FOUNDATION CONTRACT
THIS FOUNDATION CONTRACT (“Contract”), effective as of the date of the last party to
sign below, is between , having an address at
("Contractor") and , having an
address at ("Owner").
For valuable consideration the parties hereby agree as follows:
1. SCOPE OF WORK: Contractor is responsible for all scheduling delivery of all materials.
Excess concrete material ordered will be disposed of according to Owner’s instructions. Contractor shall
schedule inspections of the work as necessary.
FOOTING-Concrete Mix or PSI: Slump:
Width: Depth: Reinforcing: Number:
Spacing: Dowels: Spacing: Keyway:
FROST FOOTING-Concrete Mix or PSI: Slump:
Width: Depth: Reinforcing: Number:
Spacing: Dowels: Spacing: Keyway:
FOUNDATION WALL-Material: Block-Size:
Concrete Mix or PSI: Slump: *
Width: * Beam Pocket Size: Reinforcing:
Number: Spacing:
PIERS-Concrete Mix or PSI: Slump:
Diameter Depth: Spacing:
Reinforcing: Number: Spacing:
PILINGS-Material:
Size: Spacing: Depth:
FIREPLACE FTG.-Concrete Mix or PSI: Slump:
Width: Length: Depth:
Reinforcing: Number: Spacing:
FOUNDATION WINDOWS: Size:
FOUNDATION DOORS: Size: *
CRAWL SPACE-Ground Cover: * Vents:
Access: Drain:
DRAIN TILE-Material/Size: Material over Tile:
FOUNDATION WATERPROOFING: Vapor Barrier:
Foundation Insulation: R-Value:
Found. Bolt/Size: Spacing: Termite Protection:
- 1 -
GIRDERS-Material: Size: Span:
COLUMNS-Material: Size: Spacing:
2. WORK SITE: The Project shall be constructed on the property of Owner located at
and more
particularly described as (hereafter
"the Work Site"). Owner hereby authorizes Contractor to commence and complete the usual and
customary excavation and grading on the Work Site as may be required in the judgment of the
Contractor to complete the Project. Unless called for in the drawings or specifications, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before .
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be included as part of
the Project price.
5. SOIL CONDITIONS: Contractor shall have no responsibility for the condition of the soils at the
Work Site. Any excavation, filling or other work required by the Owner other than the usual and
customary excavation and grading shall be agreed to in a Change Order for an amount in addition
to the Contract Price. Contractor shall not be responsible for any damages suffered by Owner as a
result of the soil conditions at the Work Site.
6. INSURANCE: Contractor shall maintain general liability, workers compensation and builder's
risk insurance.
7. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
out property lines to the Contractor. If the Owner or Contractor has any doubt about the location
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that
affect the Work Site.
8. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the drawings and specifications, from time to time during the construction of
the Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the
estimated cost.
9. CONTRACT PRICE:
{COST PLUS}
- 2 -
Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of
$ for performing the services set forth in the scope of the work. Contractor
shall be paid as follows:
.
OR
{FIXED FEE}
Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.
Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.
10. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10)
days from the due date shall be deemed a material breach of this Contract. If payment is not made
when due, Contractor may suspend work on the job until such time as all payments due have been
made without breach of the Contract pending payment or resolution of any dispute. Owner agrees
to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the
rate of 1% per month.
11. DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contractor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If the
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
either party, Contractor shall be excused from further performance under this Contract and Owner
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.
12. ASSIGNMENT : Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.
13. INTERPRETATION:
(a) Interpretation of Documents. The Contract, drawings, and specifications are intended to
supplement one another. In the event of a conflict, the specifications shall control the drawings,
and the Contract shall control both. If work is displayed on the drawings but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the drawings,
Contractor shall be required to perform the work as though it were called for and displayed in both
documents.
- 3 -
(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exists
between the parties. This Contract may only be modified only by a written agreement signed by
both parties.
(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
laws of the State of Connecticut.
14. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing party in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.
15. PERFORMANCE:
(a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
this Contract provided Contractor shall remain fully responsible for the proper completion of the
Project.
(b) All work shall be completed in a workman-like manner and in compliance with all building
codes and applicable laws. To the extent required by law, all work shall be performed by
individuals duly licensed and authorized by law to perform said work.
(c) Contractor agrees to remove all debris and leave the premises in broom clean condition.
16. WARRANTY: Contractor agrees to repair any cracks in the foundation wall in excess of 1/8
inch and any leaks occurring through foundation wall ties for a period of years. Contractor shall
not be responsible, if Contractor informed Owner in writing, prior to installation of the foundation,
that possible unstable soil conditions may exist and Owner waived the right to take steps to ensure a
soil level that would provide a stable load bearing capacity of the soil for the dwelling. Contractor
shall not be responsible for structural damage to the dwelling due to the Owner’s failure to maintain
suitable soil moisture content at the footing level. Contractor shall not be responsible for cracks or
failure of the foundation caused by Owner’s failure to divert water away from the foundation.
Contractor agrees that, should the fireplace footing settle 1 inch vertically or should the fireplace walls
separate or otherwise move away from the dwelling in excess of 1 1/2 inch at the intersection of the
roof line and the fireplace wall, within a year period, then, Contractor agrees to furnish and pay
for all costs to stabilize the fireplace footing for an additional period of years from the date
repairs was effected, at no additional cost to Owner; provided however, Contractor shall not be
responsible, if Contractor informed Owner in writing, prior to installation of the fireplace footing, that
possible unstable soil conditions may exist and Owner waived the right instruct changes be made to
ensure additional fireplace footing support. Contractor shall not be responsible after this period.
Contractor shall not be responsible for Owner’s negligence. Contractor agrees to assist in securing
fulfillment of warranties provided by the manufacturer on the equipment supplied by Contractor. In
the event, a crack develops within the above warranty period, then Contractor agrees to repair or
replace within days of notice, weather permitting. Contractor hereby assigns to Owner all
warranties on materials as provided by the manufacturer of such materials.
- 4 -
AGREED:
OWNER:
YOU, THE OWNER, MAY CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO
MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION.
SEE THE ATTACHED NOTICE OF CANCELLATION FORM FOR AN EXPLANATION OF
THIS RIGHT.
Signature
Print Name
Date
CONTRACTOR:
Print Name & Title
Date
License Number
Name and Address of License Holder
Related Corporation, LLC, Partnership, Sole Proprietorship, or other Legal Entity
- 5 -
NOTICE OF CANCELLATION
(Date of Transaction)
YOU MAY CANCEL THIS TRANSACTION, WITHOUT ANY PENALTY OR
OBLIGATION, WITHIN THREE BUSINESS DAYS FROM THE ABOVE DATE.
IF YOU CANCEL, ANY PROPERTY TRADED IN, ANY PAYMENTS MADE BY YOU
UNDER THE CONTRACT OR SALE, AND ANY NEGOTIABLE INSTRUMENT EXECUTED
BY YOU WILL BE RETURNED WITHIN TEN BUSINESS DAYS FOLLOWING RECEIPT BY
THE SELLER OF YOUR CANCELLATION NOTICE, AND ANY SECURITY INTEREST
ARISING OUT OF THE TRANSACTION WILL BE CANCELLED.
IF YOU CANCEL, YOU MUST MAKE AVAILABLE TO THE SELLER AT YOUR
RESIDENCE, IN SUBSTANTIALLY AS GOOD CONDITION AS WHEN RECEIVED, ANY
GOODS DELIVERED TO YOU UNDER THIS CONTRACT OR SALE; OR YOU MAY, IF YOU
WISH, COMPLY WITH THE INSTRUCTIONS OF THE SELLER REGARDING THE RETURN
SHIPMENT OF THE GOODS AT THE SELLER'S EXPENSE AND RISK.
IF YOU DO MAKE THE GOODS AVAILABLE TO THE SELLER AND THE SELLER
DOES NOT PICK THEM UP WITHIN TWENTY DAYS OF THE DATE OF CANCELLATION,
YOU MAY RETAIN OR DISPOSE OF THE GOODS WITHOUT ANY FURTHER
OBLIGATION. IF YOU FAIL TO MAKE THE GOODS AVAILABLE TO THE SELLER, OR IF
YOU AGREE TO RETURN THE GOODS TO THE SELLER AND FAIL TO DO SO, THEN YOU
REMAIN LIABLE FOR PERFORMANCE OF ALL OBLIGATIONS UNDER THE CONTRACT.
TO CANCEL THIS TRANSACTION, MAIL OR DELIVER A SIGNED AND DATED COPY
OF THIS CANCELLATION NOTICE OR ANY OTHER WRITTEN NOTICE, OR SEND A
TELEGRAM TO (Name of Seller) AT
(Address of Seller's Place of Business) NOT LATER THAN MIDNIGHT OF (Date)
I HEREBY CANCEL THIS TRANSACTION.
(Date)
________________________________________________________
(Buyer's Signature)
- 6 -
Useful tips for finishing your ‘Foundation Contract For Contractor Connecticut’ online
Are you fed up with the inconvenience of handling paperwork? Look no further than airSlate SignNow, the leading electronic signature platform for individuals and organizations. Bid farewell to the monotonous routine of printing and scanning documents. With airSlate SignNow, you can conveniently finalize and sign documents online. Leverage the powerful features included in this user-friendly and cost-effective platform and transform your method of document management. Whether you need to approve forms or collect signatures, airSlate SignNow takes care of it all effortlessly, with just a few clicks.
Follow this comprehensive guide:
- Log into your account or begin a free trial with our service.
- Click +Create to upload a file from your device, cloud, or our form repository.
- Access your ‘Foundation Contract For Contractor Connecticut’ in the editor.
- Click Me (Fill Out Now) to complete the document on your side.
- Add and designate fillable fields for other participants (if necessary).
- Proceed with the Send Invite settings to solicit eSignatures from others.
- Save, print your version, or turn it into a reusable template.
No need to worry if you have to collaborate with others on your Foundation Contract For Contractor Connecticut or send it for notarization—our platform offers everything you need to accomplish such tasks. Sign up with airSlate SignNow today and take your document management to a new height!
Foundation contract for contractor connecticut template
Foundation contract for contractor connecticut sample
Foundation contract for contractor connecticut pdf
Foundation for Fair Contracting of Connecticut
CT contractor license requirements
Connecticut general contractor license
Connecticut Contractors Board
Home improvement contract Act