- 1 -
DRYWALL CONTRACT
THIS DRYWALL CONTRACT (“Contract”), effective as of the date of the last party to sign
below, is between , having an address at
("Contractor") and ,
having an address at
("Owner").
For valuable consideration the parties hereby agree as follows:
1. SCOPE OF WORK: Contractor shall provide all labor and materials, and perform all work
necessary for the completion of the residence, structure, or improvements as described in the
drawings and specifications signed by both Owner and Contractor (“Project”) and more
particularly described as
Such drawings and specifications are hereby made a part of this Contract. Drawings and
specifications shall contain a scale drawing showing the shape, size, and dimensions of the
construction and equipment together with a description of the work to be done, material s to be
used, and the equipment to be used or installed.
Brand Name of Drywall:
Material: ” Drywall ” Drywall ” Drywall ” Drywall ” Drywall
Areas to Receive:
Hung With:
Drywall Nails inches on
center and glued. inches on
center and glued. inches on
center and glued. inches on
center and glued. inches on
center and glued.
Surface and Joint
Treatment will be taped and coat(s) of drywall compound applied, sanded and readied for paint ing
or other wall coverings.
Special Wall
Treatment
Ceiling
Treatment Labor and necessary materials to spray ceilings with textured spray; labor and ne cessary
materials to apply to ceilings.
2. WORK SITE: The Project shall be constructed on the property of Owner located at
and more
particularly described as (hereafter
"the Work Site"). Owner hereby authorizes Contractor to commence and complete the usua l and
customary excavation and grading on the Work Site as may be required in the judgment of the
Contractor to complete the Project. Unless called for in the drawings or specificat ions, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before
.
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be include d as part of
the Project price.
- 2 -
5. INSURANCE: Contractor shall maintain general liability, workers compensation and builder's
risk insurance.
6. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
out property lines to the Contractor. If the Owner or Contractor has any doubt about the locat ion
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions tha t
affect the Work Site.
7. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the drawings and specifications, from time to time during the const ruction of
the Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contrac tor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not i t is in excess of the
estimated cost.
8. CONTRACT PRICE: {COST PLUS}
Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of
$ for performing the services set forth in the scope of the work. Contractor
shall be paid as follows:
.
OR
{FIXED FEE}
Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.
Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.
9. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10)
days from the due date shall be deemed a material breach of this Contract. If paym ent is not made
when due, Contractor may suspend work on the job until such time as all payments due have bee n
made without breach of the Contract pending payment or resolution of any dispute. Owner agree s
to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the
rate of 1% per month.
- 3 -
10. DESTRUCTION AND DAMAGE: If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contra ctor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If t he
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
either party, Contractor shall be excused from further performance under this Contract and Owner
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.
11. ASSIGNMENT : Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.
12. INTERPRETATION: (a) Interpretation of Documents. The Contract, drawings, and specifications are intended to
supplement one another. In the event of a conflict, the specifications shall control the drawings,
and the Contract shall control both. If work is displayed on the drawings but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the drawings,
Contractor shall be required to perform the work as though it were called for and displayed in both
documents.
(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exi sts
between the parties. This Contract may only be modified only by a written agreeme nt signed by
both parties.
(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
laws of the State of Washington.
13. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing part y in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.
14. PERFORMANCE: (a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
this Contract provided Contractor shall remain fully responsible for the proper completion of the
Project.
(b) All work shall be completed in a workman-like manner and in compliance with all
building codes and applicable laws. To the extent required by law, all work shall be pe rformed by
individuals duly licensed and authorized by law to perform said work.
(c) Contractor agrees to remove all debris and leave the premises in broom clean condition.
15. WARRANTY: Contractor agrees to repair any defects in workmanship to walls and ceilings
such as nail pops, blisters and hairline cracks in excess of " for a period of .
Contractor agrees to make such repairs at the following times: prior to final payment , days
after move-in, and days after the move-in date. Owner agrees to provide Contra ctor with a
- 4 -
list of the defects and their exact location at each of the above-stated time periods; and Owner
agrees Contractor shall have a week time period in which to complete repairs. Contractor
shall not be responsible for any touch-up painting, nor be responsible for color mismatch of
painted surfaces, since this may be a result of oxidation or batch number of the painting mix.
Contractor's warranty shall be limited to defects in workmanship within the scope of work
performed by Contractor and which arise and become known within year(s) from the date
hereof. All said defects arising after year(s) and defects in material are not warranted by
Contractor. Contractor hereby assigns to Owner all warranties on materials as provided by the
manufacturer of such materials.
AGREED:
CONTRACTOR:
Signature
Print Name & Title
Date
License Number
Name and Address of License Holder
OWNER:
Signature
Print Name
Date
- 5 -
STATUTORY NOTICE REQUIRED FOR A CONTRACT FOR SALE, CONSTRUCTION, OR
SUBSTANTIAL REMODEL OF A RESIDENCE
CHAPTER 64.50 RCW CONTAINS IMPORTANT REQUIREMENTS YOU MUST FOLLOW
BEFORE YOU MAY FILE A LAWSUIT FOR DEFECTIVE CONSTRUCTION AGAINST THE
SELLER OR BUILDER OF YOUR HOME. FORTY-FIVE DAYS BEFORE YOU FILE YOUR
LAWSUIT, YOU MUST DELIVER TO THE SELLER OR BUILDER A WRITTEN NOTICE OF ANY
CONSTRUCTION CONDITIONS YOU ALLEGE ARE DEFECTIVE AND PROVIDE YOUR SELLER
OR BUILDER THE OPPORTUNITY TO MAKE AN OFFER TO REPAIR OR PAY FOR THE
DEFECTS. YOU ARE NOT OBLIGATED TO ACCEPT ANY OFFER MADE BY THE BUILDER OR
SELLER. THERE ARE STRICT DEADLINES AND PROCEDURES UNDER STATE LAW, AND
FAILURE TO FOLLOW THEM MAY AFFECT YOUR ABILITY TO FILE A LAWSUIT.
- 6 -
Notes:
The following “Disclosure Statement to Customer” is required for construction
contracts of $1,000 or more.
- 7 -
DISCLOSURE STATEMENT TO CUSTOMER
This contractor is registered with the state of Washington, registration no. ,
and has posted with the state a bond or deposit of for the purpose of
satisfying claims against the contractor for breach of contract including negligent or improper
work in the conduct of the contractor’s business. The expiration date of this contractor’s
registration is .
THIS BOND OR DEPOSIT MIGHT NOT BE SUFFICIENT TO COVER A CLAIM
THAT MIGHT ARISE FROM THE WORK DONE UNDER YOUR CONTRACT.
This bond or deposit is not for your exclusive use because it covers all work performed by this
contractor. The bond or deposit is intended to pay valid claims up to that you and other
customers, suppliers, subcontractors, or taxing authorities may have.
FOR GREATER PROTECTION YOU MAY WITHHOLD A PERCENTAGE OF
YOUR CONTRACT.
You may withhold a contractually defined percentage of your construction contract as
retainage for a stated period of time to provide protection to you and help insure that your
project will be completed as required by your contract.
YOUR PROPERTY MAY BE LIENED.
If a supplier of materials used in your construction project or an employee or subcontractor of
your contractor or subcontractors is not paid, your property may be liened to force payment
and you could pay twice for the same work.
FOR ADDITIONAL PROTECTION YOU MAY REQUEST THE CONTRACTOR TO
PROVIDE YOU WITH ORIGINAL “LIEN RELEASE” DOCUMENTS FROM EACH
SUPPLIER OR SUBCONTRACTOR AT YOUR PROJECT.
The contractor is required to provide you with further information about lien release document
if you request it. General information is also available from the state Department of Labor and
Industries.
Acknowledgement of Receipt of Notice to Customer:
Dated this day of of the year .
Customers Full Name and Signature
Useful tips for creating your ‘Warranty Contractor Agrees To Repair Any Defects In Workmanship To Walls And Ceilings’ online
Are you fed up with the inconvenience of dealing with paperwork? Look no further than airSlate SignNow, the premier electronic signature platform for individuals and businesses. Wave farewell to the lengthy process of printing and scanning documents. With airSlate SignNow, you can effortlessly complete and sign documents online. Utilize the robust features included in this user-friendly and affordable platform to transform your method of document handling. Whether you need to authorize forms or collect electronic signatures, airSlate SignNow manages it all effortlessly with just a few clicks.
Follow this step-by-step guide:
- Sign in to your account or initiate a free trial with our service.
- Click +Create to upload a document from your device, cloud storage, or our template collection.
- Open your ‘Warranty Contractor Agrees To Repair Any Defects In Workmanship To Walls And Ceilings’ in the editor.
- Click Me (Fill Out Now) to set up the document on your end.
- Add and assign fillable fields for others (if necessary).
- Proceed with the Send Invite settings to request eSignatures from others.
- Download, print a copy, or convert it into a reusable template.
Don't worry if you need to work with others on your Warranty Contractor Agrees To Repair Any Defects In Workmanship To Walls And Ceilings or send it for notarization—our solution provides everything you need to accomplish these tasks. Sign up with airSlate SignNow today and enhance your document management to a new height!
Construction warranty example
Standard one year construction warranty
Workmanship warranty example
Contractor workmanship warranty
Construction warranty period
1 year workmanship warranty
1 year construction warranty letter
How long does a contractor have to warranty work