Establishing secure connection… Loading editor… Preparing document…
Navigation

Fill and Sign the Storing the Topsoil and Stockpile Backfill Taken from All Excavated Areas at Form

Fill and Sign the Storing the Topsoil and Stockpile Backfill Taken from All Excavated Areas at Form

How it works

Open the document and fill out all its fields.
Apply your legally-binding eSignature.
Save and invite other recipients to sign it.

Rate template

4.5
33 votes
EXCAVATION, BACKFILL, GRADING, AND HAULING CONTRACT THIS EXCAVATION, BACKFILL, GRADING, AND HAULING CONTRACT (“Contract”), effective as of the date of the last party to sign below, is between  , having an address at  ("Contractor") and , having an address at  ("Owner"). For valuable consideration the parties hereby agree as follows:1. SCOPE OF WORK: Contractor shall provide all labor and materials, and perform all work necessary for the completion of the residence, structure, or improvements as described in the drawings and specifications signed by both Owner and Contractor (“Project”) and more particularly described as  Such drawings and specifications are hereby made a part of this Contract. Drawings and specifications shall contain a scale drawing showing the shape, size, and dimensions of the construction and equipment together with a description of the work to be done, materials to be used, and the equipment to be used or installed. (a) Contractor shall maintain continuous responsibility for proper placement of all bench marks, monuments and reference points and leave the trees, landscaping at the project work site reasonably undamaged.(b) Contractor shall ensure access of workmen with concrete trucks to the foundation area by storing the topsoil and stockpile backfill taken from all excavated areas at  . (c) Excavation shall be to undisturbed soil and all material of every description existing in the excavation area to the depth of . Maximum allowable excavation grade variance will be  inches over each excavated level (if more than one) to allow for rainfall and normal water drainage. (d) Basement excavations will have approximately  inches overdig of the dwelling footing dimensions and establish a  degree bank slope to prevent cave-in and allow for installation of footings, foundation walls, piers, drain tile and gravel. (e) Contractor shall remove all unsuitable earth materials, topsoil and vegetation from excavated areas receiving fill and place  fill gravel in sub-grade concrete floor, patio, driveway, sidewalk, and front stoop areas as indicated on the  to ensure settlement. (f) Contractor will use only backfill material that is reasonably free from roots, debris, rocks larger than  inches in diameter and; and deposit backfill material in  inch layers against foundation walls in such manner to avoid wall damage and to ensure minimum settlement. (g) Contractor shall rough grade the dwelling project area to  inches below the finished grade elevation. (h) Contractor shall use  to bring the dwelling project area to finished grade elevation that ensures proper water drainage away from the dwelling. (i) If any rocks larger than  are discovered during excavation, Contractor shall place such sized rocks in the . (j) Contractor shall notify  of unusual digging or soil conditions.(k) Interior areas shall be backfilled as instructed by Owner to reduce settling.(l) Owner will be responsible for providing hand labor, bracing, guard rails, fencing and other items necessary for the protection of the workmen and public.(m) Prior to backfilling and grading Owner shall be responsible for removing all construction debris from all excavated and fill areas including but not limited to foundation and concrete flat work forming materials; dewatering, removing old materials, fences and  from the site.2. WORK SITE: The Project shall be constructed on the property of Owner located at  and more particularly described as  (hereafter "the Work Site"). Owner hereby authorizes Contractor to commence and complete the usual and customary excavation and grading on the Work Site as may be required in the judgment of the Contractor to complete the Project3.TIME OF COMPLETION: Contractor shall commence the work to be performed under this Contract on or before  and shall substantially complete the work on or before  . Contractor shall not be liable for any delay due to circumstances beyond its control including strikes, casualty, acts of God, illness, injury, or general unavailability of materials. 4.PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may be required by the local municipal/county government, the cost thereof shall be included as part of the Project price.5.INSURANCE: Contractor shall maintain general liability, workers compensation and builder's risk insurance.6. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point out property lines to the Contractor. If the Owner or Contractor has any doubt about the location of the property lines, Owner shall provide Contractor with boundary stakes through a licensed surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that affect the Work Site.7.CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work, including changes to the drawings and specifications, from time to time during the construction of the Project. However, any such change or modification shall only be made by written "Change Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the estimated cost.8.CONTRACT PRICE:{COST PLUS}Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of $ for performing the services set forth in the scope of the work. Contractor shall be paid as follows:  .OR{FIXED FEE}Owner agrees to pay Contractor the sum of $ for performing the services set forth in the scope of the work. Contractor shall be paid as follows:  .Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or materials provided at the time the next periodic payment shall be due.9.LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10) days from the due date shall be deemed a material breach of this Contract. If payment is not made when due, Contractor may suspend work on the job until such time as all payments due have been made without breach of the Contract pending payment or resolution of any dispute. Owner agrees to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the rate of 1% per month.10.DESTRUCTION AND DAMAGE: If the Project is destroyed or damaged for any reason, except where such destruction or damage was caused by the sole negligence of the Contractor or its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in rebuilding or restoring the Project to its condition prior to such destruction or damage. If the estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by either party, Contractor shall be excused from further performance under this Contract and Owner shall pay Contractor a percentage of the Contract price in proportion to the amount of work accomplished prior to the destruction or damage. 11.ASSIGNMENT: Neither party may assign this Contract, or payments due under the Contract, without the other party’s written consent. Any such assignment shall be void and of no effect.12. INTERPRETATION:(a)Interpretation of Documents. The Contract, drawings, and specifications are intended to supplement one another. In the event of a conflict, the specifications shall control the drawings, and the Contract shall control both. If work is displayed on the drawings but not called for in the specifications, or if the work is called for in the specifications but not displayed on the drawings, Contractor shall be required to perform the work as though it were called for and displayed in both documents.(b)Entire Agreement. This Contract constitutes the entire agreement of the parties. No other agreements, oral or written, pertaining to the work to be performed under this Contract exists between the parties. This Contract may only be modified only by a written agreement signed by both parties.(c) Governing Law. This Contract shall be interpreted and governed in accordance with the laws of the State of Missouri.13. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action against the other party arising from or relating to this Contract, the prevailing party in such proceeding shall be entitled to recover reasonable attorney fees and court costs.14. PERFORMANCE:(a)Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant this Contract provided Contractor shall remain fully responsible for the proper completion of the Project. (b) All work shall be completed in a workman-like manner and in compliance with all building codes and applicable laws. To the extent required by law, all work shall be performed by individuals duly licensed and authorized by law to perform said work.15.WARRANTY: Contractor's warranty shall be limited to defects in workmanship within the scope of work performed by Contractor and which arise and become known within  from the date hereof. All said defects arising after  and defects in material are not warranted by Contractor. Owner agrees to inspect the work with Contractor within  day(s) following completion of each excavation, backfilling and grading and phase and make a written record of any defects. Contractor shall not be responsible for Owners’/Builders' negligence. Contractor agrees to correct immediately, weather permitting, any defects in the excavation, backfilling or grading work discovered to be due to fault of Contractor. Contractor hereby assigns to Owner all warranties on materials as provided by the manufacturer of such materials. AGREED:CONTRACTOR:Signature______________________________Print Name & Title ______________Date____________________License Number________________________________Name and Address of License HolderOWNER:Signature______________________________Print Name______________Date STATUTORY NOTICES TO OWNER: NOTICE TO OWNER FAILURE OF THIS CONTRACTOR TO PAY THOSE PERSONS SUPPLYING MATERIAL OR SERVICES TO COMPLETE THIS CONTRACT CAN RESULT IN THE FILING OF A MECHANIC'S LIEN ON THE PROPERTY WHICH IS THE SUBJECT OF THIS CONTRACT PURSUANT TO CHAPTER 429, RSMO. TO AVOID THIS RESULT YOU MAY ASK THIS CONTRACTOR FOR "LIEN WAIVERS" FROM ALL PERSONS SUPPLYING MATERIAL OR SERVICES FOR THE WORK DESCRIBED IN THIS CONTRACT. FAILURE TO SECURE LIEN WAIVERS MAY RESULT IN YOUR PAYING FOR LABOR AND MATERIAL TWICE. CONSENT OF OWNER CONSENT IS HEREBY GIVEN FOR FILING OF MECHANIC'S LIENS BY ANY PERSON WHO SUPPLIES MATERIALS OR SERVICES FOR THE WORK DESCRIBED IN THIS CONTRACT ON THE PROPERTY ON WHICH IT IS LOCATED IF HE IS NOT PAID.___________________________(date)___________________________ (owner's signature)SECTIONS 436.350 TO 436.365 OF MISSOURI REVISED STATUTES PROVIDE YOU WITH CERTAIN RIGHTS IF YOU HAVE A DISPUTE WITH A CONTRACTOR REGARDING CONSTRUCTION DEFECTS. EXCEPT FOR CLAIMS FILED IN SMALL CLAIMS COURT, IF YOU HAVE A DISPUTE WITH A CONTRACTOR, YOU MUST DELIVER TO THE CONTRACTOR A WRITTEN CLAIM OF ANY CONSTRUCTION CONDITIONS YOU ALLEGE ARE DEFECTIVE AND PROVIDE YOUR CONTRACTOR THE OPPORTUNITY TO MAKE AN OFFER TO REPAIR OR PAY FOR THE DEFECTS. YOU ARE NOT OBLIGATED TO ACCEPT ANY OFFER MADE BY THE CONTRACTOR. READ THIS NOTICE CAREFULLY. THERE ARE STRICT DEADLINES AND PROCEDURES UNDER SECTIONS 436.350 TO 436.365 WHICH MUST BE OBEYED IN ORDER TO PRESERVE YOUR ABILITY TO FILE A LAWSUIT. OTHER THAN REPAIRS TO WORK DONE BY THE CONTRACTOR THAT ARE NECESSARY TO PROTECT THE LIFE, HEALTH, OR SAFETY OF PERSONS LIVING IN A RESIDENCE, OR TO AVOID ADDITIONAL SIGNIFICANT AND MATERIAL DAMAGE TO THE RESIDENCE PURSUANT TO SUBSECTION 10 OF SECTION 436.356, YOU MAY NOT INCLUDE IN CLAIMS AGAINST YOUR CONTRACTOR THE COSTS OF OTHER REPAIRS YOU PERFORM BEFORE YOU ARE ENTITLED TO FILE A LAWSUIT UNDER SECTIONS 436.350 TO 436.365. * Optional notice required only for contracts to be paid from insurance proceeds:You may cancel this contract at any time before midnight on the fifth business day after you have received written notification from your insurer that all or any part of the claim or contract is not a covered loss under the insurance policy. See attached notice of cancellation form for an explanation of this right. NOTICE OF CANCELLATION If you are notified by your insurer that all or any part of the claim or contract is not a covered loss under the insurance policy, you may cancel the contract by mailing or delivering a signed and dated copy of this cancellation notice or any other written notice to (name of contractor) at (address of contractor's place of business) at any time prior to midnight on the fifth business day after you have received such notice from your insurer. If you cancel, any payments made by you under the contract, except for certain emergency work already performed by the contractor, will be returned to you within ten business days following receipt by the contractor of your cancellation notice.I HEREBY CANCEL THIS TRANSACTION___________________________(date)___________________________(insured's signature) * Optional notice required only for home solicitation sales: NOTICE OF CANCELLATION ___________________________(Date of transaction must be filled in at time of sale by seller.)If this agreement was solicited at your residence and you do not want the goods or services, you may cancel, without further obligation, this agreement by mailing a notice to the seller at the address as shown below, within 3 business days following the above date. You shall return the goods to seller in substantially the same condition as when you obtained them. Seller will then cancel all contracts and negotiable instruments executed by you and return any property given by you to seller within 10 days from date of transaction. If seller does not pick up the purchased goods within 20 days from date of your cancellation, you may retain or dispose of the goods without any further obligation. The notice must be mailed to: ___________________________. (Name and mailing address of seller must be filled in at time of sale.)

Valuable advice on preparing your ‘Storing The Topsoil And Stockpile Backfill Taken From All Excavated Areas At’ online

Are you fed up with the burden of handling paperwork? Look no further than airSlate SignNow, the premier electronic signature solution for individuals and businesses. Wave goodbye to the tedious cycle of printing and scanning documents. With airSlate SignNow, you can effortlessly complete and sign paperwork online. Utilize the comprehensive tools included in this user-friendly and cost-effective platform and transform your method of paperwork management. Whether you need to sign forms or gather electronic signatures, airSlate SignNow manages it all easily, requiring just a few clicks.

Follow this detailed guide:

  1. Log into your account or initiate a free trial with our service.
  2. Click +Create to upload a document from your device, cloud storage, or our form library.
  3. Open your ‘Storing The Topsoil And Stockpile Backfill Taken From All Excavated Areas At’ in the editor.
  4. Click Me (Fill Out Now) to prepare the form on your end.
  5. Add and assign fillable fields for others (if needed).
  6. Proceed with the Send Invite settings to request eSignatures from others.
  7. Download, print your version, or convert it into a reusable template.

Don’t fret if you need to collaborate with your team on your Storing The Topsoil And Stockpile Backfill Taken From All Excavated Areas At or send it for notarization—our platform provides you with all the necessary tools to complete such tasks. Register with airSlate SignNow today and elevate your document management to a new level!

Here is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.

Need help? Contact Support

The best way to complete and sign your storing the topsoil and stockpile backfill taken from all excavated areas at form

Save time on document management with airSlate SignNow and get your storing the topsoil and stockpile backfill taken from all excavated areas at form eSigned quickly from anywhere with our fully compliant eSignature tool.

How to Sign a PDF Online How to Sign a PDF Online

How to complete and sign paperwork online

Previously, coping with paperwork required lots of time and effort. But with airSlate SignNow, document management is easy and fast. Our powerful and easy-to-use eSignature solution enables you to easily complete and electronically sign your storing the topsoil and stockpile backfill taken from all excavated areas at form online from any internet-connected device.

Follow the step-by-step guide to eSign your storing the topsoil and stockpile backfill taken from all excavated areas at form template online:

  • 1.Register for a free trial with airSlate SignNow or log in to your account with password credentials or SSO authentication.
  • 2.Click Upload or Create and import a form for eSigning from your device, the cloud, or our form collection.
  • 3.Click on the document name to open it in the editor and use the left-side menu to fill out all the empty areas accordingly.
  • 4.Put the My Signature field where you need to eSign your sample. Type your name, draw, or import an image of your regular signature.
  • 5.Click Save and Close to accomplish editing your completed document.

Once your storing the topsoil and stockpile backfill taken from all excavated areas at form template is ready, download it to your device, save it to the cloud, or invite other parties to electronically sign it. With airSlate SignNow, the eSigning process only takes a few clicks. Use our robust eSignature tool wherever you are to deal with your paperwork successfully!

How to Sign a PDF Using Google Chrome How to Sign a PDF Using Google Chrome

How to complete and sign documents in Google Chrome

Completing and signing documents is easy with the airSlate SignNow extension for Google Chrome. Adding it to your browser is a fast and beneficial way to deal with your forms online. Sign your storing the topsoil and stockpile backfill taken from all excavated areas at form template with a legally-binding electronic signature in just a few clicks without switching between tools and tabs.

Follow the step-by-step guidelines to eSign your storing the topsoil and stockpile backfill taken from all excavated areas at form template in Google Chrome:

  • 1.Go to the Chrome Web Store, locate the airSlate SignNow extension for Chrome, and add it to your browser.
  • 2.Right-click on the link to a document you need to eSign and choose Open in airSlate SignNow.
  • 3.Log in to your account using your credentials or Google/Facebook sign-in option. If you don’t have one, sign up for a free trial.
  • 4.Utilize the Edit & Sign menu on the left to complete your template, then drag and drop the My Signature field.
  • 5.Insert an image of your handwritten signature, draw it, or simply type in your full name to eSign.
  • 6.Make sure all data is correct and click Save and Close to finish editing your form.

Now, you can save your storing the topsoil and stockpile backfill taken from all excavated areas at form sample to your device or cloud storage, send the copy to other individuals, or invite them to electronically sign your document with an email request or a secure Signing Link. The airSlate SignNow extension for Google Chrome enhances your document processes with minimum effort and time. Try airSlate SignNow today!

How to Sign a PDF in Gmail How to Sign a PDF in Gmail How to Sign a PDF in Gmail

How to fill out and sign forms in Gmail

When you receive an email containing the storing the topsoil and stockpile backfill taken from all excavated areas at form for signing, there’s no need to print and scan a file or download and re-upload it to another program. There’s a better solution if you use Gmail. Try the airSlate SignNow add-on to promptly eSign any documents right from your inbox.

Follow the step-by-step guidelines to eSign your storing the topsoil and stockpile backfill taken from all excavated areas at form in Gmail:

  • 1.Visit the Google Workplace Marketplace and look for a airSlate SignNow add-on for Gmail.
  • 2.Set up the tool with a corresponding button and grant the tool access to your Google account.
  • 3.Open an email with an attachment that needs signing and use the S sign on the right panel to launch the add-on.
  • 4.Log in to your airSlate SignNow account. Opt for Send to Sign to forward the file to other parties for approval or click Upload to open it in the editor.
  • 5.Put the My Signature field where you need to eSign: type, draw, or upload your signature.

This eSigning process saves efforts and only requires a couple of clicks. Use the airSlate SignNow add-on for Gmail to adjust your storing the topsoil and stockpile backfill taken from all excavated areas at form with fillable fields, sign forms legally, and invite other individuals to eSign them al without leaving your mailbox. Improve your signature workflows now!

How to Sign a PDF on a Mobile Device How to Sign a PDF on a Mobile Device How to Sign a PDF on a Mobile Device

How to fill out and sign forms in a mobile browser

Need to rapidly fill out and sign your storing the topsoil and stockpile backfill taken from all excavated areas at form on a mobile phone while doing your work on the go? airSlate SignNow can help without needing to install extra software apps. Open our airSlate SignNow tool from any browser on your mobile device and add legally-binding electronic signatures on the go, 24/7.

Follow the step-by-step guidelines to eSign your storing the topsoil and stockpile backfill taken from all excavated areas at form in a browser:

  • 1.Open any browser on your device and follow the link www.signnow.com
  • 2.Sign up for an account with a free trial or log in with your password credentials or SSO authentication.
  • 3.Click Upload or Create and add a file that needs to be completed from a cloud, your device, or our form library with ready-made templates.
  • 4.Open the form and complete the blank fields with tools from Edit & Sign menu on the left.
  • 5.Put the My Signature area to the sample, then enter your name, draw, or add your signature.

In a few easy clicks, your storing the topsoil and stockpile backfill taken from all excavated areas at form is completed from wherever you are. Once you're finished editing, you can save the document on your device, build a reusable template for it, email it to other people, or invite them electronically sign it. Make your paperwork on the go quick and productive with airSlate SignNow!

How to Sign a PDF on iPhone How to Sign a PDF on iPhone

How to fill out and sign paperwork on iOS

In today’s corporate environment, tasks must be completed quickly even when you’re away from your computer. Using the airSlate SignNow app, you can organize your paperwork and approve your storing the topsoil and stockpile backfill taken from all excavated areas at form with a legally-binding eSignature right on your iPhone or iPad. Set it up on your device to conclude agreements and manage documents from anywhere 24/7.

Follow the step-by-step guide to eSign your storing the topsoil and stockpile backfill taken from all excavated areas at form on iOS devices:

  • 1.Open the App Store, search for the airSlate SignNow app by airSlate, and install it on your device.
  • 2.Launch the application, tap Create to import a form, and select Myself.
  • 3.Select Signature at the bottom toolbar and simply draw your signature with a finger or stylus to eSign the sample.
  • 4.Tap Done -> Save after signing the sample.
  • 5.Tap Save or take advantage of the Make Template option to re-use this paperwork later on.

This method is so straightforward your storing the topsoil and stockpile backfill taken from all excavated areas at form is completed and signed in just a few taps. The airSlate SignNow app works in the cloud so all the forms on your mobile device are kept in your account and are available whenever you need them. Use airSlate SignNow for iOS to boost your document management and eSignature workflows!

How to Sign a PDF on Android How to Sign a PDF on Android

How to complete and sign documents on Android

With airSlate SignNow, it’s simple to sign your storing the topsoil and stockpile backfill taken from all excavated areas at form on the go. Set up its mobile app for Android OS on your device and start improving eSignature workflows right on your smartphone or tablet.

Follow the step-by-step guide to eSign your storing the topsoil and stockpile backfill taken from all excavated areas at form on Android:

  • 1.Open Google Play, find the airSlate SignNow app from airSlate, and install it on your device.
  • 2.Log in to your account or create it with a free trial, then add a file with a ➕ option on the bottom of you screen.
  • 3.Tap on the uploaded document and select Open in Editor from the dropdown menu.
  • 4.Tap on Tools tab -> Signature, then draw or type your name to electronically sign the form. Fill out empty fields with other tools on the bottom if required.
  • 5.Use the ✔ key, then tap on the Save option to finish editing.

With an easy-to-use interface and full compliance with major eSignature standards, the airSlate SignNow app is the perfect tool for signing your storing the topsoil and stockpile backfill taken from all excavated areas at form. It even operates without internet and updates all record changes when your internet connection is restored and the tool is synced. Complete and eSign forms, send them for approval, and make multi-usable templates anytime and from anywhere with airSlate SignNow.

Sign up and try Storing the topsoil and stockpile backfill taken from all excavated areas at form
  • Close deals faster
  • Improve productivity
  • Delight customers
  • Increase revenue
  • Save time & money
  • Reduce payment cycles