How to Increase Sanctioned Load in BESCOM Effectively

Understanding sanctioned load in BESCOM

Sanctioned load refers to the maximum electrical load that a consumer is permitted to draw from the electricity supply. In BESCOM (Bangalore Electricity Supply Company), this load is specified in kilowatts (kW) or kilovolt-amperes (kVA). Understanding your sanctioned load is crucial for ensuring that your electrical system can handle your consumption without exceeding limits that could lead to penalties or service interruptions. For residential and commercial consumers, knowing how to increase this sanctioned load is essential when expanding electrical needs arise, such as adding appliances or equipment.

Eligibility criteria for load enhancement

Before initiating the process to increase your sanctioned load, it is important to determine your eligibility. The following criteria typically apply:

  • Existing connection: You must have an active electricity connection with BESCOM.
  • Compliance with regulations: Your premises must comply with all local electrical regulations and safety standards.
  • Payment status: Ensure that all previous electricity bills are paid, as outstanding dues may hinder your application.

Additional requirements may vary based on the type of consumer, such as residential, commercial, or industrial users.

Required documents for application

When applying for a load enhancement with BESCOM, you will need to gather several documents to support your application. These may include:

  • Application form: A completed load enhancement form, which can often be found online.
  • Identity proof: Government-issued identification, such as a driver's license or passport.
  • Address proof: Documentation that verifies your residential or business address.
  • Electrical inspection report: A report from a licensed electrician confirming that your internal wiring can handle the increased load.
  • Previous bills: Copies of recent electricity bills to demonstrate your consumption history.

Steps to complete the load enhancement application

The process to increase your sanctioned load generally involves several key steps:

  1. Visit the BESCOM website: Navigate to the official BESCOM site to access the load enhancement form.
  2. Fill out the application: Complete the load enhancement form with accurate details, specifying the required increase in kW or kVA.
  3. Submit documents: Attach all required documents to your application, ensuring they are current and valid.
  4. Electrical inspection: Schedule an inspection with a licensed electrician to verify your internal wiring's capacity.
  5. Payment of fees: Pay any applicable fees associated with the load enhancement process.
  6. Await approval: After submission, monitor the status of your application through the BESCOM portal or by contacting customer service.

Potential fees and charges

Increasing your sanctioned load may involve various fees, which can include:

  • Application fee: A nominal fee for processing your load enhancement application.
  • Inspection fee: Charges for the electrical inspection conducted by a licensed professional.
  • Connection fee: If applicable, a fee for modifying your connection to accommodate the increased load.

It is advisable to check the current fee structure on the BESCOM website or contact customer service for the most accurate information.

Common reasons for load enhancement requests

There are several scenarios where a load enhancement request may be necessary:

  • New appliances: Adding high-demand appliances, such as air conditioners or electric heaters, may require a higher sanctioned load.
  • Business expansion: Businesses may need to increase their load to support additional equipment or machinery.
  • Renovations: Home renovations that include electrical upgrades can necessitate a load increase to meet new demands.

Understanding the approval timeline

The time it takes for BESCOM to process a load enhancement application can vary based on several factors:

  • Completeness of application: A complete application with all required documents is processed more quickly.
  • Inspection scheduling: The availability of licensed electricians for inspections can affect the timeline.
  • Internal processing times: BESCOM's internal review and approval processes may also influence how long it takes to receive a decision.

Typically, consumers can expect to wait anywhere from a few days to several weeks for their application to be processed.

Consequences of exceeding sanctioned load

Exceeding your sanctioned load can lead to several consequences, including:

  • Penalties: BESCOM may impose fines or additional charges for exceeding the sanctioned limit.
  • Service interruptions: Continuous overloading can result in the disconnection of your electricity supply.
  • Increased scrutiny: Frequent violations may lead to closer monitoring of your electricity usage.

To avoid these issues, it is important to ensure that your sanctioned load meets your actual consumption needs.

By signNow's Team
By signNow's Team
December 30, 2025
GO BEYOND ESIGNATURES

Business Cloud

Automate business processes with the ultimate suite of tools that are customizable for any use case.

  • Award-winning eSignature. Approve, deliver, and eSign documents to conduct business anywhere and anytime.
  • End-to-end online PDF editor. Create, edit, and manage PDF documents and forms in the cloud.
  • Online library of 85K+ state-specific legal forms. Find up-to-date legal forms and form packages for any use case in one place.