NOTICES
FLORIDA’S CONSTRUCTION LIEN LAW
[FLORIDA STATUTES § 713.015]
ACCORDING TO FLORIDA’S CONSTRUCTION LIEN LAW (SECTIONS 713.001-713.37,
FLORIDA STATUTES), THOSE WHO WORK ON YOUR PROPERTY OR PROVIDE
MATERIALS AND SERVICES AND ARE NOT PAID IN FULL HAVE A RIGHT TO ENFORCE
THEIR CLAIM FOR PAYMENT AGAINST YOUR PROPERTY. THIS CLAIM IS KNOWN AS
A CONSTRUCTION LIEN. IF YOUR CONTRACTOR OR A SUBCONTRACTOR FAILS TO
PAY SUBCONTRACTORS, SUB-SUBCONTRACTORS, OR MATERIAL SUPPLIERS, THOSE
PEOPLE WHO ARE OWED MONEY MAY LOOK TO YOUR PROPERTY FOR PAYMENT,
EVEN IF YOU HAVE ALREADY PAID YOUR CONTRACTOR IN FULL. IF YOU FAIL TO
PAY YOUR CONTRACTOR, YOUR CONTRACTOR MAY ALSO HAVE A LIEN ON YOUR
PROPERTY. THIS MEANS IF A LIEN IS FILED YOUR PROPERTY COULD BE SOLD
AGAINST YOUR WILL TO PAY FOR LABOR, MATERIALS, OR OTHER SERVICES THAT
YOUR CONTRACTOR OR A SUBCONTRACTOR MAY HAVE FAILED TO PAY. TO
PROTECT YOURSELF, YOU SHOULD STIPULATE IN THIS CONTRACT THAT BEFORE
ANY PAYMENT IS MADE, YOUR CONTRACTOR IS REQUIRED TO PROVIDE YOU WITH
A WRITTEN RELEASE OF LIEN FROM ANY PERSON OR COMPANY THAT HAS
PROVIDED TO YOU A “NOTICE TO OWNER.” FLORIDA’S CONSTRUCTION LIEN LAW IS
COMPLEX, AND IT IS RECOMMENDED THAT YOU CONSULT AN ATTORNEY.
FLORIDA HOMEOWNERS' CONSTRUCTION
RECOVERY FUND
[FLORIDA STATUTES § 489.1425]
PAYMENT MAY BE AVAILABLE FROM THE FLORIDA HOMEOWNERS' CONSTRUCTION
RECOVERY FUND IF YOU LOSE MONEY ON A PROJECT PERFORMED UNDER
CONTRACT, WHERE THE LOSS RESULTS FROM SPECIFIED VIOLATIONS OF FLORIDA
LAW BY A LICENSED CONTRACTOR. FOR INFORMATION ABOUT THE RECOVERY
FUND AND FILING A CLAIM, CONTACT THE FLORIDA CONSTRUCTION INDUSTRY
LICENSING BOARD AT THE FOLLOWING TELEPHONE NUMBER AND ADDRESS:
FLORIDA CONSTRUCTION INDUSTRY LICENSING BOARD
1940 NORTH MONROE STREET
TALLAHASSEE, FLORIDA 32399-2215
TELEPHONE (850) 921-6593
FAX (850) 921-5450
*(optional notice for home solicitation contracts)
BUYER'S RIGHT TO CANCEL
This is a home solicitation sale, and if you do not want the goods or services, you may cancel this
agreement by providing written notice to the seller in person, by telegram, or by mail. This notice
must indicate that you do not want the goods or services and must be delivered or postmarked
- 1 -
before midnight of the third business day after you sign this agreement. If you cancel this
agreement, the seller may not keep all or part of any cash down payment.
DRAINAGE CONTRACT
THIS DRAINAGE CONTRACT (“Contract”), effective as of the date of the last party to sign
below, is between , having an address at
("Contractor") and , having an address at
("Owner").
For valuable consideration the parties hereby agree as follows:
1. SCOPE OF WORK: Drainage services may include plumbing repair work (for drains, sinks,
toilets, water cylinders, boilers, heaters and pipe lining), and fabrication and installation of
cesspools, septic tanks, storm drains and other sewage disposal and drain structures. Drainage
work may also include the evaluation of soil erosion, erosion control and proper water run-off of a
particular area or worksite. Contractor shall provide all necessary drainage labor and materials ,
and perform all drainage services described above and/or as set forth in the plans and
specifications signed by both Owner and Contractor (“Project”). Such plans and specifications are
hereby made a part of this Contract and may contain pictures, diagrams or measurements of the
work area together with a description of the work to be done, materials to be used, and the
equipment to be used or installed.
2. WORK SITE: The Project shall be constructed on the property of Owner located at
and more
particularly described as ________
(hereafter "the Work Site"). Owner hereby authorizes Contractor to commence and complete the
usual and customary excavation and grading on the Work Site as may be required in the judgment
of the Contractor to complete the Project. Unless called for in the plans or specifications, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before .
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be included as part of
the Project price.
5. SOIL CONDITIONS: Contractor shall have no responsibility for the condition of the soils at the
Work Site. Any excavation, filling or other work required by the Owner other than the usual and
customary excavation and grading shall be agreed to in a Change Order for an amount in addition
to the Contract Price. Contractor shall not be responsible for any damages suffered by Owner as a
result of the soil conditions at the Work Site.
6. INSURANCE: Contractor shall maintain general liability and workers compensation insurance.
7. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
- 2 -
out property lines to the Contractor. If the Owner or Contractor has any doubt about the location
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that
affect the Work Site.
8. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the plans and specifications, from time to time during the construction of the
Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the
estimated cost.
9. CONTRACT PRICE:
{COST PLUS}
Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of
$ for performing the services set forth in the scope of the work. Contractor
shall be paid as follows:
.
OR
{FIXED FEE}
Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.
Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.
10. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10)
days from the due date shall be deemed a material breach of this Contract. If payment is not made
when due, Contractor may suspend work on the job until such time as all payments due have been
made without breach of the Contract pending payment or resolution of any dispute. Owner agrees
to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the
rate of 1% per month.
11 . DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contractor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If the
- 3 -
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
either party, Contractor shall be excused from further performance under this Contract and Owner
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.
12. ASSIGNMENT : Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.
13. INTERPRETATION:
(a) Interpretation of Documents. The Contract, plans, and specifications are intended to
supplement one another. In the event of a conflict, the specifications shall control the plans, and
the Contract shall control both. If work is displayed on the plans but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the plans,
Contractor shall be required to perform the work as though it were called for and displayed in both
documents.
(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exists
between the parties. This Contract may only be modified by a written agreement signed by both
parties.
(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
laws of the State of Florida.
14. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing party in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.
15. PERFORMANCE:
(a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
to this Contract provided Contractor shall remain fully responsible for the proper completion of
the Project.
(b) All work shall be completed in a workman-like manner and in compliance with all building
codes and applicable laws. To the extent required by law, all work shall be performed by
individuals duly licensed and authorized by law to perform said work.
(c) Contractor agrees to remove all debris and leave the premises in broom clean condition.
16 . WARRANTY: Contractor's warranty shall be limited to defects in workmanship within the scope
of work performed by Contractor and which arise and become known within one (1) year from the
date hereof. All said defects arising after one (1) year and defects in material are not warranted by
Contractor. Contractor hereby assigns to Owner all warranties on materials as provided by the
manufacturer of such materials.
- 4 -
AGREED:
CONTRACTOR:
Signature
Print Name & Title
Date
License Number
Name and Address of License Holder OWNER:
Signature
Print Name
Date
- 5 -
Valuable tips on preparing your ‘Drainage Contract For Contractor Florida’ online
Are you fed up with the burden of handling paperwork? Look no further than airSlate SignNow, the premier e-signature platform for individuals and organizations. Bid farewell to the lengthy process of printing and scanning documents. With airSlate SignNow, you can effortlessly complete and authorize paperwork online. Utilize the robust features incorporated into this user-friendly and economical platform and transform your approach to document management. Whether you need to authorize forms or collect electronic signatures, airSlate SignNow manages it all with ease, requiring just a few clicks.
Follow this detailed guide:
- Log into your account or sign up for a complimentary trial with our service.
- Click +Create to upload a file from your device, cloud storage, or our template library.
- Open your ‘Drainage Contract For Contractor Florida’ in the editor.
- Click Me (Fill Out Now) to prepare the form on your end.
- Add and designate fillable fields for others (if needed).
- Continue with the Send Invite settings to request eSignatures from others.
- Save, print your copy, or convert it into a reusable template.
No need to worry if you have to collaborate with your teammates on your Drainage Contract For Contractor Florida or send it for notarization—our platform has everything you need to accomplish such tasks. Sign up with airSlate SignNow today and take your document management to the next level!