- 1 - CONCRETE CONTRACT THIS CONCRETE CONTRACT (“Contract”), effective as of the date of the last party to sign
below, is between , having an address at
("Contractor") and , having an address at
("Owner").
For valuable consideration the parties hereby agree as follows:1. SCOPE OF WORK: Contractor shall provide all labor and materials, and perform all work
necessary for the completion of the residence, structure, or improvements as described in the
drawings and specifications signed by both Owner and Contractor (“Project”) and more
particularly described as Such drawings and specifications are hereby made a part of this Contract. Drawings and
specifications shall contain a scale drawing showing the shape, size, and dimensions of the
construction and equipment together with a description of the work to be done, materials to be
used, and the equipment to be used or installed. BA SE M EN T F L O OR-
Thic k ness:
--R ein fo rc in g:
-- --F il l: S lu m p: C on cre te M ix
or P S I: V ap or B arrie r:
F in is h &
Curin g
Co m pou nd/S ea
ler: G ARAG E F L O OR-
Thic k ness:
--R ein fo rc in g:
-- --F il l: S lu m p: C on cre te M ix
or P S I: V ap or B arrie r:
F in is h &
Curin g
Co m pou nd/S ea
ler: S T O OPS O R P O RCH ES-
T hic k ness:
--R ein fo rc in g:
-- --F il l: S lu m p: C on cre te M ix
or P S I: V ap or B arrie r:
F in is h &
Curin g
Co m pou nd/S ea
ler: S ID EW ALK S
Thic k n ess:
--R ein fo rc in g:
-- --F il l: S lu m p: C on cre te M ix
or P S I: V ap or B arrie r:
F in is h &
Curin g
Co m pou nd/S ea
ler: P A TIO S-
T hic k n ess:
--R ein fo rc in g:
-- --F il l: S lu m p: C on cre te M ix
or P S I: V ap or B arrie r:
F in is h &
Curin g
Co m pou nd/S ea
ler:
- 2 - DRIV EW AY
Thic k ness:
--R ein fo rc in g:
-- --F il l: S lu m p: C on cre te M ix
or P S I: V ap or B arrie r:
F in is h &
Curin g
Co m pou nd/S ea
ler: IF R EIN FO RCIN G R EB A R- S pacin g: F O U ND ATIO N B O LTS-S pacin g: L ocatio n: E X PA N SIO N J O IN TS-T ype: L ocatio n: C O N TR O L J O IN TS-T ype: L ocatio n: 2. WORK SITE: The Project shall be constructed on the property of Owner located at and more
particularly described as (hereafter
"the Work Site"). Owner hereby authorizes Contractor to commence and complete the usual and
customary excavation and grading on the Work Site as may be required in the judgment of the
Contractor to complete the Project. Unless called for in the drawings or specifications, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before
.
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be included as part of
the Project price.5. SOIL CONDITIONS: Contractor shall have no responsibility for the condition of the soils at the
Work Site. Any excavation, filling or other work required by the Owner other than the usual and
customary excavation and grading shall be agreed to in a Change Order for an amount in addition
to the Contract Price. Contractor shall not be responsible for any damages suffered by Owner as a
result of the soil conditions at the Work Site.6.INSURANCE: Contractor shall maintain general liability, workers compensation and builder's
risk insurance.7. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
out property lines to the Contractor. If the Owner or Contractor has any doubt about the location
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that
affect the Work Site.8. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the drawings and specifications, from time to time during the construction of
the Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
- 3 - agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the
estimated cost.9. CONTRACT PRICE:{COST PLUS}Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of$ for performing the services set forth in the scope of the work. Contractor
shall be paid as follows:
.OR{FIXED FEE}Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.10.LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10)
days from the due date shall be deemed a material breach of this Contract. If payment is not made
when due, Contractor may suspend work on the job until such time as all payments due have been
made without breach of the Contract pending payment or resolution of any dispute. Owner agrees
to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the
rate of 1% per month.11. DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contractor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If the
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
either party, Contractor shall be excused from further performance under this Contract and Owner
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.12. ASSIGNMENT: Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.13.INTERPRETATION:
- 4 - (a)Interpretation of Documents. The Contract, drawings, and specifications are intended to
supplement one another. In the event of a conflict, the specifications shall control the drawings,
and the Contract shall control both. If work is displayed on the drawings but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the drawings,
Contractor shall be required to perform the work as though it were called for and displayed in both
documents.(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exists
between the parties. This Contract may only be modified only by a written agreement signed by
both parties.(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
laws of the State of Idaho.14. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing party in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.15.PERFORMANCE:(a)Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
this Contract provided Contractor shall remain fully responsible for the proper completion of the
Project. (b) All work shall be completed in a workman-like manner and in compliance with all
building codes and applicable laws. To the extent required by law, all work shall be performed by
individuals duly licensed and authorized by law to perform said work.(c)Contractor agrees to remove all debris and leave the premises in broom clean condition.
Contractor is responsible for the clean-up of any splatter caused during the pouring of the
concrete.16. WARRANTY: Contractor's warranty shall be limited to defects in workmanship within the scope
of work performed by Contractor and which arise and become known within year(s) from
the date hereof. All said defects arising after year(s) and defects in material are not
warranted by Contractor. Contractor agrees to repair any depressions exceeding inches and
cracks exceeding inch in width and inch in vertical displacement, but not including
cracks at expansion and control joint locations which may not exceed inch in width and
-- inch in vertical displacement, and patch any pitting, scaling or spalling for a period of
year(s). Contractor shall not be responsible for scaling if there is application of salt or other agents
harmful to concrete surfaces by Owner/Builder. Contractor hereby assigns to Owner all warranties
on materials as provided by the manufacturer of such materials.17. DISCLOSURES: Pursuant to Idaho Code Section 25-525, Contractor provides the necessary
disclosure of information on the final page of this document.AGREED:
- 5 - CONTRACTOR:Signature Print Name & Title Date License Number Name and Address of License HolderOWNER:Signature Print Name Date
- 6 - DISCLOSURE NOTICE TO OWNER Owner shall have the right at the reasonable expense of Owner to require that Contractor obtain lien
waivers from any subcontractors providing services or materials to Contractor.Owner shall have the right to receive from Contractor proof that Contractor has a general liability
insurance policy including completed operations in effect and proof that the Contractor has worker’s
compensation insurance for his employees as required by Idaho law.Owner shall be informed of the opportunity to purchase an extended policy of title insurance covering
certain unfiled or unrecorded liens.Owner shall have the right to require, at the Owner’s expense, a surety bond in an amount up to the value
of the construction project.Contractor shall provide to Owner a written disclosure statement, which shall be signed by Contractor
listing the business names, addresses and telephone numbers of all subcontractors, material men and
rental equipment providers having a direct contractual relationship with Contractor and who have
supplied materials or performed work on the residential property of a value in excess of five hundred
dollars ($500). Contractor is not required under this subsection to disclose subcontractors, material men or
rental equipment providers not directly hired by or directly working for Contractor. Such information
shall be provided within a reasonable time prior to the final payment to Contractor by Owner for
construction, alteration, or repair of any improvement of residential real property.Contractor shall not be liable for any error, inaccuracy or omission of any information delivered pursuant
to this section if the error, inaccuracy or omission was not within the personal knowledge of Contractor.
Useful suggestions for finishing your ‘Fill’ online
Are you fed up with the inconvenience of managing paperwork? Look no further than airSlate SignNow, the leading electronic signature service for individuals and businesses. Bid farewell to the lengthy procedure of printing and scanning documents. With airSlate SignNow, you can effortlessly complete and sign documents online. Take advantage of the robust features included in this user-friendly and affordable platform and transform your approach to document management. Whether you need to authorize forms or gather eSignatures, airSlate SignNow takes care of everything seamlessly, with just a few clicks.
Adhere to this comprehensive guide:
- Log in to your account or register for a free trial with our service.
- Click +Create to upload a file from your device, cloud storage, or our template collection.
- Open your ‘Fill’ in the editor.
- Select Me (Fill Out Now) to prepare the document on your end.
- Add and designate fillable fields for others (if necessary).
- Proceed with the Send Invite settings to solicit eSignatures from others.
- Save, print your version, or convert it into a multi-use template.
Don’t worry if you need to collaborate with others on your Fill or send it for notarization—our platform has everything you need to finalize such tasks. Register with airSlate SignNow today and enhance your document management to a higher level!