FRAMING CONTRACT
THIS FRAMING CONTRACT (“Contract”), effective as of the date of the last party to sign
below, is between , having an address at
("Contractor") and , having an
address at ("Owner").
For valuable consideration the parties hereby agree as follows:
1. SCOPE OF WORK: Framing shall be to the plans including all details. Floor joist layout shall
be as best to avoid plumbing for tubs and toilets. Framing includes the installation of sill plates;
rim joists; floor joists; sub flooring; plates; exterior and interior walls; ceiling joists; headers; rafters; roof
sheathing; sub fascia and fascia; bridging; joist hangers; rough framing materials for stair jacks, treads and
risers; collar ties; other attic bracing materials; roof overhang and soffit; rake boards; steel and/or wood
girders; columns and posts; sill sealer under the sill plates; sheathing and siding the exterior walls; siding
corners; interior and exterior decorative beams and posts; exterior moldings; drip edge/Z - bar (including
trim materials over z - bar); windows; exterior doors (excepting the garage door); frame and case garage
door as needed; back-out garage door as needed; ventilation materials; termite shield; furring blocks on
concrete walls; bracing; stiffbacks; backing blocks; nailing blocks; shimming windows and doors;
caulking and gluing continuous as needed; set all finish nails; insulation behind tubs located on exterior
walls; drywall behind tubs as required; box in vent areas; box in heat runs as required; framing for future
recessed fixtures; kitchen and bathroom cabinet drops; fire stopping as required; deck posts; deck girders;
deck floor joists and flooring; deck handrail and seating; deck stair jacks, treads and risers; and .
Contractor shall return all excess material and damaged materials. Contractor shall call for inspections of
the work as required.
Framing Materials:
Sill Insulation: Termite Shield:
Bridging Material: Joist Hangers:
SubFloor Material: Size: Glue:
Underlayment Material: Size: Glue:
Wall Sheathing Material: Size:
Corner Brace Material:
Wall Siding Material: Size:
Roof Sheathing Material: Size:
Flitch Plate Material/Size: Bolts:
Nails-Framing Members: Siding:
Windows: Exterior Trim: Exterior Doors:
Use Material Type Size Spacing Greatest Span
Each Size
Sill Plate N/A N/A
Box Sill/Rim Joist N/A N/A
1st Floor-Floor Joists
- 1 -
2nd Floor-Floor Joists
Ceiling Joists
Rafters/Roof Trusses
Exterior Studs
Interior Studs
Top & Bottom Plates N/A N/A
Headers, Windows & Doors N/A
Headers, Garage Door N/A
Beams N/A
Roof Bracing/Collar Ties
Exterior Trim Material Type Thickness Size
Fascia Board
Soffit
Siding Corners
Garage Door Trim
Window Trim
Door Trim
Rake Board
Exterior Beams
Exterior Posts
Flashing Material: Windows:
Doors:
Soffit Vents:
Gable Vents:
WINDOWS:
Manufacturer/Style:
Material: Insulated Glass:
Screens: Storms:
Grilles: Shutters:
STAIRS:
LOCATION JACKS TREADS RISERS
Material Size Material Size Material Size
Basement
1st Floor
- 2 -
2nd Floor
Disappearing Stairs - Make and Model Number:
EXTERIOR DOORS: (Including Storm Doors)
Door Brand/Model/Material Size Thickness Hardware
Front
Rear
Sliding/Patio
Garage
2. WORK SITE: The Project shall be constructed on the property of Owner located at
and more
particularly described as (hereafter
"the Work Site"). Owner hereby authorizes Contractor to commence and complete the usual and
customary excavation and grading on the Work Site as may be required in the judgment of the
Contractor to complete the Project. Unless called for in the drawings or specifications, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before .
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be included as part of
the Project price.
5. INSURANCE: Contractor shall maintain general liability, workers compensation and builder's
risk insurance.
6. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
out property lines to the Contractor. If the Owner or Contractor has any doubt about the location
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that
affect the Work Site.
7. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the drawings and specifications, from time to time during the construction of
the Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the
estimated cost.
- 3 -
8. CONTRACT PRICE:
{COST PLUS}
Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of
$ for performing the services set forth in the scope of the work. Contractor
shall be paid as follows:
.
OR
{FIXED FEE}
Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.
Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.
9. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10)
days from the due date shall be deemed a material breach of this Contract. If payment is not made
when due, Contractor may suspend work on the job until such time as all payments due have been
made without breach of the Contract pending payment or resolution of any dispute. Owner agrees
to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the
rate of 1% per month.
10. DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contractor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If the
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
either party, Contractor shall be excused from further performance under this Contract and Owner
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.
11. ASSIGNMENT : Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.
12. INTERPRETATION:
(a) Interpretation of Documents. The Contract, drawings, and specifications are intended to
supplement one another. In the event of a conflict, the specifications shall control the drawings,
and the Contract shall control both. If work is displayed on the drawings but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the drawings,
- 4 -
Contractor shall be required to perform the work as though it were called for and displayed in both
documents.
(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exists
between the parties. This Contract may only be modified only by a written agreement signed by
both parties.
(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
laws of the State of Connecticut.
13. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing party in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.
14. PERFORMANCE:
(a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
this Contract provided Contractor shall remain fully responsible for the proper completion of the
Project.
(b) All work shall be completed in a workman-like manner and in compliance with all building
codes and applicable laws. To the extent required by law, all work shall be performed by
individuals duly licensed and authorized by law to perform said work.
(c) Contractor agrees to remove all debris and leave the premises in broom clean condition.
WARRANTY: Contractor's warranty shall be limited to due to improper framing labor techniques,
except for the following allowances: floor variance shall not exceed 1/4 inch in 32 inches, bowed or
out of plumb walls shall not exceed 1/4 inch in 32 inches, non-excessive floor squeaks or pops. All
said defects arising after one (1) year and defects in material are not warranted by Contractor.
Contractor hereby assigns to Owner all warranties on materials as provided by the manufacturer of
such materials.
AGREED:
OWNER:
YOU, THE OWNER, MAY CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO
MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION.
SEE THE ATTACHED NOTICE OF CANCELLATION FORM FOR AN EXPLANATION OF
THIS RIGHT.
Signature
Print Name
- 5 -
Date
CONTRACTOR:
Print Name & Title
Date
License Number
Name and Address of License Holder
Related Corporation, LLC, Partnership, Sole Proprietorship, or other Legal Entity
- 6 -
NOTICE OF CANCELLATION
(Date of Transaction)
YOU MAY CANCEL THIS TRANSACTION, WITHOUT ANY PENALTY OR
OBLIGATION, WITHIN THREE BUSINESS DAYS FROM THE ABOVE DATE.
IF YOU CANCEL, ANY PROPERTY TRADED IN, ANY PAYMENTS MADE BY YOU
UNDER THE CONTRACT OR SALE, AND ANY NEGOTIABLE INSTRUMENT EXECUTED
BY YOU WILL BE RETURNED WITHIN TEN BUSINESS DAYS FOLLOWING RECEIPT BY
THE SELLER OF YOUR CANCELLATION NOTICE, AND ANY SECURITY INTEREST
ARISING OUT OF THE TRANSACTION WILL BE CANCELLED.
IF YOU CANCEL, YOU MUST MAKE AVAILABLE TO THE SELLER AT YOUR
RESIDENCE, IN SUBSTANTIALLY AS GOOD CONDITION AS WHEN RECEIVED, ANY
GOODS DELIVERED TO YOU UNDER THIS CONTRACT OR SALE; OR YOU MAY, IF YOU
WISH, COMPLY WITH THE INSTRUCTIONS OF THE SELLER REGARDING THE RETURN
SHIPMENT OF THE GOODS AT THE SELLER'S EXPENSE AND RISK.
IF YOU DO MAKE THE GOODS AVAILABLE TO THE SELLER AND THE SELLER
DOES NOT PICK THEM UP WITHIN TWENTY DAYS OF THE DATE OF CANCELLATION,
YOU MAY RETAIN OR DISPOSE OF THE GOODS WITHOUT ANY FURTHER
OBLIGATION. IF YOU FAIL TO MAKE THE GOODS AVAILABLE TO THE SELLER, OR IF
YOU AGREE TO RETURN THE GOODS TO THE SELLER AND FAIL TO DO SO, THEN YOU
REMAIN LIABLE FOR PERFORMANCE OF ALL OBLIGATIONS UNDER THE CONTRACT.
TO CANCEL THIS TRANSACTION, MAIL OR DELIVER A SIGNED AND DATED COPY
OF THIS CANCELLATION NOTICE OR ANY OTHER WRITTEN NOTICE, OR SEND A
TELEGRAM TO (Name of Seller) AT
(Address of Seller's Place of Business) NOT LATER THAN MIDNIGHT OF (Date)
I HEREBY CANCEL THIS TRANSACTION.
(Date)
________________________________________________________
(Buyer's Signature)
- 7 -
Useful advice on preparing your ‘Framing Contract For Contractor Connecticut’ online
Are you exhausted by the burden of managing paperwork? Look no further than airSlate SignNow, the premier electronic signature platform for individuals and organizations. Say farewell to the monotonous task of printing and scanning documents. With airSlate SignNow, you can effortlessly complete and sign documents online. Take advantage of the comprehensive features included in this intuitive and cost-effective platform and transform your method of document management. Whether you need to authorize forms or gather eSignatures, airSlate SignNow manages it all effortlessly, needing just a few clicks.
Follow these step-by-step guidelines:
- Access your account or initiate a free trial with our service.
- Hit +Create to upload a file from your device, cloud storage, or our template library.
- Open your ‘Framing Contract For Contractor Connecticut’ in the editor.
- Select Me (Fill Out Now) to finalize the document on your end.
- Add and designate fillable fields for other participants (if needed).
- Continue with the Send Invite options to request eSignatures from others.
- Save, print your copy, or convert it into a reusable template.
No need to worry if you have to collaborate with your teammates on your Framing Contract For Contractor Connecticut or send it for notarization—our solution offers everything required to achieve such tasks. Register with airSlate SignNow today and boost your document management to new levels!
Framing contract for contractor connecticut template
Framing contract for contractor connecticut sample
Framing contract for contractor connecticut pdf
Free framing contract for contractor connecticut
CT contractor license application
CT CONTRACTOR license application pdf
General contractor license CT
CT contractor license requirements