DRAINAGE CONTRACT THIS DRAINAGE CONTRACT (“Contract”), effective as of the date of the last party
to sign below, is between , having an address at ("Contractor") and , having an address at ("Owner").For valuable consideration the parties hereby agree as follows:1. SCOPE OF WORK: Drainage services may include plumbing repair work (for drains,
sinks, toilets, water cylinders, boilers, heaters and pipe lining), and fabrication and
installation of cesspools, septic tanks, storm drains and other sewage disposal and drain
structures. Drainage work may also include the evaluation of soil erosion, erosion control
and proper water run-off of a particular area or worksite. Contractor shall provide all
necessary drainage labor and materials, and perform all drainage services described
above and/or as set forth in the plans and specifications signed by both Owner and
Contractor (“Project”). Such plans and specifications are hereby made a part of this
Contract and may contain pictures, diagrams or measurements of the work area together
with a description of the work to be done, materials to be used, and the equipment to be
used or installed.2.WORK SITE: The Project shall be constructed on the property of Owner located at and more particularly described as
-
________ (hereafter "the Work Site"). Owner hereby authorizes Contractor to
commence and complete the usual and customary excavation and grading on the Work
Site as may be required in the judgment of the Contractor to complete the Project.
Unless called for in the plans or specifications, no landscaping, finish grading, filling or
excavation is to be performed at the Work Site by the Contractor.
3.TIME OF COMPLETION: Contractor shall commence the work to be performed
under this Contract on or before and shall substantially complete the work on or before . Contractor shall not be liable for any delay due to circumstances beyond its control including strikes, casualty, acts of God, illness, injury, or general unavailability of materials.4.PERMITS: Contractor shall apply for and obtain such permits and regulatory
approvals as may be required by the local municipal/county government, the cost thereof
shall be included as part of the Project price.5.SOIL CONDITIONS: Contractor shall have no responsibility for the condition of the
soils at the Work Site. Any excavation, filling or other work required by the Owner
other than the usual and customary excavation and grading shall be agreed to in a Change
Order for an amount in addition to the Contract Price. Contractor shall not be
responsible for any damages suffered by Owner as a result of the soil conditions at the
Work Site.6. INSURANCE: Contractor shall maintain general liability and workers compensation
insurance.7.SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner
will point out property lines to the Contractor. If the Owner or Contractor has any doubt
about the location of the property lines, Owner shall provide Contractor with boundary
stakes through a licensed surveyor. In addition, Owner shall provide Contractor
documentation that Owner has title to the Work Site and shall provide Contractor copies
of any covenants, conditions, or restrictions that affect the Work Site.8.CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the
work, including changes to the plans and specifications, from time to time during the
construction of the Project. However, any such change or modification shall only be
made by written "Change Order" signed by both parties. Such Change Orders shall
become part of this Contract. Owner agrees to pay any increase in the cost of the
Project as a result of a Change Order. In the event the cost of a Change Order is not
known at the time a Change Order is executed, the Contractor shall estimate the cost
thereof and Owner shall pay the actual cost whether or not it is in excess of the estimated
cost.9.CONTRACT PRICE:{COST PLUS}Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of
$ for performing the services set forth in the scope of the work.
Contractor shall be paid as follows:
.OR{FIXED FEE}Owner agrees to pay Contractor the sum of $ for performing the
services set forth in the scope of the work. Contractor shall be paid as follows:
.Contractor shall furnish Owner appropriate releases or waivers of lien for all work
performed or materials provided at the time the next periodic payment shall be due.10.LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of
ten (10) days from the due date shall be deemed a material breach of this Contract. If
payment is not made when due, Contractor may suspend work on the job until such time
as all payments due have been made without breach of the Contract pending payment or
resolution of any dispute. Owner agrees to pay a late charge of 1% of all payments that
are more than ten (10) days late plus interest at the rate of 1% per month.
11.DESTRUCTION AND DAMAGE: If the Project is destroyed or damaged for any
reason, except where such destruction or damage was caused by the sole negligence of
the Contractor or its subcontractors, Owner shall pay Contractor for any additional work
done by Contractor in rebuilding or restoring the Project to its condition prior to such
destruction or damage. If the estimated cost of replacing work already accomplished by
Contractor exceeds 20 percent of the Contract price, either the Contractor or Owner may
terminate this Contract. Upon termination by either party, Contractor shall be excused
from further performance under this Contract and Owner shall pay Contractor a
percentage of the Contract price in proportion to the amount of work accomplished prior
to the destruction or damage.12.ASSIGNMENT: Neither party may assign this Contract, or payments due under the
Contract, without the other party’s written consent. Any such assignment shall be void
and of no effect.13. INTERPRETATION:(a)Interpretation of Documents. The Contract, plans, and specifications are
intended to supplement one another. In the event of a conflict, the specifications shall
control the plans, and the Contract shall control both. If work is displayed on the plans
but not called for in the specifications, or if the work is called for in the specifications but
not displayed on the plans, Contractor shall be required to perform the work as though it
were called for and displayed in both documents.(b)Entire Agreement. This Contract constitutes the entire agreement of the parties.
No other agreements, oral or written, pertaining to the work to be performed under this
Contract exists between the parties. This Contract may only be modified by a written
agreement signed by both parties.(c) Governing Law. This Contract shall be interpreted and governed in accordance
with the laws of the State of Montana.14. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of
action against the other party arising from or relating to this Contract, the prevailing party
in such proceeding shall be entitled to recover reasonable attorney fees and court costs.15. PERFORMANCE:(a)Contractor may, at its discretion, engage licensed subcontractors to perform work
pursuant to this Contract provided Contractor shall remain fully responsible for the
proper completion of the Project. (b) All work shall be completed in a workman-like manner and in compliance with
all building codes and applicable laws. To the extent required by law, all work shall be
performed by individuals duly licensed and authorized by law to perform said work.
(c)Contractor agrees to remove all debris and leave the premises in broom clean
condition.16. WARRANTY: Contractor's warranty shall be limited to defects in workmanship
within the scope of work performed by Contractor and which arise and become known
within one (1) year from the date hereof. All said defects arising after one (1) year and
defects in material are not warranted by Contractor. Contractor hereby assigns to
Owner all warranties on materials as provided by the manufacturer of such materials.AGREED:CONTRACTOR:SignaturePrint Name & TitleDateLicense NumberName and Address of License HolderOWNER:SignaturePrint NameDate
* Optional provisions required only for retail installment contracts: Notice to the Buyer. Do not sign this contract before you read it or if it contains any blank spaces. You are entitled to
an exact copy of the contract you sign. Under the law, you have the right to pay off in advance
the full amount due and to obtain a partial refund of the finance charge. I, the Buyer, have received a completed copy of the contract.____________________________________Buyer's Signature____________________________________Buyer's Residence___________________________________Date of Acknowledgement of ReceiptThe cash price of the goods and services which are the subject matter of the sale is
____________________________. Collateral has been given as security for payment and is described as :
____________________________.The amount of the buyer's down payment is $____________. This includes an allowance given by the contractor of $_____________. The amounts paid in money is $___________. The amount paid in goods, described as ____________________________, is $___________.The unpaid cash balance is $___________.Insurance Premium Payments (if applicable):a. Type of insurance: ____________________ Term of insurance: ___________ Premium paid:
$___________ To be procured by: Buyer Contractorb. Type of insurance: ____________________ Term of insurance: ___________ Premium paid:
$___________ To be procured by: Buyer ContractorThe amount of official fees, if any, is $___________.The principal amount financed is $___________.The amount of the finance charge is $___________.
The time balance, which is the sum of the principal amount financed and finance charge, payable
by the buyer to the contractor is $___________.The number of installments required is ___________.The amount of each installment is $___________.The due date or period of each installment is ___________.The time sale price, which is the total of the cash price of the goods and services or services, the
finance charge, and the amounts, if any, included for insurance premiums and official fees, is
$___________.
Valuable tips for preparing your ‘Necessary Drainage Labor And Materials And Perform All Drainage Services Described’ online
Are you fed up with the inconvenience of handling paperwork? Look no further than airSlate SignNow, the premier eSignature solution for individuals and businesses. Bid farewell to the tedious process of printing and scanning documents. With airSlate SignNow, you can effortlessly complete and sign paperwork online. Leverage the powerful capabilities embedded in this user-friendly and cost-effective platform and transform your method of document management. Whether you need to authorize forms or collect eSignatures, airSlate SignNow manages it all with ease, requiring only a few clicks.
Follow this step-by-step guide:
- Log into your account or register for a complimentary trial with our service.
- Click +Create to upload a file from your device, cloud storage, or our template library.
- Open your ‘Necessary Drainage Labor And Materials And Perform All Drainage Services Described’ in the editor.
- Click Me (Fill Out Now) to finish the document on your end.
- Add and allocate fillable fields for others (if needed).
- Proceed with the Send Invite settings to solicit eSignatures from others.
- Save, print your copy, or convert it into a multi-usable template.
Don’t fret if you need to collaborate with others on your Necessary Drainage Labor And Materials And Perform All Drainage Services Described or send it for notarization—our solution provides you with everything required to accomplish such tasks. Sign up with airSlate SignNow today and elevate your document management to a new level!
what are the four types of drainage?
Maintenance of drainage system pdf
5 types of drainage
Drainage system in building PDF
What are the two types of drainage systems
Types of drainage system in building
Surface drainage system
Types of drainage in medical
Maintenance of drainage system pdf
What is drainage basin
Types of drainage systems
Drainage construction procedure PDF