Establishing secure connection… Loading editor… Preparing document…
Navigation

Fill and Sign the Attendance Sheet Invoice Americorps Child Care Form

Fill and Sign the Attendance Sheet Invoice Americorps Child Care Form

How it works

Open the document and fill out all its fields.
Apply your legally-binding eSignature.
Save and invite other recipients to sign it.

Rate template

4.8
45 votes
ADEM UST CLOSURE SITE ASSESSMENT FORM ADEM UST CLOSURE SITE ASSESSMENT REPORT (Use a Separate form for a group of tanks in each tank pit) FACILITY I.D. NO.: INCIDENT NO. (If applicable). FACILITY COUNTY: DATE OF THIS REPORT: UST __ __ - __ __ - __ __ FACILITY NAME: LOCATION: UST OWNER: ADDRESS: CONTACT NAME: CONTACT PHONE #: ADDRESS: NAME OF CONTRACTOR USED TO CLOSE (REMOVE) TANK: NAME OF CONSULTANT CONDUCTING ASSESSMENT: NAME OF LABORATORY USED: PRIOR TO BEGINNING CLOSURE, THE CONTRACTOR SHOULD BECOME FAMILIAR WITH ALL CLOSURE PROCEDURES IN AMERICAN PETROLEUM INSTITUTE (API) BULLETIN 1604, “REMOVAL AND DISPOSAL OF USED UNDERGROUND PETROLEUM STORAGE TANKS” AND API BULLETIN 2015 “CLEANING PETROLEUM STORAGE TANKS”. THESE API BULLETINS ARE AVAILABLE FROM THE AMERICAN PETROLEUM INSTITUTE. NUMBER OF TANKS CLOSED: NUMBER OF TANKS REMAINING AT SITE: CLOSURE DATE: UNIQUE TANK #: TANK SIZE: TANK CAPACITY: TANK AGE: DATE TANK LAST USED: SUBSTANCE STORED: TYPE OF PRODUCT PIPING: (Pressurized/Suction) FARM TANK: HEATING OIL TANK: ADEM FORM 474 01/08 m2 Page 1 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM 1. COMPLETE THE FOLLOWING SECTION FOR ALL CLOSURES: a. Provide the results of a 500 ft. survey for domestic water supply wells in the following table and place their locations on the attached site map: Name of Owner of Domestic Water Supply Well Distance from UST Site Depth of Well Status: Active or Inactive? b. Provide the results of a 1,000 ft. survey for public water supply wells in the following table and place their locations on the attached site map: Name of Owner of Public Water Supply Well Distance from UST Site Depth of Well Status: Active or Inactive? c. Is the UST site located in a delineated wellhead protection or source water area? YES NO d. Are there any public water supply surface water intakes within 500 ft. of the UST site? YES NO If yes, locate the intake on the attached site map. NOTE: If an active domestic water supply well or an active public water supply well is located within 500 ft. or 1,000 ft. respectively of the UST site, or if the answer to 1c. or 1d. is Yes, the Department may require groundwater sampling to occur at the UST site. If the groundwater sampling is not performed by the owner/operator during the closure site assessment, the Department may require that groundwater sampling occur as part of a Preliminary Investigation. Groundwater sampling remains a requirement of the closure site assessment when shallow groundwater is present or when performing an in-place closure site assessment. e. Indicate the current on-site land use and the most likely future land use: Current On-Site Land Use Residential Commercial Other Describe: ADEM FORM 474 01/08 m2 Most Likely Future On-Site Land Use Residential Commercial Other Describe: Page 2 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM f. Describe the current off-site land use within 500 ft of the UST site. State whether the area, in general, is residential, commercial, mixed residential/commercial or other: North: Northeast: Northwest: South: Southeast: Southwest: West: East: g. For sites where there is any evidence of a release, provide the names and addresses of the property on which the tank system is/was located and the adjacent property owners. The property owner names and addresses should be indicated on a site map attached to this form. Name and Address of Onsite Property Owner: Name Address City State Zip Name and addresses of Adjacent Property Owners: Name Address City State Zip COMPLETE THE FOLLOWING SECTIONS AS APPROPRIATE BASED ON THE TYPE OF CLOSURE CONDUCTED: 2. TANK CLOSURE BY REMOVAL: a. Attach a topographic map showing the location of the facility and a general site map showing the area surrounding the UST site. b. Attach plan and sectional views of the excavation and include the following: 1. 2. 3. 4. All appropriate excavation dimensions. All soil sample locations and depths using an appropriate method of identification. Location of areas of visible contamination. Former location of tank(s), including depth, with tank Identification Number. ADEM FORM 474 01/08 m2 Page 3 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM YES c. If no, provide the depth from the ground surface to the groundwater table. Indicate method used to determine water table depth: 1. Excavation extended 5 feet below base of pit: 2. Boring or monitoring well: 3. Topographic features (Method must be approved by ADEM prior to use): d. NO Is the groundwater more than 5 feet below the bottom of the excavation? Feet: YES NO YES NO YES NO YES NO YES NO YES NO Was there a notable odor found in the excavation? If yes, (1) The odor strength was (mild) (strong) (other) describe: (2) The odor indicates what type of product: (gasoline)(diesel) (waste oil) (kerosene) (other) describe: e. Was there water in the excavation? If yes, how was it handled? 1. One time discharge to sanitary sewer with local approval? 2. Hauled to facility capable of treating constituents of petroleum products in water? 3. Hauled to local POTW with local approval? 4. Treated on-site with NPDES approved discharge? 5. Other? Explain: f. Was free product found in the excavation? If yes, 1. How was free product handled? Describe: 2. What was the measured thickness of free product? g. Were visible holes noted in the tank(s)? If yes, Indicate which tanks(s) by the Unique Tank Number: Also, describe the location(s) and provide general description as to the size and number of holes for above noted tanks, (Example: 3 square feet of pinholes or 3 inch diameter hole): h. Describe the soil type and thickness of all soil layers encountered in the excavation: ADEM FORM 474 01/08 m2 Page 4 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM YES NO i. Was the excavation backfilled? If yes, provide the date of backfilling: DO NOT BACKFILL WITH MATERIAL THAT HAS OR POTENTIALLY HAS A TPH OF GREATER THAN 100 PPM! 3. TANK CLOSURE WITHOUT REMOVAL (CLOSED IN-PLACE): a. Attach a topographic map showing the location of the facility and a general site map showing the area surrounding the UST site. b. Attach plan and sectional views of the site and include the following: 1. 2. 3. 4. c. Location of the tank(s) including depth, Location of tank(s) with respect to other tanks, if applicable, Soil boring locations and depths at which soil samples were taken, Boring logs. Groundwater sample(s) must be collected as part of an in-place closure assessment. Attach groundwater sampling data, as required based on depth to groundwater. Refer to Closure Site Assessment Guidance for further details regarding requirements for groundwater sampling. YES NO d. Is the groundwater more than 5 feet below the bottom of the tank? Provide the depth from the ground surface to the groundwater table. Feet: Refer to Closure Site Assessment Guidance (page 11) for further details regarding requirements for determining groundwater elevation. YES NO YES NO e. Was there a notable odor found in the bore holes? If yes, (1) The odor strength was (mild) (strong) (other) describe: (2) The odor indicates what type of product: (gasoline) (diesel) (waste oil) (kerosene) (other) describe: f. Was free product found in the bore holes? If yes, 1. How was free product handled? Describe: 2. What was the measured thickness of free product? ADEM FORM 474 01/08 m2 Page 5 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM g. Describe the soil type and thickness of all soil layers encountered in the bore holes and provide boring logs: h. Specify the inert solid material used to fill the tank(s): i. Provide the date the tank(s) were filled: YES NO j. Were the bore holes properly sealed with bentonite/soil? If yes, provide the date: 4. PRODUCT PIPING CLOSURE BY REMOVAL: a. Attach a topographic map showing the location of the facility and a general site map showing the area surrounding the UST site. b. If the piping was longer than 10 feet, attach plan and sectional views of the piping trench and include the following: 1. 2. 3. c. All appropriate excavation dimensions and length of piping, All soil sample locations and depths using an appropriate method of identification. Location of areas of visible contamination. YES NO YES NO Was the piping purged of product prior to closure? If yes, was the product properly disposed of? d. Is the groundwater more than 5 feet below the bottom of the piping trench? If no, provide the depth from the ground surface to the groundwater table. Indicate method used to determine water table depth: 1. Excavation extended 5 feet below base of trench: 2. Boring or monitoring well: 3. Topographic features ( Method must be approved by ADEM prior to use): Feet: YES NO YES NO e. Was there a notable odor found in the piping trench? If yes, (1) The odor strength was (mild) (strong) (other) describe: (2) The odor indicates what type of product: (gasoline) (diesel) (waste oil) (kerosene) (other) describe: ADEM FORM 474 01/08 m2 Page 6 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM f. If yes, how was it handled? 1. One time discharge to sanitary sewer with local approval? 2. Hauled to facility capable of treating constituents of petroleum products in water? 3. Hauled to local POTW with local approval? 4. Treated on-site with NPDES approved discharge? 5. Other? Explain: g. YES NO YES NO YES NO YES NO Was there water in the piping trench? Was free product found in the piping trench? If yes, 1. How was free product handled? Describe: 2. h. What was the measured thickness of free product? Were visible holes noted in the piping? If yes, indicate the location(s) and provide a general description as to the size and number of holes: i. Describe the soil type and thickness of all soil layers encountered in the piping trench: j. Was the piping trench backfilled? YES NO If yes, provide the date of backfilling: DO NOT BACKFILL WITH MATERIAL THAT HAS OR POTENTIALLY HAS A TPH OF GREATER THAN 100 PPM! 5. PRODUCT PIPING CLOSURE WITHOUT REMOVAL (CLOSED IN-PLACE)*: *Includes piping removed from a chase pipe. a. Attach a topographic map showing the location of the facility and a general site map showing the area surrounding the UST site. b. Attach plan and sectional views of the site and include the following: 1. 2. 3. 4. Location of the piping including depth, Location of piping with respect to tank(s), if applicable. Soil boring locations and depth at which soil samples were taken, Boring logs. ADEM FORM 474 01/08 m2 Page 7 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM c. Groundwater sample(s) must be collected as part of an in-place closure assessment. Attach groundwater sampling data, as required based on depth to groundwater. Refer to Closure Site Assessment Guidance for further details regarding requirements for groundwater sampling. d. Was the piping purged of product prior to closure? If yes, was product properly disposed of? e. Was the piping capped? YES NO YES NO YES NO f. Is the groundwater more than 5 feet below the bottom of the excavation? Provide the depth from the ground surface to the groundwater table. Feet: Refer to Closure Site Assessment Guidance (page 11) for further details regarding requirements for determining groundwater elevation. g. YES NO YES NO Was there a notable odor found in the bore holes? If yes, (1) The odor strength was (mild) (strong) (other) describe: (2) The odor indicates what type of product: (gasoline) (diesel) (waste oil) (kerosene) (other) describe: h. Was free product found in the bore holes? If yes, 1. How was free product handled? Describe: 2. What was the measured thickness of free product? i. Describe the soil type and thickness of all soil layers encountered in the bore holes and provide boring logs: YES j. NO Were the bore holes properly sealed with bentonite/soil? If yes, provide the date: ADEM FORM 474 01/08 m2 Page 8 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM 6. GROUNDWATER SAMPLING (If required by the closure guidelines): a. Indicate the following on the plan and section views required by Section 2.b., 3.b, 4.b, or 5.b. above: 1. The location and depth of the borings or monitoring wells. (Monitoring wells in lieu of borings are not required, but may be desirable in certain situations.) 2. The most probable direction of groundwater flow. State basis for determining direction: YES b. NO Was a monitoring well used? If yes, attach a schematic drawing of the well(s) and all boring logs. c. SUMMARY OF GROUNDWATER SAMPLING RESULTS: Date of Sampling: Boring or MW #: mg/l mg/l mg/l mg/l mg/l mg/l mg/l Benzene Ethylbenzene Toluene Xylenes MTBE Anthracene Benzo(a)anthracene Benzo(a)pyrene Benzo(b)fluoranthene Benzo(k)fluoranthene Benzo(g,h,i)perylene Chrysene Fluoranthene Fluorene Naphthalene Phenanthrene Pyrene Lead Note: Attach additional tables as needed based on number of groundwater samples or variations in sampling dates. d. Attach the original chain of custody record (copies are not acceptable) and the original laboratory data sheet (copies are not acceptable) for each sample. ADEM FORM 474 01/08 m2 Page 9 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM 7. SUMMARY OF SOIL ANALYTICAL DATA a. Provide the analytical data obtained from the site in the following tables: TANK PIT SAMPLES: Date of Sampling: Sample #: mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg TPH OPTION: TPH Lead COC OPTION: Benzene Ethylbenzene Toluene Xylenes MTBE Anthracene Benzo(a)anthracene Benzo(a)pyrene Benzo(b)fluoranthene Benzo(k)fluoranthene Benzo(g,h,i)perylene Chrysene Fluoranthene Fluorene Naphthalene Phenanthrene Pyrene Lead Note: Attach additional tables as needed based on number of soil samples or variations in sampling dates. ADEM FORM 474 01/08 m2 Page 10 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM PIPING & DISPENSER SAMPLES: Date of Sampling: Sample #: mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg mg/kg TPH OPTION: TPH Lead COC OPTION: Benzene Ethylbenzene Toluene Xylenes MTBE Anthracene Benzo(a)anthracene Benzo(a)pyrene Benzo(b)fluoranthene Benzo(k)fluoranthene Benzo(g,h,i)perylene Chrysene Fluoranthene Fluorene Naphthalene Phenanthrene Pyrene Lead Note: Attach additional tables as needed based on number of soil samples or variations in sampling dates. b. Attach the original chain of custody record (copies are not acceptable) and the original laboratory data sheet (copies are not acceptable) for each sample. ADEM FORM 474 01/08 m2 Page 11 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM 8. EXCAVATED SOIL ALL EXCAVATED SOIL REQUIRES ANALYSIS PRIOR TO DISPOSAL UNLESS OTHERWISE DIRECTED BY THE DEPARTMENT. TANK CLOSURE SAMPLES FROM THE EXCAVATION MAY NOT BE REPRESENTATIVE OF THE LEVEL OF CONTAMINATION IN THE EXCAVATED SOIL. For safety and other considerations, it is recommended that open pits and piping trenches should be backfilled as soon as possible with clean backfill. Soils which have TPH levels greater than 100 ppm or soils for which the level of contamination has not been determined shall not be returned to the excavation pit(s) or piping trenches. a. If tank was closed by removal, provide an estimate of the volume of soil removed: b. cubic yds Provide a summary of analytical results for the excavated soil: Date of Sampling: Sample # TPH Results mg/kg Lead Results (If applicable) mg/kg Note: Attach additional tables as needed based on number of soil sample or variations in sampling dates. c. Attach the original chain of custody record (copies are not acceptable) and the original laboratory data sheet (copies are not acceptable) for each sample. d. Attach the “Total Potential VOC Emissions Calculations” for soil removed. ADEM FORM 474 01/08 m2 Page 12 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM e. Indicate current method and location of soil management and/or treatment prior to final disposal: f. Check the method of soil disposal used or to be used: Return to the excavation pit only when TPH is less than or equal to 100 ppm and depth of groundwater is greater than 5 feet from the base of the pit. Spread in a thin layer (6” or less) on site only when TPH is less than or equal to 100 ppm Disposal in a landfill ( See attached “Guidelines for the Disposal of Non-Hazardous Petroleum Contaminated Wastes”). Incineration. Thermal volatilization. Recycling facility Other g. If soil was disposed of prior to the submittal of this form, indicate the final destination below and attach copies of invoices, receipts, and “certificate of burn” (if soil was incinerated): 9. TANK CLEANING YES NO a. The tank(s) were cleaned in accordance with American Petroleum Institute (API) Bulletin 2015 “Cleaning Petroleum Storage Tanks”? If no, describe how tank(s) were cleaned: b. Provide an estimate of the volume of sludge removed from the tank: c. Indicate the final destination of the sludge and attach invoices or receipts: ADEM FORM 474 01/08 m2 Gallons Page 13 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM 10. ATTACHMENTS Attach the following to the closure form in the following order as applicable to the type of closure site assessment performed. Check each box to indicate that a particular map or information is attached to the closure site assessment form. The section of the closure site assessment form that indicates the required attachment is shown. Topographic Map showing location of site (Section 2.a., 3.a., 4.a., & 5.a.) Area map showing general location of the site. Include land use on-site and within 500’ of site. Indicate property owner names and addresses if a release has occurred. (Section 1) Include locations of domestic and public water supply wells, and surface water intakes (Section 1) Plan and sectional views of the site including the following: (Section 2.b., 3.b., 4.b., & 5.b.) Location of the closed tanks and piping including depth. Include any remaining tanks or piping at site. Include tank identification numbers. Excavation dimensions of the tank system Locations of soil samples taken for piping and tank which includes the analytical results. Location of areas of visible contamination Location of any stockpiled excavated soil Location of soil borings for an in-place closure The location and depth of the one up-gradient and 3 down-gradient borings or monitoring wells (Section 6.a.) Map illustrating the most probable direction of groundwater flow (Section 6.a.) Schematic diagrams of the monitoring wells installed (Section 6.b.) Boring logs of soil borings (Section 3.b., 5.b. &6.b.) Site Classification Checklist Invoices and/or receipts for sludge disposal (Section 9.c.) Invoices, manifests and certificates of burn or disposal for soil disposal (Section 8.f.) Attach the original chain of custody record (copies are not acceptable) for each sample which includes at least the following: (Sections 6.d., 7.b., & 8.c.) Sample identification number, Date and time sample was taken, Name and title of person collecting sample (see certification requirement on page 15 of this form), Type of sample (soil or water), Type of sample container, Method of preservation, Date and time sample was relinquished, Person relinquishing sample, Date and time sample was received by lab, Person receiving sample at lab. Attach the original laboratory data sheet (copies are not acceptable) which includes at least the following: (Sections 6.d., 7.b., & 8.c.) A sample identification number which can be cross referenced with the soil sample locations indicated on the plan and sectional views required by Section 2.b., 3.b., 4.b., or 5.b. above The sample analytical results with appropriate units, The method used to analyze each sample, The date and time the sample was analyzed, The person analyzing the sample. ADEM FORM 474 01/08 m2 Page 14 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM 11. SIGNATURES This form should be completed, signed, and returned, along with any other pertinent information, to the following address: The Alabama Department of Environmental Management Groundwater Branch Post Office Box 301463 Montgomery, AL 36130-1463 (334) 270-5655 INCOMPLETE FORMS WILL BE RETURNED FOR CORRECTION. Name of person taking soil and/or groundwater samples: Company: Telephone Number: I certify under penalty of law that I have obtained representative soil and/or groundwater samples using accepted sampling procedures. Signature: Print Name: Date: Either an Alabama Licensed Professional Geologist or an Alabama Registered Professional Engineer must sign this form: I certify under penalty of law that I have performed this closure site assessment in accordance with accepted soil and groundwater investigation practices; I am either an Alabama Licensed Professional Geologist or an Alabama Registered Professional Engineer; I am experienced in soil and groundwater investigations; and the information I have submitted, to the best of my knowledge and belief, is true, accurate, and complete. Signature of Alabama Licensed Professional Geologist: Print Name: Date: Alabama P.G. License Number: Signature of Alabama Registered Professional Engineer: Print Name: Date: Alabama P.E. Registration Number: I certify under penalty of law that I have personally examined and am familiar with the information submitted in this and all attached documents and that based on those individuals immediately responsible for obtaining the information, I believe that the submitted information is true, accurate, and complete. Signature of Tank Owner: Date: Print Name: ADEM FORM 474 01/08 m2 Page 15 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM FOR ADEM USE ONLY: Reviewed By: Date: COMMENTS: ADEM FORM 474 01/08 m2 Page 16 of 17 ADEM UST CLOSURE SITE ASSESSMENT FORM FOR ADEM OFFICE USE ONLY TO: FROM: Air Division UST Compliance Section MEMORANDUM January 28, 1991 ADEM UST CLOSURE TOTAL POTENTIAL VOC EMISSIONS CALCULATIONS FACILITY I.D. NO.: INCIDENT NO. (If applicable). FACILITY COUNTY: DATE OF THIS REPORT: UST __ __ - __ __ - __ __ UST OWNER: ADDRESS: FACILITY NAME: LOCATION: CONTACT NAME: CONTACT PHONE #: ADDRESS: Name of Consultant who performed calculations: Consultant’s Phone Number: a Sample 1 Sample 2 Sample 3 Sample 4 Sample 5 Sample 6 Sample 7 Sample 8 Sample 9 Sample 10 Sample 11 Sample 12 Sample 13 Sample 14 Sample 15 ppm x ppm x ppm x ppm x ppm x ppm x ppm x ppm x ppm x ppm x ppm x ppm x ppm x ppm x ppm x ppm x b cyds x .002 = cyds x .002 = cyds x .002 = cyds x .002 = cyds x .002 = cyds x .002 = cyds x .002 = cyds x .002 = cyds x .002 = cyds x .002 = cyds x .002 = cyds x .002 = cyds x .002 = cyds x .002 = cyds x .002 = cyds x .002 = TOTAL POTENTIAL EMISSIONS = c lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions lbs. VOC emissions * NOTE - If more samples are taken than indicated on this form, please attach additional pages as necessary. This form must be completed and submitted with the ADEM UST Closure Site Assessment Report Form. ADEM FORM #492 8/02 ADEM FORM 474 01/08 m2 Page 17 of 17

Useful advice on finalizing your ‘Attendance Sheet Invoice Americorps Child Care’ online

Are you exhausted by the inconvenience of managing paperwork? Look no further than airSlate SignNow, the premier eSignature platform for individuals and organizations. Bid farewell to the monotonous task of printing and scanning documents. With airSlate SignNow, you can effortlessly complete and sign paperwork over the internet. Utilize the powerful features embedded within this intuitive and cost-effective platform and transform your method of document handling. Whether you need to sign forms or gather signatures, airSlate SignNow makes it all simple, with just a few clicks.

Follow this detailed guide:

  1. Log into your account or initiate a free trial with our service.
  2. Click +Create to upload a file from your device, cloud storage, or our template library.
  3. Open your ‘Attendance Sheet Invoice Americorps Child Care’ in the editor.
  4. Click Me (Fill Out Now) to set up the form on your end.
  5. Add and designate fillable fields for others (if necessary).
  6. Proceed with the Send Invite options to request eSignatures from additional users.
  7. Save, print your version, or convert it into a multiple-use template.

Don’t fret if you need to collaborate with your colleagues on your Attendance Sheet Invoice Americorps Child Care or send it for notarization—our solution offers everything essential to accomplish such tasks. Sign up with airSlate SignNow today and elevate your document management to a new standard!

Here is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.

Need help? Contact Support
Attendance sheet invoice americorps child care vista
Attendance sheet invoice americorps child care 2021
Sign up and try Attendance sheet invoice americorps child care form
  • Close deals faster
  • Improve productivity
  • Delight customers
  • Increase revenue
  • Save time & money
  • Reduce payment cycles