PLUMBING CONTRACT
THIS PLUMBING CONTRACT  (“Contract”), effective as of the date of the last party 
to sign below, is between        ,                                                              	
having an address at                             ("Contractor")
For valuable consideration the parties hereby agree as follows: 
1. SCOPE OF WORK:  
Waste Disposal-Public: 	Private: 	
   Manufacturer, Model Number:      
   Disposal Field:      
Water Supply-Public: 	Private: 	
   Pressure Reducing Valve-Make & Model:      
Gas Supply-Public: 	Private: 	
Gas Supply	Type/Description	Joint Treatment	Pipe Size	
Main to House	     	     	     	
House to Fixtures	     	     	     	
Waste Disposal	Type/Description	Joint Treatment	Pipe Size	
House to Main or Plant	     	     	     	
Under Basement Floor	     	     	     	
Above Basement Floor to Toilets	     	     	     	
Above Basement Floor to Sinks	     	     	     	
Above Basement Floor to 	     	     	     	
Sump Pump	     	     	     	
Venting	     	     	     	
Flashing of Vents	     	     	     	
Water Supply	Type/Description	Joint Treatment	Pipe Size	
Main to House	     	     	     	
House to Water Heater	     	     	     	
House to Bathrooms	     	     	     	
House to Kitchen Sink	     	     	     	
House to Refrigerator	     	     	     	
House to Dishwasher
House to Ice Maker	     	     	     	
Other	     	     	     	
Bathroom-Fixtures	Model/Description	
Master Bath	Guest Bath	Bath #1	Bath #2	
Water Closet	     	     	     	     	
Toilet Seat	     	     	     	     	
Shower	     	     	     	     	
Tub	     	     	     	     	
Tub Faucet & Control Lever	     	     	     	     	
Shower Faucet & Control 	     	     	     	     	
Lavatory Faucet & Control	     	     	     	     	
Lavatory	     	     	     	     	
Bidet	     	     	     	     	
Whirlpool/Jacuzzi	     	     	     	     	
Location, Type & Number of:	
Water Stops/Shutoffs:      
Location, Soft Water:      
Exterior Water Faucets:      	
Fixture	Description-Brand Name, Model Number, etc.	Size/Other	
Kitchen Sink	     	     	
Kit. Sink Faucet/Control	     	     	
Waste Disposal	     	     	
Wet Bar Sink	     	     	
Bar Sink Faucet/Control 	     	     	
Washer Hook-up	     	     	
Laundry Tub	     	     	
Laundry Faucet/Control	     	     	
Water Heater	     	     	
Sump Pump	     	     	
Water Softener	     	     	
Other
Contractor  shall  provide  all  labor  and  materials,  and  perform  all  work  necessary  for  
the  completion  of  the  residence,  structure,  or  improvements  as  described  in  the 
drawings  and  specifications  signed  by  both  Owner  and  Contractor  (“Project”)  Such 
drawings  and  specifications  are  hereby  made  a  part  of  this  Contract.  Drawings  and 
specifications  shall  contain  a scale  drawing  showing the  shape,  size,  and dimensions 
of the construction and equipment together with a description of the work to be done, 
materials to be used, and the equipment to be used or installed.
2. WORK SITE:    The Project shall be constructed on the property of Owner located at       	
3. TIME  OF  COMPLETION:     Contractor  shall  commence  the  work  to  be  performed 
under this Contract on or before         and shall substantially
4. PERMITS:   Contractor  shall  apply  for  and  obtain  such  permits  and  regulatory 
approvals as may be required by the local municipal/county government, the cost thereof  
shall be included as part of the Project price.
5. SOIL  CONDITIONS:    Contractor  shall  have  no  responsibility  for  the  condition  of  the 
soils  at  the  Work  Site.   Any  excavation,  filling  or  other  work  required  by  the  Owner 
other than the usual and customary excavation and grading shall be agreed to in a  Change 
Order  for  an  amount  in  addition  to  the  Contract  Price.   Contractor  shall  not  be 
responsible  for  any  damages  suffered  by  Owner  as  a  result  of  the  soil  conditions  at  the 
Work Site.
6. INSURANCE:    Contractor  shall  maintain  general  liability,  workers  compensation  and 
builder's risk insurance.
7. SURVEY  AND  TITLE:    If  the  Project  is  near  the  Owner’s  property  boundary,  Owner 
will  point  out  property  lines  to  the  Contractor.  If  the  Owner  or  Contractor  has  any  doubt 
about  the  location  of  the  property  lines,  Owner  shall  provide  Contractor  with  boundary 
stakes  through  a  licensed  surveyor.  In  addition,  Owner  shall  provide  Contractor 
documentation  that  Owner has  title to  the Work  Site  and shall  provide  Contractor  c opies 
of any covenants, conditions, or restrictions that affect the Work Site.
8. CHANGES  TO  SCOPE  OF  WORK:    Owner  may  make  changes  to  the  scope  of  the 
work, including changes to the drawings and specifications, from time to time during the  
construction  of  the  Project.   However,  any  such  change  or  modification  shall  only  be 
made  by  written  "Change  Order"  signed  by  both  parties.   Such  Change  Orders  shall 
become  part  of  this  Contract.   Owner  agrees  to  pay  any  increase  in  the  cost  of  the 
Project  as  a  result  of  a  Change  Order.   In  the  event  the  cost  of  a  Change  Order  is  not 
known  at  the  time  a  Change  Order  is  executed,  the  Contractor  shall  estimate  t he  cost 
thereof and Owner shall pay the actual cost whether or not it is in excess of the e stimated 
cost.
9. CONTRACT PRICE:
{COST PLUS} 
Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of  
$       for performing the services set forth in the scope of the work.  
Contractor shall be paid as follows:      
     
     
OR 
{FIXED FEE}
Owner agrees to pay Contractor the sum of $      for performing the 
services set forth in the scope of the work.   Contractor shall be paid as follows:      
     
     
Contractor  shall  furnish  Owner  appropriate  releases  or  waivers  of  lien  for  all  work  
performed or materials provided at the time the next periodic payment shall be due.
10. LATE  PAYMENT/DEFAULT:    A  failure  to  make  payment  for  a  period  in  excess  of 
ten  (10)  days  from  the  due  date  shall  be  deemed  a  material  breach  of  this  Contrac t.  If 
payment is not made when due, Contractor may suspend work on the job until such time 
as  all  payments  due  have  been  made  without  breach  of  the  Contract  pending  payment  or 
resolution  of  any  dispute.  Owner  agrees  to  pay  a  late  charge  of  1%  of  all  payments  that  
are more than ten (10) days late plus interest at the rate of 1% per month.
11. DESTRUCTION  AND  DAMAGE :   If  the  Project  is  destroyed  or  damaged  for  any 
reason,  except  where  such  destruction  or  damage  was  caused  by  the  sole  negligence  of 
the  Contractor  or  its  subcontractors,  Owner  shall  pay  Contractor  for  any  additional  work 
done  by  Contractor  in  rebuilding  or  restoring  the  Project  to  its  condition  prior  to  such 
destruction  or  damage.  If  the  estimated  cost  of  replacing  work  already  accomplishe d  by 
Contractor exceeds 20 percent of the Contract price, either the Contractor or Owner  may 
terminate  this  Contract.  Upon  termination  by  either  party,  Contractor  shall  be  exc used 
from  further  performance  under  this  Contract  and  Owner  shall  pay  Contractor  a 
percentage  of the Contract  price in proportion to the amount of work accomplished  prior 
to the destruction or damage.
12. ASSIGNMENT :   Neither  party  may  assign  this  Contract,  or  payments  due  under  the 
Contract,  without  the  other  party’s  written  consent.  Any  such  assignment  shall  be  void 
and of no effect.
13. INTERPRETATION:
(a) Interpretation  of  Documents.  The  Contract,  drawings,  and  specifications  are 
intended  to  supplement  one  another.  In  the  event  of  a  conflict,  the  specifications  sha ll 
control  the  drawings,  and  the  Contract  shall  control  both.  If  work  is  displayed  on  the  
drawings  but  not  called  for  in  the  specifications,  or  if  the  work  is  called  for  in  t he 
specifications  but not displayed on the drawings, Contractor shall be required to perform 
the work as though it were called for and displayed in both documents. 
(b) Entire  Agreement.   This  Contract  constitutes  the  entire  agreement  of  the  parties. 
No  other  agreements,  oral  or  written,  pertaining  to  the  work  to  be  performed  under  this  
Contract  exists  between  the  parties.  This  Contract  may  only  be  modified  only  by  a 
written agreement signed by both parties. 
(c) Governing  Law.   This  Contract  shall  be  interpreted  and  governed  in  accordance 
with the laws of the State of Montana.
14. ATTORNEYS’  FEES  AND  COSTS:    If  any  party  to  this  Contract  brings  a  cause  of 
action against the other party arising from or relating to this Contract, the preva iling party 
in such proceeding shall be entitled to recover reasonable attorney fees and court costs.
15. PERFORMANCE: (a) Contractor may, at its discretion, engage licensed subcontractors to perform work  
pursuant  this  Contract  provided  Contractor  shall  remain  fully  responsible  for  the  proper 
completion of the Project.  
(b) All  work  shall  be  completed  in  a  workman-like  manner  and  in  compliance  with  
all  building  codes  and  applicable  laws.  To  the  extent  required  by  law,  all  work  shal l  be 
performed by individuals duly licensed and authorized by law to perform said work. 
(c) Contractor  agrees  to  remove  all  debris  and  leave  the  premises  in  broom  clea n 
condition.
16. WARRANTY:    Contractor  agrees  to  repair  or  replace  any  defective  or  malfunctioning 
faucets, valves, fixtures, equipment or fittings for a period of         year(s). 
Contractor  agrees  to  eliminate  excessive  pipe  hammering  and  repair  or  replace  any  soil, 
waste,  venting  or  water  piping  found  to  be  leaking  (except  condensation)  or  improper  
flow of supply or effluent due to an obstruction caused by settling or foreign matter in the 
piping  at  the  time  of  installation  or  infiltrating  thereafter,  for  a  period  of         year(s). 
Owner  and  Contractor  agree  to  inspect  all  equipment,  fixtures,  and  piping  within        
days  after  installation;  and  Contractor  agrees  to  repair  or  replace  any  chips,  crac ked, 
defective or otherwise malfunctioning items be found by such inspection. All said defects  
arising  after         year(s)  and  defects  in  material  are  not  warranted  by  Contractor. 
Contractor  hereby  assigns  to  Owner  all  warranties  on  materials  as  provided  by  the  
manufacturer of such materials.
AGREED:
CONTRACTOR:
Signature      
Print Name & Title      
Date      
License Number      
Name and Address of License Holder	
OWNER:
Signature      
Print Name      
Date
* Optional provisions required only for retail installment contracts:Notice to the Buyer.
Do not sign this contract before you read it or if it contains any blank spaces. You are entitled to  
an exact copy of the contract you sign. Under the law, you have the right to pay off in advance 
the full amount due and to obtain a partial refund of the finance charge. 
  I, the Buyer, have received a completed copy of the contract.____________________________________ 
Buyer's Signature ____________________________________ 
Buyer's Residence ___________________________________ 
Date of Acknowledgement of Receipt 
The cash price of the goods and services which are the subject matter of the sale is  ____________________________. 
  Collateral has been given as security for payment and is described as :  ____________________________.
The amount of the buyer's down payment is $____________.
  This includes an allowance given by the contractor of $_____________.
  The amounts paid in money is $___________.
  The amount paid in goods, described as ____________________________, is $___________. 
The unpaid cash balance is $___________.
Insurance Premium Payments (if applicable):
a. Type of insurance: ____________________ Term of insurance: ___________ Premium paid:  
$___________ To be procured by:   Buyer   Contractor 
b. Type of insurance: ____________________ Term of insurance: ___________ Premium paid:  
$___________ To be procured by:   Buyer   Contractor 
The amount of official fees, if any, is $___________.
The principal amount financed is $___________.
The amount of the finance charge is $___________.
The time balance, which is the sum of the principal amount financed and finance charge, payable  
by the buyer to the contractor is $___________. 
The number of installments required is ___________.
The amount of each installment is $___________.
The due date or period of each installment is ___________. 
The time sale price, which is the total of the cash price of the goods and services or services, the 
finance  charge,  and  the  amounts,  if  any,  included  for  insurance  premiums  and  official  fee s,  is 
$___________.
            
                     
    Useful advice on setting up your ‘Quotcon’ online
Are you fed up with the inconvenience of managing paperwork? Look no further than airSlate SignNow, the premier eSignature solution for individuals and organizations. Bid farewell to the lengthy procedure of printing and scanning documents. With airSlate SignNow, you can effortlessly complete and sign documents online. Take advantage of the comprehensive tools available in this intuitive and cost-effective platform and transform your document management approach. Whether you need to approve forms or collect signatures, airSlate SignNow makes it all straightforward, with just a few clicks.
Adhere to this step-by-step guide:
    - Sign in to your account or sign up for a complimentary trial with our service.
- Click +Create to upload a file from your device, cloud storage, or our template collection.
- Open your ‘Quotcon’ in the editor.
- Click Me (Fill Out Now) to prepare the document on your side.
- Add and assign fillable fields for others (if necessary).
- Continue with the Send Invite settings to request eSignatures from others.
- Download, print your copy, or convert it into a reusable template.
No need to worry if you need to collaborate with colleagues on your Quotcon or send it for notarization—our platform provides everything necessary to accomplish these tasks. Create an account with airSlate SignNow today and enhance your document management to a new level!