Establishing secure connection… Loading editor… Preparing document…
Navigation

Fill and Sign the Contract of Building Form

Fill and Sign the Contract of Building Form

How it works

Open the document and fill out all its fields.
Apply your legally-binding eSignature.
Save and invite other recipients to sign it.

Rate template

4.7
57 votes
Contract for Construction of a Building with Architect to be Owner's Representative during the Construction Period Agreement made on the _____________________ (date) , between __________________________ (Name of Owner) , a corporation organized and existing under the laws of the state of ______________, with its principal office located at ____________________________________________________________________ __________ (street address, city, state, zip code) , referred to herein as Owner , and _________________________ (Name of Contractor), a corporation organized and existing under the laws of the state of ______________, with its principal office located at ____________________________________________________________________ __________ (street address, city, state, zip code) , referred to herein as Contractor . 1. Definitions Wherever used in these general conditions or in the other Contract Documents, the following terms shall have the meanings indicated that shall be applicable to both the singular and plural: A. Agreement. The written Agreement between Owner and Contractor covering the Work to be performed. The Contract Documents will be attached to and made a part of the Agreement. B. Application for Payment. The form furnished by Architect that is to be used by Contractor in requesting progress payments and that is to include the schedule of values required by Article 14, Paragraph A and an affidavit of Contractor that progress payments previously received from Owner on account of the Work have been applied by Contractor to discharge in full all of Contractor's obligations incurred in connection with the Work covered by all prior applications for payment. C. Bid. The offer or proposal of the bidder submitted on the prescribed form setting forth the prices for the Work to be performed. D. Bidder. Any person, firm, corporation, or other entity submitting a bid for the Work. E. Bonds. Bid, performance, and payment bonds and other instruments of security furnished by Contractor its surety in accordance with the Contract Documents. F. Change Order. A written order to Contractor signed by Owner authorizing an addition, deletion, or revision in the Work or an adjustment in the Contract price or the Contract time issued after execution of the Agreement. G. Contract Documents. The Agreement, the Contractor's bid, the bonds, the notice of award, specifications, drawings, and modifications. H. Contract Price. The total moneys payable to Contractor under the Contract Documents. I. Contract Time. The number of calendar days stated in the Agreement for the completion of the Work. J. Contractor. The person, firm, corporation, or other entity with whom Owner has executed the Agreement. K. Drawings. The drawings that show the character and scope of the Work to be performed and that have been prepared or approved by A rchitect and are referred to in the Contract Documents. L. Architect. The person, firm, corporation, or other entity named as such in the Agreement. M. Field Order. A written order issued by A rchitect that clarifies or interprets the Contract Documents in accordance with Article 9, Paragraph C or orders minor changes in the Work in accordance with Article 10, Paragraph B . N. Modification. 1. A written amendment of the Contract Documents signed by both parties, 2. A change order, 3. A written clarification or interpretation issued by Architect in accordance with Article 9, Paragraph C , or 4. A written order for a minor change or alteration in the Work issued by Architect pursuant to Article Ten, Paragraph B . A modification may only be issued after execution of the Agreement. O. Notice of Award. The written notice by Owner to Contractor that Contractor is the successful bidder and that on compliance with the conditions precedent to be fulfilled by Contractor within the time specified, Owner will execute and deliver the Agreement to it. P. Owner. The corporation for whom the Work is to be performed. Q. Project. The entire construction to be performed as provided in the Contract Documents. R. Resident Project Representative. The authorized representative of A rchitect who is assigned to the project site or any part of the project site. S. Shop Drawings. All drawings, diagrams, illustrations, brochures, schedules, and other data that are prepared by the Contractor, a subcontractor, manufacturer, supplier, or distributor and that illustrate the equipment, material, or some portion of the Work. T. Specifications. The instructions to bidders, addenda (whether issued prior to opening of bids or the execution of the Agreement), these general conditions, the special conditions, and the technical provisions. U. Subcontractor. An individual, firm, corporation, or other entity having a direct Contract with Contractor or with any other subcontractor for the performance of a part of the Work at the site. V. Substantial Completion. The date as certified by Architect when the construction of the project or a specified part of the project is sufficiently completed, in accordance with the Contract Documents, so that the project or specified part can be used for the purposes for which it was intended; or if there be no such certification, the date when final payment is due in accordance with Article 14, Paragraph M. W. Work. Any and all obligations, duties, and responsibilities necessary to the successful completion of the project assigned to or undertaken by Contractor under the Contract Documents, including the furnishing of all labor, materials, equipment, and other incidentals. 2. Preliminary Matters A. Award. The award of the Contract has been made to Contractor B. Execution of Agreement. At least three counterparts of this Agreement and such other Contract Documents as practicable will be signed by Owner and Contractor. Architect will identify those portions of the Contract Documents not so signed and such identification will be binding on all parties. Owner, Contractor and Architect will each receive an executed counterpart of the Contract Documents. C. Delivery of Bonds. Simultaneously with the execution and delivery of this Agreement, Contractor will deliver to Owner the required bonds. D. Forfeiture of Bid Security. Failure of the Contractor to deliver the required bonds within _____ days of the execution of this Agreement shall be just cause for Owner to annul the notice of award and declare the bid and any security for the bid forfeited. E. Copies of Documents. Owner will furnish to Contractor up to ____ copies of the specifications and drawings as are reasonably necessary for the execution of the Work. Additional copies will be furnished on request at the cost of reproduction. F. Before Starting Work. 1. Within ____ days after execution of the Agreement, Contractor will submit to A rchitect for approval, an estimated progress schedule indicating the starting and completion dates of the various stages of the Work, and a schedule of shop drawing submissions. 2. Before starting the Work, Contractor will furnish Owner and Architect certificates of insurance as required by Article 5 ; and a conference will be held to review the above schedules, to establish procedures for handling shop drawings and other submissions and for processing applications for payment, and to establish a working understanding between the parties as to the project. Present at the conference will be Owner or its representative, Architect, and Contractor. 3. Before undertaking the Work, Contractor will carefully study and compare the Contract Documents and check and verify all figures shown on such Documents and all field measurements. Contractor will at once report in writing to Architect any conflict, error, or discrepancy that it may discover. Contractor assumes full responsibility for having familiarized itself with the nature and extent of the Contract Documents, Work, locality, and local conditions that may in any manner affect the Work to be done. G. Qualification of Subcontractors and Suppliers. 1. Within ____ days after the execution of this Agreement, Contractor will submit to Owner and Architect for acceptance a list of the names of subcontractors and such other persons and organizations (including those who are to furnish principal items of materials or equipment) proposed for those portions of the Work as to which the identity of the subcontractors and other persons and organizations must be submitted as specified in the Contract Documents. Within _____ days after receipt of said list, A rchitect will notify the apparent Contractor in writing if either Owner or A rchitect , after due investigation, has reasonable objection to any subcontractor, person, or organization on such list. The failure of Owner or A rchitect to make objection to any subcontractor, person, or organization on the list within _____ days of receipt shall constitute an acceptance of such subcontractor, person, or organization. Acceptance of any such subcontractor, person, or organization shall not constitute a waiver of any right of Owner or Architect to reject defective work, material, or equipment, or work, material, or equipment not in conformance with the requirements of the Contract Documents. 2. If Owner or the Architect has reasonable objection to and refuses to accept any subcontractor, person, or organization on such list, Contractor will submit an acceptable substitute and the contract price shall be increased or decreased by the difference in cost occasioned by such substitution and an appropriate change order shall be issued. H. Starting the Work. 1. Contractor will start the Work on the date on which the Agreement is executed and delivered or on such other date, if any, as may be specified in the Agreement. However, at the time of the execution and delivery of the Agreement, Owner may give Contractor a written notice to proceed, stating a different date on which it is expected that Contractor will start the Work, but such date shall not be more than _______ (number) days after the date of execution and delivery of the Agreement. A copy of the notice to proceed shall be sent to Architect. No Work shall be done prior to the date on which the Work is to start. 2. The Contract time shall commence to run on the date when the Work is to start as provided in Subparagraph H(1) of this Article 2 . 3. At least 10 days prior to submitting the first application for payment, Contractor shall submit a schedule of values as required by Article 14, Paragraph A . 3. Correlation, Interpretation, and Intent of Contract Documents A. Intent of Specifications and Drawings. It is the intent of the specifications and drawings to describe a complete project to be constructed in accordance with the Contract Documents. The Contract Documents comprise the entire Agreement between Owner and Contractor. They may be altered only by a modification. B. Conflict, Error, or Discrepancy in Contract Documents. The Contract Documents are complementary; what is called for by one is as binding as if called for by all. If Contractor finds a conflict, error, or discrepancy in the Contract Documents, he or she will call it to Architect’s attention in writing before proceeding with the Work affected by such conflict, error, or discrepancy. In resolving such conflicts, errors, and discrepancies, the Documents shall be given precedence in the following order: Agreement, specifications, drawings. Within the specifications, the order of precedence shall be as follows: addenda, special conditions, instructions to bidders, general conditions, and technical provisions. Figure dimensions on drawings shall govern over scale dimensions, and detailed drawings shall govern over general drawings. Any Work that may reasonably be inferred from the specifications or drawings as being required to produce the intended result shall be supplied whether or not such Work is specifically called for. Work, materials, or equipment described in words that so applied have a well-known technical or trade meaning shall be deemed to refer to such recognized standards. 4. Availability of Lands; Subsurface Conditions; Reference Points A. Availability of Lands. 1. Owner will furnish, as indicated in the Contract Documents and not later than the date when needed by Contractor, the lands on which the Work is to be done, rights-of-way for access to such lands, and such other lands that are designated for the use of Contractor. Easements for permanent structures or permanent changes in existing facilities will be obtained and paid for by Owner, unless otherwise specified in the Contract Documents. If Contractor believes that any delay in Owner's furnishing these lands or easements entitles him or her to an extension of the Contract time, he or she may make a claim for such extension as provided in Article 12 . Owner will provide for all additional lands and access to such lands that may be required for temporary construction facilities or storage of materials and equipment. 2. Owner will, on request, furnish to Contractor copies of all available boundary surveys and subsurface tests. B. Unforeseen Subsurface Conditions. Contractor will promptly notify Owner and Architect in writing of any subsurface or latent physical conditions at the site differing materially from those indicated in the Contract Documents. Architect will promptly investigate those conditions and advise Owner in writing if further surveys or subsurface tests are necessary. Promptly afterward, Owner will obtain the necessary additional surveys and tests and furnish copies to Architect and Contractor. If Architect finds that the results of such surveys or tests indicate subsurface or latent physical conditions differing significantly from those indicated in the Contract Documents, a change order shall be issued incorporating the necessary revisions. C. Reference Points. Owner will establish such general reference points as in its judgment will enable Contractor to proceed with the Work. Contractor will be responsible for the layout of the Work, will protect and preserve the established reference points, and will make no changes or relocations without the prior written approval of Owner. Contractor will report to Architect whenever any reference point is lost or destroyed or requires relocation because of necessary changes in grades or locations. Contractor will replace and accurately relocate all reference points so lost, destroyed, or moved. 5. Bonds and Insurance A. Performance and Payment Bonds. Contractor will furnish performance and payment bonds as security for the faithful performance and payment of all its obligations under the Contract Documents. These bonds shall be in amounts at least equal to the Contract price and in such form and with such sureties as are acceptable to Owner. Prior to execution of the Contract Documents, Owner may require Contractor to furnish such other bonds, in such form and with such sureties as Owner may require. If such bonds are required by written instructions given prior to opening of bids, the premiums shall be paid by Contractor; if subsequent to opening of bids, the premiums shall be paid by Owner. B. Contractor's Liability Insurance. Contractor will purchase and maintain such insurance as will protect it from claims under Workers' compensation laws, disability benefit laws or other similar employee benefit laws; from claims for damages because of bodily injury, occupational sickness or disease, or death of its employees and claims insured by usual personal injury liability coverage; from claims for damages because of bodily injury, sickness or disease, or death of any person other than its employees including claims insured by usual personal injury liability coverage; and from claims for injury to or destruction of tangible property, including loss of use resulting from the same -- any or all of which may arise out of or result from Contractor's operations under the Contract Documents, whether such operations be conducted by itself or by any subcontractor or anyone directly or indirectly employed by any of them or for whose acts any of them may be legally liable. This insurance shall be written for not less than any limits of liability specified in the Contract Documents or required by law, whichever is greater, and shall include Contractual liability insurance. Before starting the Work, Contractor will file with Owner and Architect certificates of such insurance, acceptable to Owner; these certificates shall contain a provision that the coverage afforded under the policies will not be cancelled or materially changed until at least _____ (number) days prior written notice has been given to Owner and Architect. C. Owner's Liability Insurance. Owner will be responsible for purchasing and maintaining its own liability insurance and, at its option, may purchase and maintain such insurance as will protect it against claims that may arise from operations under the Contract Documents. D. Property Insurance. 1. Unless otherwise provided, Owner will purchase and maintain property insurance upon the project to the full insurable value of the project. This insurance shall include the interests of Owner, Contractor, and subcontractors in the Work and shall insure against the perils of fire, extended coverage, vandalism, and malicious mischief. 2. Owner will purchase and maintain such boiler and machinery insurance as may be required by the Contract Documents or by law. This insurance shall include the interests of Owner, Contractor, and subcontractors in the Work. 3. Any insured loss under the policies of insurance required by Subparagraphs D(1) and D(2) above is to be adjusted with Owner and made payable to Owner as trustee for the insureds, as their interests may appear, subject to the requirements of any applicable mortgage clause and of subparagraph D(7) of this Article 5 . 4. Owner will file a copy of all policies with Contractor before an exposure to loss may occur. If Owner does not intend to purchase such insurance, he or she will inform Contractor in writing prior to commencement of the Work. Contractor may then obtain insurance that will protect the interests of itself and its subcontractors in the Work, and by appropriate change order, the cost of such insurance shall be charged to Owner. If Contractor is damaged by failure of Owner to purchase or maintain such insurance and so to notify Contractor, then Owner will bear reasonable costs properly attributable to such failure. 5. If Contractor requests in writing that other special insurance be included in the property insurance policy, Owner will, if possible, include such insurance, and the cost of such insurance shall be charged to Contractor by appropriate change order. 6. Owner and Contractor waive all rights against each other for damages caused by fire or other perils to the extent covered by insurance provided under subparagraphs D(1) through D(7), inclusive, of this Article 5 , except such rights as they may have to the proceeds of such insurance held by Owner as trustee. Contractor shall require similar waivers by subcontractors in accordance with Article 6, Subparagraph D(5) . 7. Owner as trustee will have power to adjust and settle any loss with the insurers unless one of the parties in interest shall object in writing within five days after the occurrence of loss to Owner's exercise of this power, and if such objection be made, arbitrators shall be chosen as provided in Article XVI . Owner as trustee will, in that case, make settlement with the insurers in accordance with the directions of such arbitrators. If distribution of the insurance proceeds by arbitration is required, the arbitrators will direct such distribution. 6. Contractor’s Responsibilities A. Supervision and Superintendence. 1. Contractor will supervise and direct the Work efficiently and with its best skill and attention. Contractor will be solely responsible for the means, methods, techniques, sequences, and procedures of construction. Contractor will be responsible to see that the finished Work complies accurately with the Contract Documents. 2. Contractor will keep on the Work at all times during its progress a competent resident superintendent, who shall not be replaced without written notice to Owner and Architect except under extraordinary circumstances. The superintendent will be Contractor's representative at the site and shall have authority to act on behalf of Contractor. All communications given to the superintendent shall be as binding as if given to Contractor. B. Labor, Materials, and Equipment. 1. Contractor will provide competent, suitably qualified personnel to survey and lay out the Work and perform construction as required by the Contract Documents. Contractor will at all times maintain good discipline and order at the site. 2. Contractor will furnish all materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, and sanitary facilities and all other facilities and incidentals necessary for the execution, testing, initial operation, and completion of the Work. 3. All materials and equipment will be new, except as otherwise provided in the Contract Documents. If required by Architect, Contractor will furnish satisfactory evidence as to the kind and quality of materials and equipment. 4. All materials and equipment shall be applied, installed, connected, erected, used, cleaned, and conditioned in accordance with the instructions of the applicable manufacturer, fabricator, or processors, except as otherwise provided in the Contract Documents. C. Substitute Materials or Equipment. If it is indicated in the specifications that Contractor may furnish or use a substitute that is equal to any material or equipment specified, and if Contractor wishes to furnish or use a proposed substitute, Contractor will, promptly after the award of the Contract, make written application to Architect for approval of such a substitute certifying in writing that the proposed substitute will perform adequately the duties imposed by the general design, be similar and of equal substance to that specified, and be suited to the same use and capable of performing the same function as that specified. No substitute shall be ordered or installed without the written approval of Architect who shall be the judge of equality. D. Concerning Subcontractors. 1. Contractor will not employ any subcontractor, other person, or organization of the types referred to in Article 2, Subparagraph F(1) (whether initially or as a substitute) against whom Owner or Architect may have reasonable objection, nor will Contractor be required to employ any subcontractor against whom it has reasonable objection. Contractor will not make any substitution for any subcontractor who has been accepted by Owner and Architect, unless Architect determines that there is good cause for doing so. 2. Contractor will be fully responsible for all acts and omissions of his or her subcontractors and of persons directly or indirectly employed by them and of persons for whose acts any of them may be liable to the same extent that Contractor is responsible for the acts and omissions of persons directly employed by him or her. Nothing in the Contract Documents shall create any Contractual relationship between any subcontractor and Owner or Architect or any obligation on the part of the Owner or Architect to pay or to see to the payment of any moneys due any subcontractor, except as may otherwise be required by law. Owner or Architect may furnish to any subcontractor, to the extent practicable, evidence of amounts paid to Contractor on account of specific Work done in accordance with the schedule of values. 3. The divisions and sections of the specifications and the identifications of any drawings shall not control Contractor in dividing the Work among subcontractors or delineating the Work to be performed by any specific trade. 4. Contractor agrees to bind specifically every subcontractor to the applicable terms and conditions of the Contract Documents for the benefit of Owner. 5. All Work performed for Contractor by a subcontractor shall be pursuant to an appropriate Agreement between Contractor and the subcontractor that shall contain provisions that waive all rights the Contracting parties may have against one another for damages caused by fire or other perils covered by insurance provided in accordance with Article 5 , Subparagraphs D(1) through D(7), inclusive, except such rights as they may have to the proceeds of such insurance held by Owner as trustee under Article 5 , Subparagraph D(5). Contractor will pay each subcontractor a just share of any insurance moneys received by Contractor under Article 5 , subparagraph D(1) through D(7), inclusive. E. Patent Fees and Royalties. Contractor will pay all license fees and royalties and assume all costs incident to the use of any invention, design, process, or device that is the subject of patent rights or copyrights held by others. Contractor will indemnify and hold harmless Owner and Architect and anyone directly or indirectly employed by either of them from and against any and all claims, damages, losses, and expenses (including attorneys' fees) arising out of any infringement of such rights during or after completion of the Work, and shall defend all such claims in connection with any alleged infringement of such rights. F. Permits. Contractor will secure and pay for all construction permits and licenses and will pay all governmental charges and inspection fees necessary for the prosecution of the Work that are applicable at the time of his or her bid. Contractor will also pay all public utility charges. G. Laws and Regulations. Contractor will give all notices and comply with all laws, ordinances, rules, and regulations applicable to the Work. If Contractor observes that the specifications or drawings are at variance with any such ordinances, rules, and/or regulations, he or she will give Architect prompt written notice of any such variance, and any necessary changes shall be adjusted by an appropriate modification. If Contractor performs any Work knowing it to be contrary to such laws, ordinances, rules, and regulations, and without such notice to Architect, it will bear all costs arising from the same; however, it shall not be Contractor's primary responsibility to make certain that the drawings and specifications are in accordance with such laws, ordinances, rules, and regulations. H. Taxes. Contractor will pay all sales, consumer, use, and other similar taxes required by the law of the place where the Work is to be performed. I. Use of Premises. 1. Contractor will confine its equipment, the storage of materials and equipment, and the operations of his or her Workers to areas permitted by law, ordinances, permits, or the requirements of the Contract Documents and shall not unreasonably encumber the premises with materials or equipment. 2. Contractor will not load nor permit any part of the structure to be loaded with weights that will endanger the structure, nor will Contractor subject any part of the Work to stresses or pressures that will endanger it. J. Record Drawings. Contractor will keep one record copy of all specifications, drawings, addenda, modifications, and shop drawings at the site in good order and annotated to show all changes made during the construction process. These shall be available to Architect and shall be delivered to it for Owner upon completion of the project. K. Safety and Protection. 1. Contractor will be responsible for initiating, maintaining, and supervising all safety precautions and programs in connection with the Work. Contractor will take all necessary precautions for the safety of, and will provide the necessary protection to prevent damage, injury, or loss to: a. All employees on the Work and other persons who may be affected by the Work; b. All the Work and all materials or equipment to be incorporated in the Work, whether in storage on or off the site; and c. Other property at the site or adjacent to the site, including trees, shrubs, lawns, walks, pavements, roadways, structures, and utilities not designated for removal, relocation, or replacement in the course of construction. Contractor will comply with all applicable laws, ordinances, rules, regulations, and orders of any public body having jurisdiction for the safety of persons or property or to protect them from damage, injury, or loss. Contractor will erect and maintain, as required by the conditions and progress of the Work, all necessary safeguards for safety and protection, and in addition he or she will comply with all applicable recommendations of the Manual of Accident Prevention in Construction of the Associated General Contractors of America, Inc. Contractor will notify Owners of adjacent utilities when prosecution of the Work may affect them. All damage, injury, or loss to any property referred to in Subparagraph K(1)(b) or K(1)(c) of this Article 6 caused, directly or indirectly, in whole or in part, by Contractor, any subcontractor, or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, will be remedied by Contractor; except damage or loss attributable to the fault of drawings or specifications or to the acts or omissions of Owner or Architect or anyone employed by either of them or anyone for whose acts either of them may be liable and not attributable, directly or indirectly, in whole or in part, to the fault or negligence of Contractor. 2. Contractor will designate a responsible member of its organization at the site whose duty shall be the prevention of accidents. This person shall be Contractor's superintendent unless otherwise designated in writing by Contractor to Owner. L. Emergencies. In emergencies affecting the safety of persons or the Work or property at the site or adjacent to the site, Contractor, without special instruction or authorization from Architect or Owner, is obligated to act, at its discretion, to prevent threatened damage, injury, or loss. Contractor will give Architect prompt written notice of any significant changes in the Work or deviations from the Contract Documents caused by the same, and a change order shall be issued covering the changes and deviations involved. If Contractor believes that additional Work done by it in an emergency that arose from causes beyond its control entitles it to an increase in the Contract price or an extension of the Contract time, Contractor may make a claim for such increase as provided in Articles 11 and 12 . M. Shop Drawings and Samples. 1. After checking and verifying all field measurements, Contractor will submit to Architect for approval, in accordance with the accepted schedule of shop drawing submissions (see Article 2 , Subparagraph F(1)) _______ (number) copies (or at Architect’s option, one reproducible copy) of all shop drawings, which shall have been checked by and stamped with the approval of Contractor and identified as Architect may require. The data shown on the shop drawings will be complete with respect to dimensions, design criteria, materials of construction, and the like to enable Architect to review the information as required. 2. Contractor will also submit to Architect for approval, with such promptness as to cause no delay in Work, all samples required by the Contract Documents. All samples will have been checked by and stamped with the approval of Contractor, identified clearly as to material, manufacturer, any pertinent catalog numbers, and the use for which intended. 3. At the time of each submission, Contractor will in writing call Architect’s attention to any deviations that the shop drawing or sample may have from the requirements of the Contract Documents. 4. Architect will review and approve with reasonable promptness shop drawings and samples, but its and approval shall be only for conformance with the design concept of the project and for compliance with the information given in the Contract Documents. The approval of a separate item as such will not indicate approval of the assembly in which the item functions. Contractor will make any corrections required by Architect and will return the required number of corrected copies of shop drawings and resubmit new samples until approved. Contractor shall direct specific attention in writing or on resubmitted shop drawings to revisions other than the corrections called for by Architect on previous submissions. Contractor's stamp of approval on any shop drawing or sample shall constitute a representation to Owner and Architect that Contractor has either determined and verified all quantities, dimensions, field construction criteria, materials, catalogue numbers, and similar data or it assumes full responsibility for doing so, and that it has reviewed or coordinated each shop drawing or sample with the requirements of the Work and the Contract Documents. 5. No Work requiring a shop drawing or sample submission shall be commenced until the submission has been approved by Architect. A copy of each approved shop drawing and each approved sample shall be kept in good order by Contractor at the site and shall be available to Architect. 6. Architect’s approval of shop drawings or samples shall not relieve Contractor from responsibility for any deviations from the requirements of the Contract Documents unless Contractor has in writing called Architect’s attention to such deviation at the time of submission and Architect has given written approval to the specific deviation, nor shall any approval by Architect relieve Contractor from responsibility for errors or omissions in the shop drawings. N. Cleaning Up. Contractor will keep the premises free from accumulations of waste materials, rubbish, and other debris resulting from the Work, and at the completion of the Work, Contractor will remove all waste materials, rubbish, and debris from and about the premises as well as all tools, construction equipment and machinery, and surplus materials and will leave the site clean and ready for occupancy by Owner. Contractor will restore to their original condition those portions of the site not designated for alteration by the Contract Documents. O. Indemnification. 1. Contractor will indemnify and hold harmless Owner and Architect and their agents and employees from and against any and all claims, damages, losses, and expenses including attorneys' fees arising out of or resulting from the performance of the Work, provided that any such claim, damage, loss, or expense: (1) is attributable to bodily injury, sickness, disease, or death, or to injury to or destruction of tangible property (other than the Work itself) including the loss of use resulting from the same; and (2) is caused in whole or in part by any negligent act or omission of Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified under these general conditions. 2. In any and all claims against Owner or Architect or any of their agents or employees by any employee of Contractor, any subcontractor, anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, the indemnification obligation under Subparagraph O(1) above shall not be limited in any way by any limitation on the amount or type of damages, compensation, or benefits payable by or for Contractor or any subcontractor under workers' compensation acts, disability benefit acts, or other employee benefit acts. 3. The obligations of Contractor under Subparagraph O(1) of this Article 6 shall not extend to the liability of Architect, its agents or employees arising out of: (a) the preparation or approval of maps, drawings, opinions, reports, surveys, change orders, designs, or specifications; or (b) the giving of or the failure to give directions or instructions by Architect, its agents or employees, provided such giving or failure to give is the primary cause of injury or damage. 7. Work by Others A. Owner's Work. Owner may perform additional work related to the project by itself, or it may let other direct Contracts for such Work that shall contain general conditions similar to these. Contractor will afford the other Contractors who are parties to such direct Contracts (or Owner, if it is performing the additional Work itself), reasonable opportunity for the introduction and storage of materials and equipment and the execution of Work, and shall properly connect and coordinate its Work with that of such other Contractors (or Owner). B. Contractor's Inspection. If any part of Contractor's Work depends for proper execution or results upon the Work of any such other Contractor (or Owner), Contractor will inspect and promptly report to Architect in writing any defects or deficiencies in such Work that render it unsuitable for such proper execution and results. Contractor's failure so to report shall constitute an acceptance of the other Work as fit and proper for the relationship of its Work except as to defects and deficiencies that may appear in the other Work after the execution of its Work. C. Contractor's Cutting, Fitting, and Patching. Contractor will do all cutting, fitting, and patching of its Work that may be required to make its several parts come together properly and fit it to receive or be received by such other Work. Contractor will not endanger any Work of others by cutting, excavating, or otherwise altering their Work and will only cut or alter their Work with the written consent of Architect. D. Notice of Additional Work. If the performance of additional Work by other Contractors or Owner is not noted in the Contract Documents prior to the execution of the Contract, written notice of such additional Work shall be given to Contractor prior to starting any such additional Work. If Contractor believes that the performance of such additional Work by Owner or others involves it in additional expense or entitles it to an extension of the Contract time, Contractor may make a claim for such additional expense or extension of the Contract time as provided in Articles 11 and 12 . 8. Owner’s Responsibilities A. Communications to Contractor. Owner will issue all communications to Contractor through Architect. B. Replacement of Architect. In case of termination of the employment of Architect, Owner will appoint an Architect against whom Contractor makes no unreasonable objection, whose status under the Contract Documents shall be that of the former Architect. Any dispute in connection with such appointment shall be subject to arbitration. C. Furnishing Data. Owner will furnish the data required of it under the Contract Documents promptly and shall make payments to Contractor promptly after they are due as provided in Article 13 , Subparagraph D(1). D. Land and Reference Points. Owner's duties in respect of providing lands, boundary surveys, and the like are set forth in Article 4 , Paragraph A, and its duty to establish reference points is set forth in Article 4 , Paragraph C. E. Liability and Property Insurance. Owner's responsibilities in respect of liability and property insurance are set forth in Article 5 , Paragraphs C and D. F. Change Orders. In addition to its rights to request changes in the Work in accordance with Article 10 , Owner (especially in certain instances as provided in Article 10, Paragraph D ) will be obligated to execute change orders. G. Stopping or Suspending Work. In connection with Owner's right to stop Work or suspend Work, see Article 13 , Paragraph E and Article 15 , Paragraph A. Article 15 , Subparagraph B(1) deals with Owner's right to terminate services of Contractor under certain circumstances. 9. Architect’s Status During Construction A. Owner's Representative. Architect shall be Owner's representative during the construction period. The duties and responsibilities and the limitations of authority of Architect as Owner's representative during construction are set forth in Articles 1 through 17 of these general conditions and shall not be extended without written consent of Owner and Architect. B. Visits to Site. Architect will make periodic visits to the site to observe the progress and quality of the executed Work and to determine, in general, if the Work is proceeding in accordance with the Contract Documents. It will not be required to make exhaustive or continuous on-site inspections to check the quality or quantity of the Work. Its efforts will be directed toward providing assurance for Owner that the completed project will conform to the requirements of the Contract Documents. On the basis of its on-site observations as an experienced and qualified design professional, it will keep Owner informed of the progress of the Work and will endeavor to guard Owner against defects and deficiencies in the Work of Contractors. C. Clarifications and Interpretations . Architect will issue with reasonable promptness such written clarifications or interpretations of the Contract Documents (in the form of drawings or otherwise) as it may determine necessary, that shall be consistent with or reasonably inferable from the overall intent of the Contract Documents. If Contractor believes that a written clarification and interpretation entitles it to an increase in the Contract price, Contractor may make a claim for such increase as provided in Article 11 . D. Rejecting Defective Work. Architect will have authority to disapprove or reject Work that is defective (which term is used below to describe Work that is unsatisfactory, faulty, or defective, or does not conform to the requirements of the Contract Documents or does not meet the requirements of any inspection, test, or approval referred to in Article 13 , Subparagraph B(1)). Architect will also have authority to require special inspection or testing of the Work as provided in Article 13 , Subparagraph D(1), whether or not the Work is fabricated, installed, or completed. E. Shop Drawings, Change Orders and Payments. 1. In connection with Architect’s responsibility as to shop drawings and samples, see Article 6 , subparagraphs M(1) through M(6), inclusive. 2. In connection with Architect’s responsibility for change orders, see Articles 10, 11, and 12. 3. In connection with Architect’s responsibilities in respect of applications for payment, and the like, see Article 14 . F. Resident Project Representative. If Owner and Architect agree, Architect will furnish a fulltime resident project representative and assistants to assist Architect in carrying out its responsibilities at the site. The duties, responsibilities, and limitations of authority of any such resident project representative and assistants shall be as set forth in an exhibit to be incorporated in the Contract Documents. G. Decisions on Disagreements. 1. Architect will be the initial interpreter of the terms and conditions of the Contract Documents and the judge of the performance under those terms and conditions. In its capacity as interpreter and judge it will exercise its best efforts to insure faithful performance by both Owner and Contractor. Architect will not show partiality to either and shall not be liable for the result of any interpretation or decision rendered in good faith. Claims, disputes, and other matters relating to the execution and progress of the Work or the interpretation of or performance under the Contract Documents shall be referred initially to Architect for decision, which it shall render in writing within a reasonable time. 2. Either Owner or Contractor may demand arbitration with respect to any such claim, dispute, or other matter that has been referred to Architect, except any that have been waived by the making or acceptance of final payment as provided in Article 14 , Paragraph K, such arbitration to be in accordance with Article 16 . However, no demand for arbitration of any such claim, dispute, or other matter shall be made until the earlier of: (a) the date on which Architect has rendered its decision; or (b) the ___ day after the parties have presented their evidence to Architect if it has not rendered a written decision before that date. No demand for arbitration shall be made later than _____days after the date on which Architect rendered its written decision in respect of the claim, dispute, or other matter as to which arbitration is sought; and the failure to demand arbitration within such ______ (number) -day period shall result in Architect’s decision being final and binding upon Owner and Contractor. If Architect renders a decision after arbitration proceedings have been initiated, such decision may be entered as evidence but shall not supersede the arbitration proceedings, except where the decision is acceptable to the parties concerned. H. Limitations on Architect’s Responsibilities. 1. Neither Architect’s authority to act under this Article 9 nor any decision made by it in good faith either to exercise or not exercise such authority shall give rise to any duty or responsibility of the Architect to Contractor, any subcontractor, any of their agents or employees, or any other person performing any of the Work. 2. Architect will not be responsible for the construction means, methods, techniques, sequences, or procedures, or the safety precautions and programs incident to the same, and it will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. 3. Architect will not be responsible for the acts or omissions of Contractor, or any subcontractors, or any of its or their agents or employees, or any other persons performing any of the Work. 10. Changes in the Work A. Owner's Change Orders. Without invalidating the Agreement, Owner may, at any time or from time to time, order additions, deletions, or revisions in the Work; these will be authorized by change orders. Upon receipt of a change order, Contractor will proceed with the Work involved. All such Work shall be executed under the applicable conditions of the Contract Documents. If any change order causes an increase or decrease in the Contract price or an extension or shortening of the Contract time, an equitable adjustment will be made as provided in Article 11 and 12 . B. Architect’s Field Orders. Architect may authorize minor changes or alterations in the Work not involving extra cost and not inconsistent with the overall intent of the Contract Documents. These may be accomplished by a field order. If Contractor believes that any minor change or alteration authorized by Architect entitles him or her to an increase in the Contract price, it may make a claim for such an increase as provided in Article 11 . C. Unauthorized Additional Work. Additional Work performed by Contractor without authorization of a change order will not entitle it to an increase in the Contract price or an extension of the Contract time, except in the case of an emergency as provided in Article 6 , Paragraph L and except as provided in Article 10 , Paragraph B, Article 13 , Subparagraph B(1), and Article 13 , Subparagraph D(2). D. Execution of Change Orders. Owner will execute appropriate change orders prepared by Architect covering changes in the Work to be performed as provided in Article 4 , Paragraph B, and Work performed in an emergency as provided in Article 6 , Paragraph L, and any other claim of Contractor for a change in the Contract time or the Contract price that is approved by Architect. E. Notification of Contractor's Surety. It is Contractor's responsibility to notify its surety of any changes affecting the general scope of the Work or change in the Contract price and the amount of the applicable bonds shall be adjusted accordingly. Contractor will furnish proof of such adjustment to Owner. 11. Change of Contract Price A. Total Compensation. The Contract price constitutes the total compensation payable to Contractor for performing the Work. All duties, responsibilities, and obligations assigned to or undertaken by Contractor shall be at its expense without change in the Contract price. B. Necessity of Change Order. The Contract price may only be changed by a change order. Any claim for an increase in the Contract price, shall be in writing delivered to Owner and Architect within _______ (number) days of the occurrence of the event giving rise to the claim. All claims for adjustments in the Contract price shall be determined by Architect if Owner and Contractor cannot otherwise agree on the amount involved. Any change in the Contract price resulting from any such claim shall be incorporated in a change order. C. Determination of Value of Change Order Work. The value of any Work covered by a change order or of any claim for an increase or decrease in the Contract price shall be determined in one of the following ways: 1. Where the Work involved is covered by unit prices contained in the Contract Documents, by application of unit prices to the quantities of the items involved. 2. By mutual acceptance of a lump sum. 3. By cost and a mutually acceptable fixed amount for overhead and profit. 4. If none of the above methods is agreed on, the value shall be determined by Architect on the basis of costs and a percentage for overhead and profit. Costs shall only include labor (payroll, payroll taxes, fringe benefits, Workers' compensation, etc.), materials, equipment, and other incidentals directly related to the Work involved. The maximum percentage that shall be allowed for Contractor's combined overhead and profit, shall be as follows: a. For all such Work done by Contractor's own organization, Contractor may add up to 10 percent of its actual net increase in cost, and b. for all such Work done by subcontractors, each subcontractor may add up to 10 percent of its actual net increase in costs for combined overhead and profit and Contractor may add up to five percent of the subcontractor's total for its combined overhead and profit, provided that no overhead or profit shall be allowed on costs incurred in connection with premiums for public liability insurance or other special insurance directly related to such Work. In such case and also under Article 11 , Subparagraph C(3), Contractor will submit in form prescribed by Architect an itemized cost breakdown together with supporting data. D. Amount of Credit to Owner . The amount of credit to be allowed by Contractor to Owner for any such change that results in a net decrease in cost, will be the amount of the actual net decrease as determined by Architect. When both additions and credits are involved in any one change, the combined overhead and profit shall be figured on the basis of the net increase, if any. E. Allowances . It is understood that Contractor has included in the Contract price all allowances so named in the Contract Documents and shall cause the Work so covered to be done by such Workers, suppliers, or subcontractors and for such sums within the limit of the allowances as Architect may approve. Upon final payment, the Contract price shall be adjusted as required and an appropriate change order issued. Contractor agrees that the original Contract price includes such sums as he or she deems proper for costs and profit on account of cash allowances. No demand for additional cost or profit in connection with the same will be allowed. 12. Change of the Contract Time A. Necessity of Change Order. The Contract time may only be changed by a change order. Any claim for an extension in the Contract time shall be in writing delivered to Owner and Architect within ______ (number) days of the occurrence of the event giving rise to the claim. All claims for adjustment in the Contract time shall be determined by Architect if Owner and Contractor cannot otherwise agree. Any change in the Contract time resulting from any such claim shall be incorporated in a change order. B. Delays Beyond Contractor's Control. The Contract time will be extended in an amount equal to time lost due to delays beyond the control of Contractor if it makes a claim for such extension(s) as provided in Article 12 , Subparagraph A(1). Such delays shall include, but not be restricted to, acts or neglect by any separate Contractor employed by Owner, fires, floods, labor disputes, epidemics, abnormal weather conditions, or acts of God. C. Time of the Essence. All time limits stated in the Contract Documents are of the essence of the Agreement. D. Damages. The provisions of Article 12 shall not exclude recovery for damages (including compensation for additional professional services) for delay by either party. 13. Warranty and Guarantee; Tests and Inspections; Correction, Removal, or Acceptance of Defective Work A. Warranty and Guarantee. Contractor warrants and guarantees to the Owner and Architect that all materials and equipment will be new unless otherwise specified and that all Work will be of good quality and free from faults or defects and in accordance with the requirements of the Contract Documents and of any inspections, tests, or approvals referred to in Subparagraph B(1) below. All unsatisfactory Work, all faulty or defective Work, and all Work not conforming to the requirements of the Contract Documents or of such inspections, tests, or approvals shall be considered defective. Prompt notice of all defects shall be given to Contractor. All defective Work, whether or not in place, may be rejected, corrected, or accepted as provided in this Article 13 . B. Tests and Inspections. 1. If the Contract Documents, laws, ordinances, rules, regulations, or orders of any public authority having jurisdiction require any Work to specifically be inspected, tested, or approved by someone other than Contractor, Contractor will give Architect timely notice of readiness for such inspection, testing, or approval. Contractor will furnish Architect the required certificates of inspection, testing, or approval. All such tests will be in accordance with the methods prescribed by the American Society for Testing and Materials or such other applicable organization as may be required by law or the Contract Documents. If any such Work required so to be inspected, tested, or approved is covered without written approval of Architect, it must, if requested by Architect, be uncovered for observation at Contractor's expense. The cost of all such inspections, tests, and approvals shall be borne by Contractor unless otherwise provided. 2. Neither observations by Architect nor inspections, tests, or approvals by persons other than Contractor shall relieve Contractor from its obligations to perform the Work in accordance with the requirements of the Contract Documents. C. Access to the Work . Architect and its representatives and other representatives of Owner will at all times have access to the Work. Contractor will provide proper facilities for such access and observation of the Work and also for any inspection or testing of the Work by others. D. Uncovering Work. 1. If any Work is covered contrary to the written request of Architect, it must, if requested by Architect be uncovered for its observation and replaced at Contractor's expense. 2. If any Work has been covered that Architect has not specifically requested to observe prior to its being covered, or if Architect considers it necessary or advisable that covered Work be inspected or tested by others, Contractor, at Architect's request, will uncover, expose, or otherwise make available for observation, inspection, or testing as Architect may require, that portion of the Work in question, furnishing all necessary labor, material, and equipment. If it is found that such Work is defective, Contractor will bear all the expenses of such uncovering, exposure, observation, inspection, and testing and of satisfactory reconstruction, including compensation for additional professional services, and an appropriate deductive change order shall be issued. If, however, such Work is not found to be defective, Contractor will be allowed an increase in the Contract price or an extension of the Contract time, or both, directly attributable to such uncovering, exposure, observation, inspection, testing, and reconstruction if its makes a claim for such an increase or extension as provided in Articles 11 and 12 . E. When Owner May Stop Work. If the Work is defective, or Contractor fails to supply sufficient skilled Workers or suitable materials or equipment, or if Contractor fails to make prompt payments to subcontractors or for labor, materials, or equipment, Owner may order Contractor to stop the Work, or any portion of the Work, until the cause for such order has been eliminated; however, this right of Owner to stop the Work shall not give rise to any duty on the part of Owner to exercise this right for the benefit of Contractor or any other party. F. Correction or Removal of Defective Work. If required by Architect prior to approval of final payment, Contractor will promptly, without cost to Owner and as specified by Architect, either correct any defective Work, whether or not fabricated, installed, or completed, or, if the Work has been rejected by Architect, remove it from the site and replace it with non-defective Work. If Contractor does not correct such defective Work or remove and replace such rejected Work within a reasonable time, all as specified in a written notice from Architect, Owner may have the deficiency corrected or the rejected Work removed and replaced. All direct or indirect costs of such correction or removal and replacement, including compensation for additional professional services, shall be paid by Contractor, and an appropriate deductive change order shall be issued. Contractor will also bear the expenses of making good all Work of others destroyed or damaged by its correction, removal, or replacement of its defective Work. G. Correction Period for Defective Work. If, after the approval of final payment and prior to the expiration of one year after the date of substantial completion or such longer period of time as may be prescribed by law or by the terms of any applicable special guarantee required by the Contract Documents any Work is found to be defective, Contractor will promptly without cost to Owner and in accordance with Owner's written instructions, either correct such defective Work, or, if it has been rejected by Owner, remove it from the site and replace it with non-defective Work. If Contractor does not promptly comply with the terms of such instructions, Owner may have the defective Work corrected or the rejected Work removed and replaced, and all direct and indirect costs of such removal and replacement, including compensation for additional professional services, will be paid by Contractor. H. Acceptance of Defective Work. If, instead of requiring correction or removal and replacement of defective Work, Owner (and, prior to approval of final payment, also Architect prefers to accept such Work, it may do so. In such case, if acceptance occurs prior to approval of final payment, a change order shall be issued incorporating the necessary revisions in the Contract Documents, including appropriate reduction in the Contract price; or, if the acceptance occurs after approval of final payment, an appropriate amount shall be paid by Contractor to Owner. I. Neglected Work by Contractor . If Contractor should neglect to prosecute the Work in accordance with the Contract Documents, including any requirements of the progress schedule, Owner, after _______ (number) days' written notice to Contractor may, without prejudice to any other remedy it may have, make good such deficiencies and the cost for making good such deficiencies (including compensation for additional professional services) shall be charged against Contractor if Architect approves such action, in which case a change order shall be issued incorporating the necessary revisions in the Contract Documents including an appropriate reduction in the Contract price. If the payments then or later due Contractor are not sufficient to cover such amount, Contractor will pay the difference to Owner. 14. Payments and Completion A. Schedule of Values. At least ______ (number) days prior to submitting the first application for a progress payment, Contractor will submit a schedule of values of the Work including quantities and unit prices, aggregating the Contract price. This schedule shall be satisfactory in form and substance to Architect and shall subdivide the Work into component parts in sufficient detail to serve as the basis for progress payments during construction. Upon approval of the schedule of values by Architect, such schedule shall be incorporated into the form of application for payment furnished by Architect. B. Applications for Progress Payment. At least ______ (number) days before each progress payment falls due (but not more often than once a month), Contractor will submit to Architect for review the application for payment filled out and signed by Contractor covering the Work completed as of the date of the application and supported by such data as Architect may reasonably require. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the site or at another location agreed to in writing, the application for payment shall also be accompanied by such supporting data, satisfactory to Owner, as will establish Owner's title to the material and equipment and protect its interest in such material and equipment, including applicable insurance. C. Contractor's Warranty of Title . Contractor warrants and guarantees that title to all Work, materials, and equipment covered by an application for payment, whether incorporated in the project or not, will have passed to Owner prior to the making of the application for payment, free and clear of all liens, claims, security interests, and encumbrances (referred to below in these general conditions as liens ); and that no Work, materials, or equipment covered by an application for payment will have been acquired by Contractor or by any other person performing the Work at the site or furnishing materials and equipment for the project, subject to an Agreement under which an interest in or encumbrance on such Work, materials, or equipment is retained by the seller or otherwise imposed by Contractor or such other person. D. Approval of Payments. 1. Architect will, within _____ (number) days after receipt of each application for payment, either indicate in writing its approval of payment and present the application to Owner, or return the application to Contractor indicating in writing its reasons for refusing to approve payment. In the latter case, Contractor may make the necessary corrections and resubmit the application. Owner will, within ______ (number) days of presentation to it of an approved application for payment, pay Contractor the amount approved by Architect. 2. Architect’s approval of any payment requested in an application for payment shall constitute a representation by it to Owner, based on Architect on-site observations of the Work in progress as an experienced and qualified design professional and on its review of the application for payment and the supporting data, that the Work has progressed to the point indicated; that, to the best of its knowledge, information, and belief, the quality of the Work is in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning project upon substantial completion, to the results of any subsequent tests called for in the Contract Documents and any qualifications stated in its approval); and that Contractor is entitled to payment of the amount approved. However, by approving any such payment Architect shall not be deemed to have represented that it made exhaustive or continuous on-site inspections to check the quality or the quantity of the Work, or that it has reviewed the means, methods, techniques, sequences, and procedures of construction, or that it has made any examination to ascertain how or for what purpose Contractor has used the mone

Valuable tips on setting up your ‘Contract Of Building’ online

Are you fed up with the inconvenience of handling paperwork? Look no further than airSlate SignNow, the premier eSignature solution for individuals and businesses. Bid farewell to the monotonous routine of printing and scanning documents. With airSlate SignNow, you can effortlessly fill out and sign documents online. Utilize the extensive features included in this user-friendly and economical platform and transform your method of paperwork management. Whether you need to sign documents or collect signatures, airSlate SignNow manages it all effortlessly, requiring just a few clicks.

Follow this detailed guide:

  1. Access your account or register for a complimentary trial with our service.
  2. Select +Create to upload a document from your device, cloud storage, or our form library.
  3. Open your ‘Contract Of Building’ in the editor.
  4. Click Me (Fill Out Now) to complete the form on your end.
  5. Add and assign fillable fields for other individuals (if necessary).
  6. Continue with the Send Invite settings to solicit eSignatures from others.
  7. Save, print your version, or turn it into a reusable template.

Don’t be concerned if you need to collaborate with your team on your Contract Of Building or send it for notarization—our platform provides everything you need to achieve those goals. Register with airSlate SignNow today and take your document management to unprecedented levels!

Here is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.

Need help? Contact Support

The best way to complete and sign your contract of building form

Save time on document management with airSlate SignNow and get your contract of building form eSigned quickly from anywhere with our fully compliant eSignature tool.

How to Sign a PDF Online How to Sign a PDF Online

How to complete and sign paperwork online

Previously, coping with paperwork took pretty much time and effort. But with airSlate SignNow, document management is easy and fast. Our robust and user-friendly eSignature solution enables you to easily fill out and eSign your contract of building form online from any internet-connected device.

Follow the step-by-step guide to eSign your contract of building form template online:

  • 1.Register for a free trial with airSlate SignNow or log in to your account with password credentials or SSO authentication.
  • 2.Click Upload or Create and import a file for eSigning from your device, the cloud, or our form collection.
  • 3.Click on the document name to open it in the editor and use the left-side menu to fill out all the blank areas accordingly.
  • 4.Place the My Signature field where you need to approve your sample. Type your name, draw, or upload a picture of your handwritten signature.
  • 5.Click Save and Close to finish editing your completed document.

After your contract of building form template is ready, download it to your device, export it to the cloud, or invite other individuals to electronically sign it. With airSlate SignNow, the eSigning process only takes a few clicks. Use our powerful eSignature solution wherever you are to deal with your paperwork productively!

How to Sign a PDF Using Google Chrome How to Sign a PDF Using Google Chrome

How to fill out and sign paperwork in Google Chrome

Completing and signing paperwork is simple with the airSlate SignNow extension for Google Chrome. Adding it to your browser is a fast and productive way to manage your forms online. Sign your contract of building form template with a legally-binding electronic signature in a few clicks without switching between tools and tabs.

Follow the step-by-step guidelines to eSign your contract of building form in Google Chrome:

  • 1.Go to the Chrome Web Store, find the airSlate SignNow extension for Chrome, and install it to your browser.
  • 2.Right-click on the link to a document you need to approve and select Open in airSlate SignNow.
  • 3.Log in to your account using your password or Google/Facebook sign-in option. If you don’t have one, sign up for a free trial.
  • 4.Use the Edit & Sign menu on the left to complete your sample, then drag and drop the My Signature field.
  • 5.Insert an image of your handwritten signature, draw it, or simply type in your full name to eSign.
  • 6.Verify all information is correct and click Save and Close to finish modifying your form.

Now, you can save your contract of building form sample to your device or cloud storage, send the copy to other people, or invite them to eSign your document with an email request or a protected Signing Link. The airSlate SignNow extension for Google Chrome enhances your document processes with minimum effort and time. Start using airSlate SignNow today!

How to Sign a PDF in Gmail How to Sign a PDF in Gmail How to Sign a PDF in Gmail

How to complete and sign forms in Gmail

When you get an email with the contract of building form for approval, there’s no need to print and scan a document or save and re-upload it to another tool. There’s a much better solution if you use Gmail. Try the airSlate SignNow add-on to rapidly eSign any paperwork right from your inbox.

Follow the step-by-step guide to eSign your contract of building form in Gmail:

  • 1.Visit the Google Workplace Marketplace and look for a airSlate SignNow add-on for Gmail.
  • 2.Install the program with a related button and grant the tool access to your Google account.
  • 3.Open an email with an attachment that needs approval and use the S symbol on the right panel to launch the add-on.
  • 4.Log in to your airSlate SignNow account. Opt for Send to Sign to forward the document to other parties for approval or click Upload to open it in the editor.
  • 5.Drop the My Signature field where you need to eSign: type, draw, or import your signature.

This eSigning process saves efforts and only requires a few clicks. Utilize the airSlate SignNow add-on for Gmail to adjust your contract of building form with fillable fields, sign paperwork legally, and invite other individuals to eSign them al without leaving your inbox. Boost your signature workflows now!

How to Sign a PDF on a Mobile Device How to Sign a PDF on a Mobile Device How to Sign a PDF on a Mobile Device

How to complete and sign documents in a mobile browser

Need to quickly complete and sign your contract of building form on a mobile phone while doing your work on the go? airSlate SignNow can help without needing to install additional software programs. Open our airSlate SignNow tool from any browser on your mobile device and create legally-binding electronic signatures on the go, 24/7.

Follow the step-by-step guide to eSign your contract of building form in a browser:

  • 1.Open any browser on your device and go to the www.signnow.com
  • 2.Create an account with a free trial or log in with your password credentials or SSO option.
  • 3.Click Upload or Create and add a file that needs to be completed from a cloud, your device, or our form library with ready-made templates.
  • 4.Open the form and fill out the empty fields with tools from Edit & Sign menu on the left.
  • 5.Put the My Signature area to the form, then type in your name, draw, or upload your signature.

In a few easy clicks, your contract of building form is completed from wherever you are. As soon as you're done with editing, you can save the document on your device, generate a reusable template for it, email it to other people, or invite them eSign it. Make your paperwork on the go fast and efficient with airSlate SignNow!

How to Sign a PDF on iPhone How to Sign a PDF on iPhone

How to complete and sign forms on iOS

In today’s business community, tasks must be accomplished quickly even when you’re away from your computer. Using the airSlate SignNow application, you can organize your paperwork and approve your contract of building form with a legally-binding eSignature right on your iPhone or iPad. Set it up on your device to conclude contracts and manage forms from anyplace 24/7.

Follow the step-by-step guidelines to eSign your contract of building form on iOS devices:

  • 1.Open the App Store, search for the airSlate SignNow app by airSlate, and install it on your device.
  • 2.Launch the application, tap Create to import a template, and choose Myself.
  • 3.Opt for Signature at the bottom toolbar and simply draw your autograph with a finger or stylus to eSign the form.
  • 4.Tap Done -> Save after signing the sample.
  • 5.Tap Save or use the Make Template option to re-use this document in the future.

This method is so simple your contract of building form is completed and signed in a couple of taps. The airSlate SignNow application works in the cloud so all the forms on your mobile device remain in your account and are available any time you need them. Use airSlate SignNow for iOS to improve your document management and eSignature workflows!

How to Sign a PDF on Android How to Sign a PDF on Android

How to complete and sign forms on Android

With airSlate SignNow, it’s easy to sign your contract of building form on the go. Set up its mobile app for Android OS on your device and start boosting eSignature workflows right on your smartphone or tablet.

Follow the step-by-step guide to eSign your contract of building form on Android:

  • 1.Navigate to Google Play, search for the airSlate SignNow application from airSlate, and install it on your device.
  • 2.Log in to your account or create it with a free trial, then upload a file with a ➕ option on the bottom of you screen.
  • 3.Tap on the uploaded file and choose Open in Editor from the dropdown menu.
  • 4.Tap on Tools tab -> Signature, then draw or type your name to electronically sign the form. Fill out blank fields with other tools on the bottom if necessary.
  • 5.Utilize the ✔ key, then tap on the Save option to end up with editing.

With an easy-to-use interface and total compliance with major eSignature requirements, the airSlate SignNow application is the best tool for signing your contract of building form. It even works without internet and updates all form changes when your internet connection is restored and the tool is synced. Complete and eSign forms, send them for eSigning, and generate multi-usable templates whenever you need and from anywhere with airSlate SignNow.

Sign up and try Contract of building form
  • Close deals faster
  • Improve productivity
  • Delight customers
  • Increase revenue
  • Save time & money
  • Reduce payment cycles