- 1 -
PLUMBING CONTRACT
THIS PLUMBING CONTRACT (“Contract”), effective as of the date of the last party to sign
below, is between , having an address at
("Contractor") and having an
address at ("Owner").
For valuable consideration the parties hereby agree as follows:
1. SCOPE OF WORK:
Waste Disposal-Public: Private:
Manufacturer, Model Number:
Disposal Field:
Water Supply-Public: Private:
Pressure Reducing Valve-Make & Model:
Gas Supply-Public: Private:
Gas Supply Type/Description Joint Treatment Pipe Size
Main to House
House to Fixtures
Waste Disposal Type/Description Joint Treatment Pipe Size
House to Main or Plant
Under Basement Floor
Above Basement Floor to Toilets
Above Basement Floor to Sinks
Above Basement Floor to
Sump Pump
Venting
Flashing of Vents
Water Supply Type/Description Joint Treatment Pipe Size
Main to House
House to Water Heater
House to Bathrooms
House to Kitchen Sink
House to Refrigerator
House to Dishwasher
House to Ice Maker
- 2 -
Other
Bathroom-Fixtures Model/Description
Master Bath Guest Bath Bath #1 Bath #2
Water Closet
Toilet Seat
Shower
Tub
Tub Faucet & Control Lever
Shower Faucet & Control
Lavatory Faucet & Control
Lavatory
Bidet
Whirlpool/Jacuzzi
Location, Type & Number of:
Water Stops/Shutoffs:
Location, Soft Water:
Exterior Water Faucets:
Fixture Description-Brand Name, Model Number, etc. Size/Other
Kitchen Sink
Kit. Sink Faucet/Control
Waste Disposal
Wet Bar Sink
Bar Sink Faucet/Control
Washer Hook-up
Laundry Tub
Laundry Faucet/Control
Water Heater
Sump Pump
Water Softener
Other
Contractor shall provide all labor and materials, and perform all work necessary for the
completion of the residence, structure, or improvements as described in the drawings a nd
specifications signed by both Owner and Contractor (“Project”) Such drawings and
- 3 -
specifications are hereby made a part of this Contract. Drawings and specifications shall
contain a scale drawing showing the shape, size, and dimensions of the construction and
equipment together with a description of the work to be done, materials to be used, and the
equipment to be used or installed.
2. WORK SITE: The Project shall be constructed on the property of Owner located at
and more
particularly described as (hereafter
"the Work Site"). Owner hereby authorizes Contractor to commence and complete the usua l and
customary excavation and grading on the Work Site as may be required in the judgment of the
Contractor to complete the Project. Unless called for in the drawings or specificat ions, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before
.
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be include d as part of
the Project price.
5. SOIL CONDITIONS: Contractor shall have no responsibility for the condition of the soils at the
Work Site. Any excavation, filling or other work required by the Owner other than the usual and
customary excavation and grading shall be agreed to in a Change Order for an amount in addition
to the Contract Price. Contractor shall not be responsible for any damages suffered by Owner as a
result of the soil conditions at the Work Site.
6. INSURANCE: Contractor shall maintain general liability, workers compensation and builder's
risk insurance.
7. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
out property lines to the Contractor. If the Owner or Contractor has any doubt about the locat ion
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions tha t
affect the Work Site.
8. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the drawings and specifications, from time to time during the const ruction of
the Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contrac tor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not i t is in excess of the
estimated cost.
9. CONTRACT PRICE:
- 4 -
{COST PLUS}
Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of
$ for performing the services set forth in the scope of the work. Contractor
shall be paid as follows:
.
OR
{FIXED FEE}
Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.
Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.
10. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10)
days from the due date shall be deemed a material breach of this Contract. If paym ent is not made
when due, Contractor may suspend work on the job until such time as all payments due have bee n
made without breach of the Contract pending payment or resolution of any dispute. Owner agree s
to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the
rate of 1% per month.
11. DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contra ctor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If t he
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
either party, Contractor shall be excused from further performance under this Contract and Owner
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.
12. ASSIGNMENT : Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.
13. INTERPRETATION: (a) Interpretation of Documents. The Contract, drawings, and specifications are intended to
supplement one another. In the event of a conflict, the specifications shall control the drawings,
and the Contract shall control both. If work is displayed on the drawings but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the drawings,
Contractor shall be required to perform the work as though it were called for and displayed in both
documents.
- 5 -
(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exi sts
between the parties. This Contract may only be modified only by a written agreeme nt signed by
both parties.
(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
laws of the State of New Jersey.
14. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing part y in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.
15. PERFORMANCE: (a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
this Contract provided Contractor shall remain fully responsible for the proper completion of the
Project.
(b) All work shall be completed in a workman-like manner and in compliance with all
building codes and applicable laws. To the extent required by law, all work shall be pe rformed by
individuals duly licensed and authorized by law to perform said work.
(c) Contractor agrees to remove all debris and leave the premises in broom clean condition.
16. WARRANTY: Contractor agrees to repair or replace any defective or malfunctioning faucets,
valves, fixtures, equipment or fittings for a period of year(s). Contractor agrees to eliminate
excessive pipe hammering and repair or replace any soil, waste, venting or water piping found to
be leaking (except condensation) or improper flow of supply or effluent due to an obstruction
caused by settling or foreign matter in the piping at the time of installation or infiltrating
thereafter, for a period of year(s). Owner and Contractor agree to inspect all equipment,
fixtures, and piping within days after installation; and Contractor agrees to repair or replace
any chips, cracked, defective or otherwise malfunctioning items be found by such inspection. All
said defects arising after year(s) and defects in material are not warranted by Contractor.
Contractor hereby assigns to Owner all warranties on materials as provided by the manufac turer of
such materials.
A mortgage or security interest to be taken in connection with the financing or sale of the home
improvement applies and is described as follows: ______________________________.
A person other than the seller is to act as the general contractor or assume responsibility for
performance of the contract and is identified as:
Name: ______________________________
Address: ______________________________
- 6 -
NOTICE TO OWNER
Do not sign this contract in blank. You are entitled to a copy of the contract at the time you
sign. Keep it to protect your legal rights. Do not sign any completion certificate or agreement
stating that you are satisfied with the entire project before this project is complete. Home repair
contractors are prohibited by law from requesting or accepting a certificate of completion
signed by the owner prior to the actual completion of the work to be performed under the home
repair contract.
Workmen's compensation and public liability insurance are carried by the home repair
contractor and applicable to the work to be performed under the contract.
The home repair contractor is qualified as a self-insurer pursuant to Title 34;
The home repair contractor is precluded from purchasing workmen's compensation under
chapter 15 of Title 34 of the Revised Statutes,and does not carry workmen's compensation
insurance.
AGREED:
CONTRACTOR:
Signature
Print Name & Title
Date
License Number
Name and Address of License Holder
Print Name of Salesperson (if applicable)
Address of Salesperson (if applicable)
Phone Number
OWNER:
Signature
Print Name
Date
- 7 -
* Required for use in home solicitation sales only:
RECEIPT
______________________________
Contractor's Name ______________________________
Contractor’s Place of Business
Description of the goods and services sold: ______________________________
Amount of money paid by the owner or the cash value of any goods delivered to the home repair
contractor at the time the home repair contract was entered into: ______________________________
NOTICE TO OWNER: YOU MAY RESCIND THIS SALE PROVIDED THAT YOU NOTIFY THE
HOME REPAIR CONTRACTOR OF YOUR INTENT TO DO SO BY CERTIFIED MAIL, RETURN
RECEIPT REQUESTED, POSTMARKED NOT LATER THAN 5 P.M. OF THE THIRD BUSINESS
DAY FOLLOWING THE SALE. FAILURE TO EXERCISE THIS OPTION, HOWEVER, WILL NOT
INTERFERE WITH ANY OTHER REMEDIES AGAINST THE HOME REPAIR CONTRACTOR
YOU MAY POSSESS. IF YOU WISH YOU MAY USE THIS PAGE AS NOTIFICATION BY
WRITING "I HEREBY RESCIND' AND ADDING YOUR NAME AND ADDRESS. A DUPLICATE
OF THIS RECEIPT IS PROVIDED BY THE HOME REPAIR CONTRACTOR FOR YOUR
RECORDS.
Helpful advice for finalizing your ‘City Of Laguna Niguel Plumbing Contract Services Request For ’ online
Exhausted by the burden of handling paperwork? Search no further than airSlate SignNow, the premier eSignature platform for individuals and organizations. Bid farewell to the lengthy process of printing and scanning documents. With airSlate SignNow, you can effortlessly complete and sign documents online. Take advantage of the robust features incorporated into this user-friendly and cost-effective platform to transform your document management strategy. Whether you need to approve forms or gather electronic signatures, airSlate SignNow manages it all seamlessly, needing just a few clicks.
Follow this detailed guide:
- Access your account or initiate a free trial with our platform.
- Click +Create to import a file from your device, cloud, or our template collection.
- Open your ‘City Of Laguna Niguel Plumbing Contract Services Request For ’ in the editor.
- Click Me (Fill Out Now) to prepare the document on your side.
- Add and assign fillable fields for others (if required).
- Proceed with the Send Invite setup to request eSignatures from others.
- Save, print your version, or convert it into a reusable template.
No need to worry if you require collaboration with your colleagues on your City Of Laguna Niguel Plumbing Contract Services Request For or need to send it for notarization—our platform provides everything you need to accomplish such tasks. Sign up with airSlate SignNow today and enhance your document management to new levels!