CONSTRUCTION CONTRACT
THIS CONSTRUCTION CONTRACT (“Contract”), effective as of the date of the last party to
sign below, is between , having an address at
("Contractor") and , having an
address at ("Owner").
For valuable consideration the parties hereby agree as follows:
1. SCOPE OF WORK: Contractor shall provide all labor and materials, and perform all work
necessary for the completion of the residence, structure, or improvements as described in the
drawings and specifications signed by both Owner and Contractor (“Project”) and more
particularly described as
Such drawings and specifications are hereby made a part of this Contract. Drawings and
specifications shall contain a scale drawing showing the shape, size, and dimensions of the
construction and equipment together with a description of the work to be done, materials to be
used, and the equipment to be used or installed.
2. WORK SITE: The Project shall be constructed on the property of Owner located at
and more
particularly described as (hereafter
"the Work Site"). Owner hereby authorizes Contractor to commence and complete the usual and
customary excavation and grading on the Work Site as may be required in the judgment of the
Contractor to complete the Project. Unless called for in the drawings or specifications, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before .
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be included as part of
the Project price.
5. SOIL CONDITIONS: Contractor shall have no responsibility for the condition of the soils at the
Work Site. Any excavation, filling or other work required by the Owner other than the usual and
customary excavation and grading shall be agreed to in a Change Order for an amount in addition
to the Contract Price. Contractor shall not be responsible for any damages suffered by Owner as a
result of the soil conditions at the Work Site.
6. INSURANCE: Contractor shall maintain general liability, workers compensation and builder's
risk insurance.
7. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
out property lines to the Contractor. If the Owner or Contractor has any doubt about the location
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
- 1 -
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that
affect the Work Site.
8. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the drawings and specifications, from time to time during the construction of
the Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the
estimated cost.
9. CONTRACT PRICE:
{COST PLUS}
Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of
$ for performing the services set forth in the scope of the work. Contractor
shall be paid as follows:
.
OR
{FIXED FEE}
Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.
Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.
10. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of thirty (30)
days from the due date shall be deemed a material breach of this Contract. If payment is not made
when due, Contractor may suspend work on the job until such time as all payments due have been
made without breach of the Contract pending payment or resolution of any dispute. Owner agrees
to pay a late charge of 1% of all payments that are more than thirty ( 3 0) days late plus interest at
the rate of 1% per month.
11. DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contractor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If the
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
either party, Contractor shall be excused from further performance under this Contract and Owner
- 2 -
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.
12. ASSIGNMENT : Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.
13. INTERPRETATION:
(a) Interpretation of Documents. The Contract, drawings, and specifications are intended to
supplement one another. In the event of a conflict, the specifications shall control the drawings,
and the Contract shall control both. If work is displayed on the drawings but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the drawings,
Contractor shall be required to perform the work as though it were called for and displayed in both
documents.
(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exists
between the parties. This Contract may only be modified only by a written agreement signed by
both parties.
(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
laws of the State of Mississippi.
14. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing party in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.
15. PERFORMANCE:
(a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
this Contract provided Contractor shall remain fully responsible for the proper completion of the
Project.
(b) All work shall be completed in a workman-like manner and in compliance with all building
codes and applicable laws. To the extent required by law, all work shall be performed by
individuals duly licensed and authorized by law to perform said work.
(c) Contractor agrees to remove all debris and leave the premises in broom clean condition.
16. WARRANTY: Contractor warrants the following to the owner:
(a) One (1) year following the warranty commencement date, the home will be free from any
defect due to noncompliance with the building standards.
(b) Six (6) years following the completion date, the home will be free from major structural
defects due to noncompliance with the building standards.
(c) Unless the parties otherwise agree in writing, the Contractor’s warranty shall exclude the
following items: (1) Defects in outbuildings including detached garages and detached
carports, except outbuildings which contain the plumbing, electrical, heating, cooling or
- 3 -
ventilation systems serving the home; swimming pools and other recreational facilities;
driveways; walkways; patios; boundary walls; retaining walls; bulkheads; fences;
landscaping, including sodding, seeding, shrubs, trees, and planting; off-site improvements
including streets, roads, drainage and utilities or any other improvements not a part of the
home itself. (2) Damage to real property which is not part of the home covered by the
warranty and which is not included in the purchase price of the home. (3) Any damage to
the extent it is caused or made worse by any of the following: (i) Negligence, improper
maintenance or improper operation by anyone other than the builder or any employee,
agent or subcontractor of the builder. (ii) Failure by anyone other than the builder or any
employee, agent or subcontractor of the builder to comply with the warranty requirements
of manufacturers of appliances, equipment or fixtures. (iii) Any change, alteration or
addition made to the home by anyone after the initial occupancy by the owner, except any
change, alteration or addition performed by the builder, or any employee, agent, or
subcontractor of the builder. (iv) Dampness, condensation or other damage due to the
failure of the owner to maintain adequate ventilation or drainage.
(d) Any loss or damage which the owner has not taken timely action to minimize.
(e) Any defect in, or any defect caused by, materials or work supplied by anyone other than
the builder, or any employee, agent or subcontractor of the builder.
(f) Normal wear and tear or normal deterioration.
(g) Loss or damage which does not constitute a defect in the construction of the home by the
builder, or any employee, agent or subcontractor of the builder.
(h) Loss or damage resulting from war, accident, riot and civil commotion, water escape,
falling objects, aircraft, vehicles, acts of God, lightning, windstorm, hail, flood, mud slide,
earthquake, volcanic eruption, wind-driven water and changes in the level of the
underground water table which are not reasonably foreseeable.
(i) Insect damage and rotting of any kind.
(j) Mold or mold damage, except in cases where the Contractor’s negligence was a proximate
or contributing cause of the mold or mold damage.
(k) Any condition which does not result in actual physical damage to the home.
(l) Failure of the builder to complete construction of the home.
(m) Any defect not reported in writing by registered or certified mail to the builder or insurance
company, as appropriate, prior to the expiration of the period of coverage of that defect
plus thirty (30) days.
(n) Consequential damages.
(o) Any loss or damage to a home caused by soil conditions or soil movement if the home is
constructed on land owned by the initial purchaser and the builder obtains a written waiver
- 4 -
from the initial purchaser for any loss or damage caused by soil conditions or soil
movement.
(p) Any defect in an electrical, plumbing, heating, air conditioning or similar fixture not
manufactured by the builder for which the manufacturer provides a warranty regardless of
duration.
Before undertaking any repair himself, except repair to minimize loss or damage as provided
in Section 83-58-5(2)(d), or instituting any action under Section 83-58-17, the owner shall give
the Contractor written notice within ninety (90) days after knowledge of the defect by
registered or certified mail, advising him of the defects and giving the Contractor a reasonable
opportunity to repair the defect.
AGREED:
CONTRACTOR:
Signature
Print Name & Title
Date
License Number
Name and Address of License Holder OWNER:
Signature
Print Name
Date
- 5 -
* Optional notice required only for home solicitation sales:
BUYER'S RIGHT TO CANCEL
Date of buyer's signature on agreement: ______________________
If this agreement was solicited at your residence and you do not want the goods or services, you
may cancel this agreement by mailing a notice to the seller by certified or registered mail. The
notice must say that you do not want the goods or services and must be mailed before midnight on
the third business day after you sign this agreement. The notice must be mailed to:
______________________ (insert name and mailing address of seller). If you cancel, the seller may
keep all or part of your cash down payment, but in no event may the seller retain an amount in
excess of five percent (5%) of the cash price or the amount of the cash down payment whichever is
the lesser.
- 6 -
Valuable suggestions for preparing your ‘New Home Construction Contract Mississippi Mississippi’ online
Are you fed up with the complications of handling paperwork? Look no further than airSlate SignNow, the premier electronic signature solution for individuals and businesses. Bid farewell to the monotonous routine of printing and scanning documents. With airSlate SignNow, you can effortlessly finalize and sign paperwork online. Leverage the extensive features integrated into this user-friendly and budget-friendly platform and transform your method of paperwork management. Whether you need to authorize forms or gather eSignatures, airSlate SignNow manages it all seamlessly, with just a few clicks.
Follow these comprehensive steps:
- Sign in to your account or initiate a free trial with our service.
- Click +Create to upload a file from your device, cloud storage, or our form library.
- Access your ‘New Home Construction Contract Mississippi Mississippi’ in the editor.
- Click Me (Fill Out Now) to finish the document on your end.
- Add and allocate fillable fields for others (if necessary).
- Proceed with the Send Invite options to solicit eSignatures from others.
- Download, print your copy, or convert it into a reusable template.
Don’t fret if you need to collaborate with your teammates on your New Home Construction Contract Mississippi Mississippi or send it for notarization—our solution provides everything you require to achieve such tasks. Register with airSlate SignNow today and take your document management to a new height!