Establishing secure connection… Loading editor… Preparing document…
Navigation

Fill and Sign the Plumbing Contract for Contractor Georgia Form

Fill and Sign the Plumbing Contract for Contractor Georgia Form

How it works

Open the document and fill out all its fields.
Apply your legally-binding eSignature.
Save and invite other recipients to sign it.

Rate template

4.8
51 votes
PLUMBING CONTRACT THIS PLUMBING CONTRACT (“Contract”), effective as of the date of the last party to sign below, is between       , having an address at       ("Contractor") and       , having an address at       ("Owner"). For valuable consideration the parties hereby agree as follows: 1. SCOPE OF WORK: Waste Disposal-Public: Private: Manufacturer, Model Number:       Disposal Field:       Water Supply-Public: Private: Pressure Reducing Valve-Make & Model:       Gas Supply-Public: Private: Gas Supply Type/Description Joint Treatment Pipe Size Main to House                   House to Fixtures                   Waste Disposal Type/Description Joint Treatment Pipe Size House to Main or Plant                   Under Basement Floor                   Above Basement Floor to Toilets                   Above Basement Floor to Sinks                   Above Basement Floor to                   Sump Pump                   Venting                   Flashing of Vents                   Water Supply Type/Description Joint Treatment Pipe Size Main to House                   House to Water Heater                   House to Bathrooms                   House to Kitchen Sink                   House to Refrigerator                   House to Dishwasher                   House to Ice Maker                   - 1 - Other                   Bathroom-Fixtures Model/Description Master Bath Guest Bath Bath #1 Bath #2 Water Closet                         Toilet Seat                         Shower                         Tub                         Tub Faucet & Control Lever                         Shower Faucet & Control                         Lavatory Faucet & Control                         Lavatory                         Bidet                         Whirlpool/Jacuzzi                         Location, Type & Number of: Water Stops/Shutoffs:       Location, Soft Water:       Exterior Water Faucets:       Fixture Description-Brand Name, Model Number, etc. Size/Other Kitchen Sink             Kit. Sink Faucet/Control             Waste Disposal             Wet Bar Sink             Bar Sink Faucet/Control             Washer Hook-up             Laundry Tub             Laundry Faucet/Control             Water Heater             Sump Pump             Water Softener             Other             Contractor shall provide all labor and materials, and perform all work necessary for the completion of the residence, structure, or improvements as described in the drawings and specifications signed by both Owner and Contractor (“Project”) Such drawings and - 2 - specifications are hereby made a part of this Contract. Drawings and specifications shall contain a scale drawing showing the shape, size, and dimensions of the construction and equipment together with a description of the work to be done, materials to be used, and the equipment to be used or installed. 2. WORK SITE: The Project shall be constructed on the property of Owner located at       and more particularly described as       (hereafter "the Work Site"). Owner hereby authorizes Contractor to commence and complete the usual and customary excavation and grading on the Work Site as may be required in the judgment of the Contractor to complete the Project. Unless called for in the drawings or specifications, no landscaping, finish grading, filling or excavation is to be performed at the Work Site by the Contractor. 3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this Contract on or before       and shall substantially complete the work on or before       . Contractor shall not be liable for any delay due to circumstances beyond its control including strikes, casualty, acts of God, illness, injury, or general unavailability of materials. 4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may be required by the local municipal/county government, the cost thereof shall be included as part of the Project price. 5. SOIL CONDITIONS: Contractor shall have no responsibility for the condition of the soils at the Work Site. Any excavation, filling or other work required by the Owner other than the usual and customary excavation and grading shall be agreed to in a Change Order for an amount in addition to the Contract Price. Contractor shall not be responsible for any damages suffered by Owner as a result of the soil conditions at the Work Site. 6. INSURANCE: Contractor shall maintain general liability, workers compensation and builder's risk insurance. 7. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point out property lines to the Contractor. If the Owner or Contractor has any doubt about the location of the property lines, Owner shall provide Contractor with boundary stakes through a licensed surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that affect the Work Site. 8. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work, including changes to the drawings and specifications, from time to time during the construction of the Project. However, any such change or modification shall only be made by written "Change Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the estimated cost. 9. CONTRACT PRICE: - 3 - {COST PLUS} Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of $       for performing the services set forth in the scope of the work. Contractor shall be paid as follows:                   . OR {FIXED FEE} Owner agrees to pay Contractor the sum of $       for performing the services set forth in the scope of the work. Contractor shall be paid as follows:                   . Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or materials provided at the time the next periodic payment shall be due. 10. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10) days from the due date shall be deemed a material breach of this Contract. If payment is not made when due, Contractor may suspend work on the job until such time as all payments due have been made without breach of the Contract pending payment or resolution of any dispute. Owner agrees to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the rate of 1% per month. 11. DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason, except where such destruction or damage was caused by the sole negligence of the Contractor or its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in rebuilding or restoring the Project to its condition prior to such destruction or damage. If the estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by either party, Contractor shall be excused from further performance under this Contract and Owner shall pay Contractor a percentage of the Contract price in proportion to the amount of work accomplished prior to the destruction or damage. 12. ASSIGNMENT : Neither party may assign this Contract, or payments due under the Contract, without the other party’s written consent. Any such assignment shall be void and of no effect. 13. INTERPRETATION: (a) Interpretation of Documents. The Contract, drawings, and specifications are intended to supplement one another. In the event of a conflict, the specifications shall control the drawings, and the Contract shall control both. If work is displayed on the drawings but not called for in the specifications, or if the work is called for in the specifications but not displayed on the drawings, Contractor shall be required to perform the work as though it were called for and displayed in both documents. - 4 - (b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other agreements, oral or written, pertaining to the work to be performed under this Contract exists between the parties. This Contract may only be modified only by a written agreement signed by both parties. (c) Governing Law. This Contract shall be interpreted and governed in accordance with the laws of the State of Georgia. 14. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action against the other party arising from or relating to this Contract, the prevailing party in such proceeding shall be entitled to recover reasonable attorney fees and court costs. 15. PERFORMANCE: (a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant this Contract provided Contractor shall remain fully responsible for the proper completion of the Project. (b) All work shall be completed in a workman-like manner and in compliance with all building codes and applicable laws. To the extent required by law, all work shall be performed by individuals duly licensed and authorized by law to perform said work. (c) Contractor agrees to remove all debris and leave the premises in broom clean condition. 16 . WARRANTY: 1. SCOPE AND DURATION. ________________________________ , whose business address is ________________________________ , as warrantor (“Contractor”),warrants to the above- named Owner (“Owner”), for a period of one (1) year from the date of Substantial Completion (“Warranty Period”), as more specifically defined in the Construction Contract between Owner and Contractor (the “Contract”), that all repairs, renovations, or other remodeling undertaken by Contractor to the Project, except such repairs, renovations, or other remodeling specifically excluded below, substantially conform with the Construction Standards set forth in the Agreement. 2. WARRANTOR’S DUTY. Upon receiving notice during the Warranty Period, as described in by Article 5 below, of any defect covered by this Limited Warranty, Contractor, at its sole option and expense, shall repair, replace, or pay reasonable sums necessary to make such repairs to conform with the Construction Standards set forth in the Contract. This Limited Warranty does not cover minor cosmetic flaws which were not listed in the Project List. 3. EXCLUSIONS. A. This Limited Warranty does not cover consumer products for the purpose of the Magnuson- Moss Warranty Act, 15 U.S.C. Sec. 2301 et seq. Contractor’s only duty with respect to items not warranted by Contractor shall be to assign and deliver to the Owner all manufacturers’ and suppliers’ warranties that by their terms are assignable covering consumer products, including appliances, fixtures, finishes, and other equipment installed in and provided with the Project. Contractor is in no way responsible for performance under any manufacturer’s or supplier’s - 5 - warranties. B. This Limited Warranty covers only items that have been repaired, renovated, or otherwise improved by Contractor under the Contract between Owner and Contractor. This Limited Warranty does not cover repairs, renovations, or other remodeling work not undertaken by Contractor; defects resulting from improper maintenance, misuse, abuse, or failure of Owner to follow operating instructions; and defects or damage resulting from fires, floods, storms, the elements, electrical malfunctions, accidents, or acts of God. C. Under no circumstances shall Contractor be responsible by virtue of this Limited Warranty or otherwise for any secondary damages to a person or Project arising from the use or inability to use the Project because of a defect, whether such damages are incidental or consequential. D. This Limited Warranty covers only construction activities on or within the residence. This Limited Warranty does not cover defects in recreational facilities, swimming pools, fences, driveways, landscaping, or other improvements which are not a part of the home. 4. OTHER RIGHTS. This Limited Warranty is in addition to any rights that the Owner may have under state, federal, and local laws, including but not limited to rights under applicable governmental codes, regulations or local ordinances. If the current edition of the Residential Construction Performance Guidelines as published by the National Association of Home Builders (“Guidelines”) includes a standard for specific work or activities covered by this Limited Warranty that is more stringent than one in the Homeowner Handbook, the Guidelines standard shall apply. 5. WARRANTY PROCEDURES. If Owner discovers a defect during the Warranty Period which is covered by this Limited Warranty, Owner shall notify Contractor in writing within nine (9) days of discovery, describing in specific terms the nature of such defect. Upon receipt of the written statement, Contractor’s representatives will meet with Owner, inspect the item, and shall make efforts to have any defect covered by this Limited Warranty corrected within a reasonable period of time. If such discovery is made within nine (9) days prior to the expiration of the Warranty Period, Owner must also notify Contractor by phone within twenty-four (24) hours of such discovery at the address and number provided below. NOTWITHSTANDING ANY OTHER PROVISION HEREOF, WARRANTOR SHALL HAVE NO LIABILITY HEREUNDER UNLESS OWNER COMPLIES WITH ALL APPLICABLE NOTICE REQUIREMENTS PROVIDED HEREIN. The notice must be delivered to the following address: Street Address ________________________________ , City ________________________________ , Georgia, Zip Code: _______________ . Contractor's phone number for notice within 24 hours of discovery of defects is ________________________________ . 17. DISPUTE RESOLUTION NOTICE TO OWNER : GEORGIA LAW CONTAINS IMPORTANT REQUIREMENTS YOU MUST FOLLOW BEFORE YOU MAY FILE A LAWSUIT OR OTHER ACTION FOR DEFECTIVE CONSTRUCTION AGAINST THE CONTRACTOR WHO CONSTRUCTED, IMPROVED, OR REPAIRED YOUR HOME. NINETY DAYS BEFORE YOU FILE YOUR LAWSUIT OR OTHER ACTION, YOU MUST SERVE ON THE CONTRACTOR A WRITTEN NOTICE OF ANY CONSTRUCTION CONDITIONS YOU ALLEGE ARE DEFECTIVE. UNDER THE LAW, A CONTRACTOR HAS THE OPPORTUNITY TO MAKE AN OFFER TO REPAIR OR PAY FOR THE DEFECTS OR BOTH. YOU ARE NOT OBLIGATED TO ACCEPT ANY OFFER MADE BY A - 6 - CONTRACTOR. THERE ARE STRICT DEADLINES AND PROCEDURES UNDER STATE LAW, AND FAILURE TO FOLLOW THEM MAY AFFECT YOUR ABILITY TO FILE A LAWSUIT OR OTHER ACTION. *optional notice to include in installment contracts: Notice to the Buyer Do not sign this before you read it or if it contains any blank spaces. You are entitled to an exact copy of the paper you sign. You have the right to pay in advance the full amount due and under certain conditions to obtain a partial refund of the time price differential. AGREED: CONTRACTOR: Signature       Print Name & Title       Date       License Number       Name and Address of License Holder OWNER: Signature       Print Name       Date       Address of Owner - 7 -

Practical advice for finalizing your ‘Plumbing Contract For Contractor Georgia’ online

Are you fed up with the inconvenience of handling paperwork? Look no further than airSlate SignNow, the premier electronic signature solution for individuals and businesses. Bid farewell to the monotonous routine of printing and scanning documents. With airSlate SignNow, you can effortlessly finish and sign papers online. Take advantage of the robust features incorporated within this user-friendly and cost-effective platform and transform your method of document management. Whether you need to authorize forms or collect signatures, airSlate SignNow manages it all seamlessly, requiring just a few clicks.

Follow this detailed guide:

  1. Access your account or sign up for a complimentary trial with our service.
  2. Select +Create to upload a document from your device, cloud, or our template repository.
  3. Open your ‘Plumbing Contract For Contractor Georgia’ in the editor.
  4. Select Me (Fill Out Now) to finalize the document on your end.
  5. Insert and designate fillable fields for others (if necessary).
  6. Proceed with the Send Invite options to solicit eSignatures from others.
  7. Save, print your version, or convert it into a reusable template.

No need to worry if you need to collaborate with your colleagues on your Plumbing Contract For Contractor Georgia or send it for notarization—our platform provides everything required to complete such operations. Register with airSlate SignNow today and elevate your document management to new levels!

Here is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.

Need help? Contact Support
Plumbing contract for contractor georgia template
Plumbing contract for contractor georgia sample
Plumbing contract for contractor georgia pdf
Free plumbing contract for contractor georgia
Specialty contractor license Georgia
Georgia plumbing license reciprocity
Georgia Plumbing license test
Georgia plumbing license search

The best way to complete and sign your plumbing contract for contractor georgia form

Save time on document management with airSlate SignNow and get your plumbing contract for contractor georgia form eSigned quickly from anywhere with our fully compliant eSignature tool.

How to Sign a PDF Online How to Sign a PDF Online

How to complete and sign forms online

In the past, dealing with paperwork required lots of time and effort. But with airSlate SignNow, document management is quick and simple. Our powerful and user-friendly eSignature solution enables you to easily complete and eSign your plumbing contract for contractor georgia form online from any internet-connected device.

Follow the step-by-step guide to eSign your plumbing contract for contractor georgia form template online:

  • 1.Register for a free trial with airSlate SignNow or log in to your account with password credentials or SSO authorization option.
  • 2.Click Upload or Create and import a form for eSigning from your device, the cloud, or our form collection.
  • 3.Click on the file name to open it in the editor and use the left-side menu to complete all the empty areas accordingly.
  • 4.Put the My Signature field where you need to eSign your form. Provide your name, draw, or upload a photo of your regular signature.
  • 5.Click Save and Close to finish modifying your completed form.

As soon as your plumbing contract for contractor georgia form template is ready, download it to your device, export it to the cloud, or invite other parties to eSign it. With airSlate SignNow, the eSigning process only requires a couple of clicks. Use our robust eSignature solution wherever you are to manage your paperwork successfully!

How to Sign a PDF Using Google Chrome How to Sign a PDF Using Google Chrome

How to fill out and sign documents in Google Chrome

Completing and signing documents is simple with the airSlate SignNow extension for Google Chrome. Installing it to your browser is a quick and efficient way to deal with your paperwork online. Sign your plumbing contract for contractor georgia form sample with a legally-binding eSignature in just a couple of clicks without switching between applications and tabs.

Follow the step-by-step guidelines to eSign your plumbing contract for contractor georgia form in Google Chrome:

  • 1.Go to the Chrome Web Store, find the airSlate SignNow extension for Chrome, and install it to your browser.
  • 2.Right-click on the link to a document you need to eSign and select Open in airSlate SignNow.
  • 3.Log in to your account with your credentials or Google/Facebook sign-in option. If you don’t have one, sign up for a free trial.
  • 4.Use the Edit & Sign toolbar on the left to fill out your template, then drag and drop the My Signature option.
  • 5.Insert a photo of your handwritten signature, draw it, or simply type in your full name to eSign.
  • 6.Verify all data is correct and click Save and Close to finish editing your paperwork.

Now, you can save your plumbing contract for contractor georgia form sample to your device or cloud storage, email the copy to other people, or invite them to electronically sign your document via an email request or a protected Signing Link. The airSlate SignNow extension for Google Chrome enhances your document workflows with minimum time and effort. Try airSlate SignNow today!

How to Sign a PDF in Gmail How to Sign a PDF in Gmail How to Sign a PDF in Gmail

How to complete and sign paperwork in Gmail

When you get an email containing the plumbing contract for contractor georgia form for approval, there’s no need to print and scan a document or download and re-upload it to a different program. There’s a much better solution if you use Gmail. Try the airSlate SignNow add-on to rapidly eSign any paperwork right from your inbox.

Follow the step-by-step guide to eSign your plumbing contract for contractor georgia form in Gmail:

  • 1.Visit the Google Workplace Marketplace and locate a airSlate SignNow add-on for Gmail.
  • 2.Set up the program with a related button and grant the tool access to your Google account.
  • 3.Open an email containing an attached file that needs signing and use the S symbol on the right panel to launch the add-on.
  • 4.Log in to your airSlate SignNow account. Select Send to Sign to forward the file to other people for approval or click Upload to open it in the editor.
  • 5.Place the My Signature option where you need to eSign: type, draw, or import your signature.

This eSigning process saves efforts and only takes a couple of clicks. Use the airSlate SignNow add-on for Gmail to adjust your plumbing contract for contractor georgia form with fillable fields, sign documents legally, and invite other individuals to eSign them al without leaving your mailbox. Boost your signature workflows now!

How to Sign a PDF on a Mobile Device How to Sign a PDF on a Mobile Device How to Sign a PDF on a Mobile Device

How to fill out and sign paperwork in a mobile browser

Need to quickly complete and sign your plumbing contract for contractor georgia form on a mobile phone while doing your work on the go? airSlate SignNow can help without the need to install extra software applications. Open our airSlate SignNow tool from any browser on your mobile device and add legally-binding eSignatures on the go, 24/7.

Follow the step-by-step guidelines to eSign your plumbing contract for contractor georgia form in a browser:

  • 1.Open any browser on your device and go to the www.signnow.com
  • 2.Create an account with a free trial or log in with your password credentials or SSO option.
  • 3.Click Upload or Create and import a file that needs to be completed from a cloud, your device, or our form library with ready-made templates.
  • 4.Open the form and complete the empty fields with tools from Edit & Sign menu on the left.
  • 5.Add the My Signature area to the sample, then type in your name, draw, or add your signature.

In a few easy clicks, your plumbing contract for contractor georgia form is completed from wherever you are. Once you're finished editing, you can save the document on your device, build a reusable template for it, email it to other individuals, or invite them eSign it. Make your documents on the go prompt and productive with airSlate SignNow!

How to Sign a PDF on iPhone How to Sign a PDF on iPhone

How to fill out and sign paperwork on iOS

In today’s business community, tasks must be completed quickly even when you’re away from your computer. Using the airSlate SignNow app, you can organize your paperwork and approve your plumbing contract for contractor georgia form with a legally-binding eSignature right on your iPhone or iPad. Install it on your device to close deals and manage documents from anyplace 24/7.

Follow the step-by-step guide to eSign your plumbing contract for contractor georgia form on iOS devices:

  • 1.Open the App Store, search for the airSlate SignNow app by airSlate, and install it on your device.
  • 2.Open the application, tap Create to import a template, and choose Myself.
  • 3.Opt for Signature at the bottom toolbar and simply draw your signature with a finger or stylus to eSign the sample.
  • 4.Tap Done -> Save right after signing the sample.
  • 5.Tap Save or utilize the Make Template option to re-use this document in the future.

This process is so straightforward your plumbing contract for contractor georgia form is completed and signed within a couple of taps. The airSlate SignNow app works in the cloud so all the forms on your mobile device are kept in your account and are available any time you need them. Use airSlate SignNow for iOS to improve your document management and eSignature workflows!

How to Sign a PDF on Android How to Sign a PDF on Android

How to complete and sign paperwork on Android

With airSlate SignNow, it’s simple to sign your plumbing contract for contractor georgia form on the go. Install its mobile application for Android OS on your device and start enhancing eSignature workflows right on your smartphone or tablet.

Follow the step-by-step guidelines to eSign your plumbing contract for contractor georgia form on Android:

  • 1.Open Google Play, find the airSlate SignNow app from airSlate, and install it on your device.
  • 2.Log in to your account or create it with a free trial, then upload a file with a ➕ option on the bottom of you screen.
  • 3.Tap on the uploaded file and select Open in Editor from the dropdown menu.
  • 4.Tap on Tools tab -> Signature, then draw or type your name to eSign the template. Fill out empty fields with other tools on the bottom if required.
  • 5.Utilize the ✔ key, then tap on the Save option to end up with editing.

With a user-friendly interface and total compliance with primary eSignature requirements, the airSlate SignNow application is the perfect tool for signing your plumbing contract for contractor georgia form. It even works offline and updates all form modifications once your internet connection is restored and the tool is synced. Fill out and eSign forms, send them for approval, and generate re-usable templates whenever you need and from anyplace with airSlate SignNow.

Sign up and try Plumbing contract for contractor georgia form
  • Close deals faster
  • Improve productivity
  • Delight customers
  • Increase revenue
  • Save time & money
  • Reduce payment cycles