PLUMBING CONTRACT
THIS PLUMBING CONTRACT (“Contract”), effective as of the date of the last party to sign
below, is between , having an address at
("Contractor") and
, having an address at
("Owner").
For valuable consideration the parties hereby agree as follows:
1. SCOPE OF WORK:
Waste Disposal-Public: Private:
Manufacturer, Model Number:
Disposal Field:
Water Supply-Public: Private:
Pressure Reducing Valve-Make & Model:
Gas Supply-Public: Private:
Gas Supply Type/Description Joint Treatment Pipe Size
Main to House
House to Fixtures
Waste Disposal Type/Description Joint Treatment Pipe Size
House to Main or Plant
Under Basement Floor
Above Basement Floor to Toilets
Above Basement Floor to Sinks
Above Basement Floor to
Sump Pump
Venting
Flashing of Vents
Water Supply Type/Description Joint Treatment Pipe Size
Main to House
House to Water Heater
House to Bathrooms
House to Kitchen Sink
House to Refrigerator
House to Dishwasher
- 1 -
House to Ice Maker
Other
Bathroom-Fixtures Model/Description
Master Bath Guest Bath Bath #1 Bath #2
Water Closet
Toilet Seat
Shower
Tub
Tub Faucet & Control Lever
Shower Faucet & Control
Lavatory Faucet & Control
Lavatory
Bidet
Whirlpool/Jacuzzi
Location, Type & Number of:
Water Stops/Shutoffs:
Location, Soft Water:
Exterior Water Faucets:
Fixture Description-Brand Name, Model Number, etc. Size/Other
Kitchen Sink
Kit. Sink Faucet/Control
Waste Disposal
Wet Bar Sink
Bar Sink Faucet/Control
Washer Hook-up
Laundry Tub
Laundry Faucet/Control
Water Heater
Sump Pump
Water Softener
Other
Contractor shall provide all labor and materials, and perform all work necessary for the
completion of the residence, structure, or improvements as described in the drawings and
- 2 -
specifications signed by both Owner and Contractor (“Project”) Such drawings and
specifications are hereby made a part of this Contract. Drawings and specifications shall
contain a scale drawing showing the shape, size, and dimensions of the construction and
equipment together with a description of the work to be done, materials to be used, and the
equipment to be used or installed.
2. WORK SITE: The Project shall be constructed on the property of Owner located at
and more
particularly described as (hereafter
"the Work Site"). Owner hereby authorizes Contractor to commence and complete the usual and
customary excavation and grading on the Work Site as may be required in the judgment of the
Contractor to complete the Project. Unless called for in the drawings or specifications, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before .
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be included as part of
the Project price.
5. SOIL CONDITIONS: Contractor shall have no responsibility for the condition of the soils at the
Work Site. Any excavation, filling or other work required by the Owner other than the usual and
customary excavation and grading shall be agreed to in a Change Order for an amount in addition
to the Contract Price. Contractor shall not be responsible for any damages suffered by Owner as a
result of the soil conditions at the Work Site.
6. INSURANCE: Contractor shall maintain general liability, workers compensation and builder's
risk insurance.
7. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
out property lines to the Contractor. If the Owner or Contractor has any doubt about the location
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that
affect the Work Site.
8. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the drawings and specifications, from time to time during the construction of
the Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the
estimated cost.
9. CONTRACT PRICE:
- 3 -
{COST PLUS}
Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of
$ for performing the services set forth in the scope of the work. Contractor
shall be paid as follows:
.
OR
{FIXED FEE}
Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.
Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.
10. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10)
days from the due date shall be deemed a material breach of this Contract. If payment is not made
when due, Contractor may suspend work on the job until such time as all payments due have been
made without breach of the Contract pending payment or resolution of any dispute. Owner agrees
to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the
rate of 1% per month.
11. DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contractor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If the
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
either party, Contractor shall be excused from further performance under this Contract and Owner
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.
12. ASSIGNMENT : Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.
13. INTERPRETATION:
(a) Interpretation of Documents. The Contract, drawings, and specifications are intended to
supplement one another. In the event of a conflict, the specifications shall control the drawings,
and the Contract shall control both. If work is displayed on the drawings but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the drawings,
Contractor shall be required to perform the work as though it were called for and displayed in both
- 4 -
documents.
(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exists
between the parties. This Contract may only be modified only by a written agreement signed by
both parties.
(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
laws of the State of Missouri.
14. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing party in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.
15. PERFORMANCE:
(a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
this Contract provided Contractor shall remain fully responsible for the proper completion of the
Project.
(b) All work shall be completed in a workman-like manner and in compliance with all building
codes and applicable laws. To the extent required by law, all work shall be performed by
individuals duly licensed and authorized by law to perform said work.
(c) Contractor agrees to remove all debris and leave the premises in broom clean condition.
16 . WARRANTY: Contractor agrees to repair or replace any defective or malfunctioning faucets,
valves, fixtures, equipment or fittings for a period of year(s). Contractor agrees to eliminate
excessive pipe hammering and repair or replace any soil, waste, venting or water piping found to
be leaking (except condensation) or improper flow of supply or effluent due to an obstruction
caused by settling or foreign matter in the piping at the time of installation or infiltrating
thereafter, for a period of year(s). Owner and Contractor agree to inspect all equipment,
fixtures, and piping within days after installation; and Contractor agrees to repair or replace
any chips, cracked, defective or otherwise malfunctioning items be found by such inspection. All
said defects arising after year(s) and defects in material are not warranted by Contractor.
Contractor hereby assigns to Owner all warranties on materials as provided by the manufacturer of
such materials.
AGREED:
CONTRACTOR:
Signature
Print Name & Title
OWNER:
Signature
Print Name
- 5 -
Date
License Number
Name and Address of License Holder Date
STATUTORY NOTICES TO OWNER:
NOTICE TO OWNER
FAILURE OF THIS CONTRACTOR TO PAY THOSE PERSONS SUPPLYING MATERIAL OR
SERVICES TO COMPLETE THIS CONTRACT CAN RESULT IN THE FILING OF A
MECHANIC'S LIEN ON THE PROPERTY WHICH IS THE SUBJECT OF THIS CONTRACT
PURSUANT TO CHAPTER 429, RSMO. TO AVOID THIS RESULT YOU MAY ASK THIS
CONTRACTOR FOR "LIEN WAIVERS" FROM ALL PERSONS SUPPLYING MATERIAL OR
SERVICES FOR THE WORK DESCRIBED IN THIS CONTRACT. FAILURE TO SECURE
LIEN WAIVERS MAY RESULT IN YOUR PAYING FOR LABOR AND MATERIAL TWICE.
CONSENT OF OWNER
CONSENT IS HEREBY GIVEN FOR FILING OF MECHANIC'S LIENS BY ANY PERSON
WHO SUPPLIES MATERIALS OR SERVICES FOR THE WORK DESCRIBED IN THIS
CONTRACT ON THE PROPERTY ON WHICH IT IS LOCATED IF HE IS NOT PAID.
___________________________
(date)
___________________________
(owner's signature)
SECTIONS 436.350 TO 436.365 OF MISSOURI REVISED STATUTES PROVIDE YOU WITH
CERTAIN RIGHTS IF YOU HAVE A DISPUTE WITH A CONTRACTOR REGARDING
CONSTRUCTION DEFECTS. EXCEPT FOR CLAIMS FILED IN SMALL CLAIMS COURT, IF
YOU HAVE A DISPUTE WITH A CONTRACTOR, YOU MUST DELIVER TO THE
CONTRACTOR A WRITTEN CLAIM OF ANY CONSTRUCTION CONDITIONS YOU
ALLEGE ARE DEFECTIVE AND PROVIDE YOUR CONTRACTOR THE OPPORTUNITY TO
MAKE AN OFFER TO REPAIR OR PAY FOR THE DEFECTS. YOU ARE NOT OBLIGATED
TO ACCEPT ANY OFFER MADE BY THE CONTRACTOR. READ THIS NOTICE
CAREFULLY. THERE ARE STRICT DEADLINES AND PROCEDURES UNDER SECTIONS
436.350 TO 436.365 WHICH MUST BE OBEYED IN ORDER TO PRESERVE YOUR ABILITY
TO FILE A LAWSUIT. OTHER THAN REPAIRS TO WORK DONE BY THE CONTRACTOR
THAT ARE NECESSARY TO PROTECT THE LIFE, HEALTH, OR SAFETY OF PERSONS
LIVING IN A RESIDENCE, OR TO AVOID ADDITIONAL SIGNIFICANT AND MATERIAL
DAMAGE TO THE RESIDENCE PURSUANT TO SUBSECTION 10 OF SECTION 436.356,
- 6 -
YOU MAY NOT INCLUDE IN CLAIMS AGAINST YOUR CONTRACTOR THE COSTS OF
OTHER REPAIRS YOU PERFORM BEFORE YOU ARE ENTITLED TO FILE A LAWSUIT
UNDER SECTIONS 436.350 TO 436.365.
- 7 -
* Optional notice required only for contracts to be paid from insurance proceeds:
You may cancel this contract at any time before midnight on the fifth business day after you have
received written notification from your insurer that all or any part of the claim or contract is not a
covered loss under the insurance policy. See attached notice of cancellation form for an explanation
of this right.
NOTICE OF CANCELLATION
If you are notified by your insurer that all or any part of the claim or contract is not a covered loss
under the insurance policy, you may cancel the contract by mailing or delivering a signed and dated
copy of this cancellation notice or any other written notice to (name of contractor) at (address of
contractor's place of business) at any time prior to midnight on the fifth business day after you have
received such notice from your insurer. If you cancel, any payments made by you under the
contract, except for certain emergency work already performed by the contractor, will be returned
to you within ten business days following receipt by the contractor of your cancellation notice.
I HEREBY CANCEL THIS TRANSACTION
___________________________
(date)
___________________________
(insured's signature)
- 8 -
* Optional notice required only for home solicitation sales:
NOTICE OF CANCELLATION
___________________________
(Date of transaction must be filled in at time of sale by seller.)
If this agreement was solicited at your residence and you do not want the goods or services, you
may cancel, without further obligation, this agreement by mailing a notice to the seller at the
address as shown below, within 3 business days following the above date. You shall return the goods
to seller in substantially the same condition as when you obtained them. Seller will then cancel all
contracts and negotiable instruments executed by you and return any property given by you to
seller within 10 days from date of transaction. If seller does not pick up the purchased goods within
20 days from date of your cancellation, you may retain or dispose of the goods without any further
obligation. The notice must be mailed to: ___________________________ . (Name and mailing
address of seller must be filled in at time of sale.)
- 9 -
Valuable advice on completing your ‘Plumbing Contract For Contractor Missouri’ online
Are you fed up with the burden of handling paperwork? Look no further than airSlate SignNow, the leading eSignature solution for both individuals and enterprises. Bid farewell to the tedious routine of printing and scanning documents. With airSlate SignNow, you can easily finalize and sign paperwork online. Utilize the powerful features integrated into this user-friendly and economical platform to transform your method of paperwork organization. Whether you need to sign documents or collect electronic signatures, airSlate SignNow manages it all effortlessly, with only a few clicks.
Adhere to this comprehensive guide:
- Log into your account or initiate a complimentary trial with our service.
- Select +Create to upload a file from your device, cloud storage, or our template repository.
- Access your ‘Plumbing Contract For Contractor Missouri’ in the editor.
- Click Me (Fill Out Now) to finish the form on your end.
- Add and designate fillable fields for others (if necessary).
- Continue with the Send Invite settings to solicit eSignatures from others.
- Save, print your version, or transform it into a reusable template.
No need to worry if you need to work together with your colleagues on your Plumbing Contract For Contractor Missouri or send it for notarization—our solution offers everything necessary to achieve such objectives. Register with airSlate SignNow today and enhance your document management to a new level!