- 1 - PLUMBING CONTRACT THIS PLUMBING CONTRACT (“Contract”), effective as of the date of the last party to sign
below, is between , having an address at ("Contractor") and , having an
address at ("Owner").
For valuable consideration the parties hereby agree as follows:1. SCOPE OF WORK: Waste D is p osa l- P ublic : P riv ate : M an ufa ctu re r, M odel N um ber: D is p osa l F ie ld : W ate r S upply -P ublic : P riv ate : P re ssu re R ed ucin g V alv e-M ak e & M odel: G as S up ply -P ubli c : P riv ate : Gas Supply Type/DescriptionJoint TreatmentPipe Size Main to House House to Fixtures W aste D is p osa l Type/Description Joint TreatmentPipe SizeHouse to Main or Plant Under Basement Floor Above Basement Floor to Toilets Above Basement Floor to Sinks Above Basement Floor to Sump Pump Venting Flashing of Vents Water Supply Type/Description Joint Treatment Pipe Size Main to House House to Water Heater House to Bathrooms House to Kitchen Sink House to Refrigerator House to Dishwasher House to Ice Maker
- 2 - Other Bathroom-Fixtures Model/Description Master Bath Guest BathBath #1Bath #2 Water Closet Toilet Seat Shower Tub Tub Faucet & Control Lever Shower Faucet & Control Lavatory Faucet & Control Lavatory Bidet Whirlpool/Jacuzzi Location, Type & Number of: Water Stops/Shutoffs: Location, Soft Water: Exterior Water Faucets: Fixture Description-Brand Name, Model Number, etc. Size/Other Kitchen Sink Kit. Sink Faucet/Control Waste Disposal Wet Bar Sink Bar Sink Faucet/Control Washer Hook-up Laundry Tub Laundry Faucet/Control Water Heater Sump Pump Water Softener Other Contractor shall provide all labor and materials, and perform all work necessary for the
completion of the residence, structure, or improvements as described in the drawings and
specifications signed by both Owner and Contractor (“Project”) Such drawings and
- 3 - specifications are hereby made a part of this Contract. Drawings and specifications shall
contain a scale drawing showing the shape, size, and dimensions of the construction and
equipment together with a description of the work to be done, materials to be used, and the
equipment to be used or installed.2. WORK SITE: The Project shall be constructed on the property of Owner located at and more
particularly described as (hereafter
"the Work Site"). Owner hereby authorizes Contractor to commence and complete the usual and
customary excavation and grading on the Work Site as may be required in the judgment of the
Contractor to complete the Project. Unless called for in the drawings or specifications, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before
.
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be included as part of
the Project price.5. SOIL CONDITIONS: Contractor shall have no responsibility for the condition of the soils at the
Work Site. Any excavation, filling or other work required by the Owner other than the usual and
customary excavation and grading shall be agreed to in a Change Order for an amount in addition
to the Contract Price. Contractor shall not be responsible for any damages suffered by Owner as a
result of the soil conditions at the Work Site.6.INSURANCE: Contractor shall maintain general liability, workers compensation and builder's
risk insurance.7. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
out property lines to the Contractor. If the Owner or Contractor has any doubt about the location
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that
affect the Work Site.8. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the drawings and specifications, from time to time during the construction of
the Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the
estimated cost.9. CONTRACT PRICE:
- 4 - {COST PLUS}Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of$ for performing the services set forth in the scope of the work. Contractor
shall be paid as follows:
.OR{FIXED FEE}Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.10.LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10)
days from the due date shall be deemed a material breach of this Contract. If payment is not made
when due, Contractor may suspend work on the job until such time as all payments due have been
made without breach of the Contract pending payment or resolution of any dispute. Owner agrees
to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the
rate of 1% per month.11. RIGHT TO CURE : Contractor shall have the right to cure a defect before Owner may file any
action in court against Contractor. See the “Notice of Potential Claims Must be Provided within
One Year” attached hereto and made a part of this Contract.12.DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contractor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If the
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
either party, Contractor shall be excused from further performance under this Contract and Owner
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.13. ASSIGNMENT: Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.14.INTERPRETATION:(a)Interpretation of Documents. The Contract, drawings, and specifications are intended to
supplement one another. In the event of a conflict, the specifications shall control the drawings,
- 5 - and the Contract shall control both. If work is displayed on the drawings but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the drawings,
Contractor shall be required to perform the work as though it were called for and displayed in both
documents.(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exists
between the parties. This Contract may only be modified only by a written agreement signed by
both parties.(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
laws of the State of Alaska.15. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing party in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.16.PERFORMANCE:(a)Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
this Contract provided Contractor shall remain fully responsible for the proper completion of the
Project. (b) All work shall be completed in a workman-like manner and in compliance with all
building codes and applicable laws. To the extent required by law, all work shall be performed by
individuals duly licensed and authorized by law to perform said work.(c)Contractor agrees to remove all debris and leave the premises in broom clean condition.17.WARRANTY: Contractor agrees to repair or replace any defective or malfunctioning faucets,
valves, fixtures, equipment or fittings for a period of year(s). Contractor agrees to eliminate
excessive pipe hammering and repair or replace any soil, waste, venting or water piping found to
be leaking (except condensation) or improper flow of supply or effluent due to an obstruction
caused by settling or foreign matter in the piping at the time of installation or infiltrating
thereafter, for a period of year(s). Owner and Contractor agree to inspect all equipment,
fixtures, and piping within days after installation; and Contractor agrees to repair or replace
any chips, cracked, defective or otherwise malfunctioning items be found by such inspection. All
said defects arising after year(s) and defects in material are not warranted by Contractor.
Contractor hereby assigns to Owner all warranties on materials as provided by the manufacturer of
such materials.AGREED:CONTRACTOR:Signature OWNER:Signature
- 6 - Print Name & Title Date License Number Name and Address of License HolderPrint Name Date
- 7 - NOTICE OF POTENTIAL CLAIMS MUST BE PROVIDED WITHIN ONE YEAR ALASKA LAW AT AS 09.45.881-09.45.899 CONTAINS IMPORTANT REQUIREMENTS
THAT YOU MUST FOLLOW BEFORE YOU MAY FILE A COURT ACTION FOR DEFECTIVE
DESIGN, CONSTRUCTION, OR REMODELING AGAINST THE DESIGNER, BUILDER OR REMODELER OF YOUR HOME. WITHIN ONE YEAR OF THE DISCOVERY OF A DESIGN, CONSTRUCTION, OR REMODELING DEFECT, BEFORE YOU FILE A COURT ACTION, YOU
MUST DELIVER TO THE DESIGNER, BUILDER OR REMODELER A WRITTEN NOTICE OF
ANY DESIGN, CONSTRUCTION, OR REMODELING CONDITIONS YOU ALLEGE ARE DEFECTIVE IN ORDER TO PROVIDE YOUR DESIGNER, BUILDER, OR REMODELER WITH
THE OPPORTUNITY TO MAKE AN OFFER TO REPAIR OR PAY FOR THE DEFECTS.
YOU ARE NOT OBLIGATED TO ACCEPT ANY OFFER MADE BY THE DESIGNER,
BUILDER OR REMODER. THERE ARE STRICT DEADLINES AND PROCEDURES UNDER
STATE LAW, AND FAILURE TO FOLLOW THEM MAY AFFECT YOUR RIGHT TO FILE A
COURT ACTION. ALASKA LAW AT AS 09.45.895 CONTAINS LIMITATIONS TO THE AMOUNT
OF DAMAGES THAT MAY BE RECOVERED IN A COURT ACTION FOR DEFECTIVE DESIGN,
CONSTRUCTION OR REMODELING.
Useful advice on setting up your ‘A Residential Plumber Contract Agreement Why And How To ’ online
Are you fed up with the complications of managing paperwork? Look no further than airSlate SignNow, the premier eSignature platform for individuals and businesses. Bid farewell to the monotonous routine of printing and scanning documents. With airSlate SignNow, you can effortlessly complete and sign documents online. Take advantage of the extensive features embedded in this user-friendly and affordable platform and transform your method of paperwork management. Whether you need to sign forms or gather eSignatures, airSlate SignNow takes care of everything seamlessly, with just a few clicks.
Follow this detailed guide:
- Log into your account or register for a complimentary trial with our service.
- Select +Create to upload a file from your device, cloud storage, or our template library.
- Open your ‘A Residential Plumber Contract Agreement Why And How To ’ in the editor.
- Click Me (Fill Out Now) to complete the form on your end.
- Add and assign fillable fields for others (if needed).
- Continue with the Send Invite settings to request eSignatures from others.
- Download, print your version, or turn it into a reusable template.
Don’t be concerned if you need to collaborate with your coworkers on your A Residential Plumber Contract Agreement Why And How To or send it for notarization—our platform has everything you require to accomplish such tasks. Sign up with airSlate SignNow today and take your document management to a new height!