FENCING CONTRACT
THIS FENCING CONTRACT (“Contract”), effective as of the date of the last party to sign
below, is between , having an address at ("Contractor") and ,
having an address at
("Owner").
For valuable consideration the parties hereby agree as follows:
1. SCOPE OF WORK: Fencing is the use of chain link, wrought iron, vinyl or wood materials to
construct, erect, alter, or repair all types of fences, corrals, runs, railings, cribs, game court
enclosures, guard rails, barriers and gates. Fencing services include locating buried utility lines,
cables and pipes in the digging area and determining local zoning requirements, as well as
neighborhood or subdivision restrictions for height, type, style and position. Contractor shall
provide all necessary fencing labor and materials, and perform all fencing services described
above and/or a s set forth in the plans and specifications signed by both Owner and Contractor
(“Project”). Such plans and specifications are hereby made a part of this Contract and may contain
pictures, diagrams or measurements of the work area together with a description of the work to be
done, materials to be used, and the equipment to be used or installed.
2. WORK SITE: The Project shall be constructed on the property of Owner located at
and more
particularly described as ________
(hereafter "the Work Site"). Owner hereby authorizes Contractor to commence and complete the
usual and customary excavation and grading on the Work Site as may be required in the judgment
of the Contractor to complete the Project. Unless called for in the plans or specifications, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before .
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be included as part of
the Project price.
5. SOIL CONDITIONS: Contractor shall have no responsibility for the condition of the soils at the
Work Site. Any excavation, filling or other work required by the Owner other than the usual and
customary excavation and grading shall be agreed to in a Change Order for an amount in addition
to the Contract Price. Contractor shall not be responsible for any damages suffered by Owner as a
result of the soil conditions at the Work Site.
6. INSURANCE: Contractor shall maintain general liability and workers compensation, as well as
builder's risk insurance, if applicable.
7. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
out property lines to the Contractor. If the Owner or Contractor has any doubt about the location
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
- 1 -
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that
affect the Work Site.
8. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the plans and specifications, from time to time during the construction of the
Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the
estimated cost.
9. CONTRACT PRICE:
{COST PLUS}
Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of
$ for performing the services set forth in the scope of the work. Contractor
shall be paid as follows:
.
OR
{FIXED FEE}
Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.
Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.
10. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10)
days from the due date shall be deemed a material breach of this Contract. If payment is not made
when due, Contractor may suspend work on the job until such time as all payments due have been
made without breach of the Contract pending payment or resolution of any dispute. Owner agrees
to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the
rate of 1% per month.
11 . DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contractor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If the
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
- 2 -
either party, Contractor shall be excused from further performance under this Contract and Owner
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.
12. ASSIGNMENT : Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.
13. INTERPRETATION:
(a) Interpretation of Documents. The Contract, plans, and specifications are intended to
supplement one another. In the event of a conflict, the specifications shall control the plans, and
the Contract shall control both. If work is displayed on the plans but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the plans,
Contractor shall be required to perform the work as though it were called for and displayed in both
documents.
(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exists
between the parties. This Contract may only be modified by a written agreement signed by both
parties.
(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
laws of the State of Connecticut.
14. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing party in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.
15. PERFORMANCE:
(a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
to this Contract provided Contractor shall remain fully responsible for the proper completion of
the Project.
(b) All work shall be completed in a workman-like manner and in compliance with all building
codes and applicable laws. To the extent required by law, all work shall be performed by
individuals duly licensed and authorized by law to perform said work.
(c) Contractor agrees to remove all debris and leave the premises in broom clean condition.
16 . WARRANTY: Contractor's warranty shall be limited to defects in workmanship within the scope
of work performed by Contractor and which arise and become known within one (1) year from the
date hereof. All said defects arising after one (1) year and defects in material are not warranted by
Contractor. Contractor hereby assigns to Owner all warranties on materials as provided by the
manufacturer of such materials.
- 3 -
AGREED:
OWNER:
YOU, THE OWNER, MAY CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO
MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION.
SEE THE ATTACHED NOTICE OF CANCELLATION FORM FOR AN EXPLANATION OF
THIS RIGHT.
Signature
Print Name
Date
CONTRACTOR:
Print Name & Title
Date
License Number
Name and Address of License Holder
Related Corporation, LLC, Partnership, Sole Proprietorship, or other Legal Entity
- 4 -
NOTICE OF CANCELLATION
(Date of Transaction)
YOU MAY CANCEL THIS TRANSACTION, WITHOUT ANY PENALTY OR
OBLIGATION, WITHIN THREE BUSINESS DAYS FROM THE ABOVE DATE.
IF YOU CANCEL, ANY PROPERTY TRADED IN, ANY PAYMENTS MADE BY YOU
UNDER THE CONTRACT OR SALE, AND ANY NEGOTIABLE INSTRUMENT EXECUTED
BY YOU WILL BE RETURNED WITHIN TEN BUSINESS DAYS FOLLOWING RECEIPT BY
THE SELLER OF YOUR CANCELLATION NOTICE, AND ANY SECURITY INTEREST
ARISING OUT OF THE TRANSACTION WILL BE CANCELLED.
IF YOU CANCEL, YOU MUST MAKE AVAILABLE TO THE SELLER AT YOUR
RESIDENCE, IN SUBSTANTIALLY AS GOOD CONDITION AS WHEN RECEIVED, ANY
GOODS DELIVERED TO YOU UNDER THIS CONTRACT OR SALE; OR YOU MAY, IF YOU
WISH, COMPLY WITH THE INSTRUCTIONS OF THE SELLER REGARDING THE RETURN
SHIPMENT OF THE GOODS AT THE SELLER'S EXPENSE AND RISK.
IF YOU DO MAKE THE GOODS AVAILABLE TO THE SELLER AND THE SELLER
DOES NOT PICK THEM UP WITHIN TWENTY DAYS OF THE DATE OF CANCELLATION,
YOU MAY RETAIN OR DISPOSE OF THE GOODS WITHOUT ANY FURTHER
OBLIGATION. IF YOU FAIL TO MAKE THE GOODS AVAILABLE TO THE SELLER, OR IF
YOU AGREE TO RETURN THE GOODS TO THE SELLER AND FAIL TO DO SO, THEN YOU
REMAIN LIABLE FOR PERFORMANCE OF ALL OBLIGATIONS UNDER THE CONTRACT.
TO CANCEL THIS TRANSACTION, MAIL OR DELIVER A SIGNED AND DATED COPY
OF THIS CANCELLATION NOTICE OR ANY OTHER WRITTEN NOTICE, OR SEND A
TELEGRAM TO (Name of Seller) AT
(Address of Seller's Place of Business) NOT LATER THAN MIDNIGHT OF (Date)
I HEREBY CANCEL THIS TRANSACTION.
(Date)
________________________________________________________
(Buyer's Signature)
- 5 -
Valuable tips for finishing your ‘Fencing Contract For Contractor Connecticut’ online
Are you weary of the inconvenience of handling paperwork? Look no further than airSlate SignNow, the leading electronic signature service for individuals and small to medium-sized businesses. Bid farewell to the monotonous process of printing and scanning documents. With airSlate SignNow, you can seamlessly finalize and authenticate paperwork online. Make use of the extensive features incorporated into this user-friendly and budget-friendly platform and transform your method of paperwork management. Whether you need to approve forms or collect electronic signatures, airSlate SignNow takes care of it all with ease, needing only a few clicks.
Follow this detailed guide:
- Access your account or initiate a free trial with our service.
- Hit +Create to upload a file from your device, cloud storage, or our template library.
- Open your ‘Fencing Contract For Contractor Connecticut’ in the editor.
- Click Me (Fill Out Now) to set up the document on your end.
- Add and designate fillable fields for others (if necessary).
- Proceed with the Send Invite settings to request eSignatures from others.
- Save, print your copy, or convert it into a reusable template.
No need to worry if you need to work with your team on your Fencing Contract For Contractor Connecticut or send it for notarization—our solution provides you with all the tools you need to achieve such tasks. Register with airSlate SignNow today and elevate your document management to new levels!
Fencing contract for contractor connecticut template
CT contractor license requirements
CT contractor license application
CT CONTRACTOR license application pdf
General contractor license CT
Home Improvement contractor license Connecticut
CT contractor license Lookup
Home Improvement contractor CT