Property Details
Property address, client name, inspector name and license, inspection date and start/end times, weather and occupancy status for context and record linkage.
A consistent checklist reduces oversight, improves comparability between properties, and creates a defensible written record for post-inspection decisions and negotiations.
Typical parties involved before and after an inspection are listed below.
Use clear signatory blocks and supporting photos so each recipient can verify findings and next steps.
An accredited inspector signs to attest to the observed condition at inspection time. The narrative should cite visible evidence, include photos, and list safety issues. The inspector’s signature and license number provide attribution and are central to any later dispute resolution.
The buyer or buyer’s agent acknowledges receipt and review of the checklist, using the document to trigger contract remedies within contingency deadlines. Their signed acknowledgement documents awareness of reported deficiencies and supports follow-up requests.
Property address, client name, inspector name and license, inspection date and start/end times, weather and occupancy status for context and record linkage.
Condition of roofing materials, gutters, chimneys, siding, grading and drainage issues, with photo fields for visible damage and estimated remaining life where applicable.
Evidence of settlement, cracks, moisture intrusion, or unusual movement. Note accessible crawlspaces, basements, visible joist or beam issues, and presence of standing water.
Supply and drain piping condition, water pressure, visible leaks, water heater age and capacity, and presence of backflow or cross-connection hazards.
Service size, panel condition, wiring observations, functional HVAC tests, thermostat operation, and any safety hazards such as double-tapped breakers or improper grounding.
Floors, walls, windows, doors, smoke/carbon monoxide detectors, handrails, and other life-safety items; include a risk priority or recommended timeline for repairs.
| Field | Configuration |
|---|---|
| Required Fields | Mark address, date, inspector name as mandatory to prevent incomplete submissions |
| Conditional Fields | Show repair detail fields only when a defect or hazard status is selected |
| Authentication | Use email verification or SMS code for signer attribution; stronger options for high-risk transactions |
| Storage Destination | Auto-save completed forms to cloud storage with versioning and audit trail |
Choose a platform that supports secure PDFs, image attachments, and signer attribution to maintain evidentiary value.
Ensure the chosen workflow preserves timestamps, IP addresses, and an audit trail so signed documents meet ESIGN and state law recordability requirements.
Typically within 7–10 days of buyer request
Standard delivery within 24–72 hours after inspection
Buyer typically has 3–7 days to submit repair requests
Conduct within 7–14 days after repairs complete
Keep copies for at least 3 years for tax and dispute purposes
Arrange access and confirm start time
Complete walkthrough and tests
Draft checklist with photos and narratives
Send signed copy and store evidence
| signNow | DocuSign | Adobe Sign | PandaDoc | HelloSign | |
|---|---|---|---|---|---|
| Starting Price | $8/user/mo | $15/user/mo | $14/user/mo | $19/user/mo | $15/user/mo |
| Free Trial | 7-day free trial | No | No | Yes, limited | Yes, limited |
| Bulk Send | Yes | Yes | Yes | Yes | No |
| Audit Trail | Yes | Yes | Yes | Yes | Yes |
| HIPAA Compliant | Yes | Yes | Yes | No | No |
A buyer orders an inspection before removing contingencies to identify safety and major defects.
A seller commissions a pre-listing inspection to surface issues and plan repairs before marketing.