNER:
- 6 - Signature Print Name & Title Date License Number Name and Address of License HolderSignature Print Name D ate
NOTICE OF POSSIBLE MECHANIC’S LIEN
To: __________________________ (Insert name of owner, lessee or
tenant, or owner of less than the simple fee.)The undersigned is about to perform work and/or furnish materials for
the construction, erection, alterations or repair upon the land at
__________________________ (insert address) under contract with you.
This is a notice that the undersigned and any other persons who
provide labor and materials for the improvement under contract with
the undersigned may file a mechanic's lien upon the land in the event
of nonpayment to them. It is your responsibility to assure yourself
that those other persons under contract with the undersigned receive
payment for their work performed and materials furnished for the
construction, erection, alteration or repair upon the land. Failure to
adhere to the provisions of this subsection may result in a one
thousand dollar ($1,000) fine against the contractor and shall not
affect the right of any other person performing work or furnishing
materials of claiming a lien pursuant to Chapter 34-28. However, such
person failing to provide such notice shall indemnify and hold
harmless any owner, lessee or tenant, or owner of less than the fee
simple from any payment or costs incurred on account of any liens
claims by those not in privity with them, unless such owner, lessee or
tenant, or owner of less than the fee simple shall not have paid such
person.
- 7 - * Optional notice required for door-to-door sales only:Notice to buyer: (1) Do not sign this agreement if any of the spaces
intended for the agreed terms to the extent of then available
information are left blank. (2) You are entitled to a copy of this
agreement at the time you sign it. (3) You may at any time pay off the
full unpaid balance due under this agreement, and in so doing you may
be entitled to receive a partial rebate of the finance and insurance
charges. (4) The seller has no right to unlawfully enter your premises
or commit any breach of the peace to repossess goods purchased under
this agreement. (5) You may cancel this agreement if it has not been
signed at the main office or a branch office of the seller, provided
you notify the seller at his or her main office or branch office shown
in the agreement by registered or certified mail, which shall be
posted not later than midnight of the third calendar day after the day
on which the buyer signs the agreement, excluding Sunday and any
holiday on which regular mail deliveries are not made. See the
attached notice of cancellation form for an explanation of buyer's
rights. Notice of Cancellation ___________________________ (date of transaction) You may cancel this transaction, without any penalty or obligation,
within three (3) business days from the above date. If you cancel,
your cancellation notice must state that you do not wish to be bound
by the agreement and mailed by registered or certified mail not later
than midnight three (3) days following the buyer's signing the
agreement, excluding Sunday and any holiday on which regular mail
deliveries are not made. All cancellations must be mailed to:
___________________________ (insert name and address of the seller). Notice of Cancellation ___________________________ (date of transaction) You may cancel this transaction, without any penalty or obligation,
within three (3) business days from the above date. If you cancel,
your cancellation notice must state that you do not wish to be bound
by the agreement and mailed by registered or certified mail not later
than midnight three (3) days following the buyer's signing the
agreement, excluding Sunday and any holiday on which regular mail
deliveries are not made. All cancellations must be mailed to:
___________________________ (insert name and address of the seller).
- 8 -
Practical advice on finalizing your ‘Joist Hangers’ online
Are you fed up with the inconvenience of managing paperwork? Look no further than airSlate SignNow, the leading eSignature platform for individuals and organizations. Bid farewell to the time-consuming process of printing and scanning documents. With airSlate SignNow, you can seamlessly complete and sign paperwork online. Utilize the powerful tools embedded in this user-friendly and economical platform and transform your method of document management. Whether you need to sign forms or gather electronic signatures, airSlate SignNow makes it all easy, with just a few clicks.
Follow this detailed guide:
- Access your account or sign up for a complimentary trial with our service.
- Click +Create to upload a file from your device, cloud storage, or our template collection.
- Open your ‘Joist Hangers’ in the editor.
- Click Me (Fill Out Now) to set up the form on your end.
- Add and designate fillable fields for others (if needed).
- Proceed with the Send Invite settings to solicit eSignatures from additional parties.
- Download, print your version, or convert it into a reusable template.
Don’t fret if you need to collaborate with others on your Joist Hangers or send it for notarization—our solution offers everything you require to complete those tasks. Create an account with airSlate SignNow today and elevate your document management to a new level!