CONSTRUCTION CONTRACT THIS CONSTRUCTION CONTRACT (“Contract”), effective as of the date of the last
party to sign below, is between , having an address at ("Contractor") and , having an address at ("Owner").For valuable consideration the parties hereby agree as follows:1. SCOPE OF WORK: Contractor shall provide all labor and materials, and perform
all work necessary for the completion of the residence, structure, or improvements as
described in the drawings and specifications signed by both Owner and Contractor
(“Project”) and more particularly described as Such drawings and specifications are hereby made a part of this Contract. Drawings
and specifications shall contain a scale drawing showing the shape, size, and
dimensions of the construction and equipment together with a description of the work
to be done, materials to be used, and the equipment to be used or installed. 2. WORK SITE: The Project shall be constructed on the property of Owner located at and more particularly described as (hereafter "the Work Site"). Owner hereby authorizes Contractor to commence and complete the usual and customary excavation and grading on the Work Site as may be required in the judgment of the Contractor to complete the Project. Unless called for in the drawings or specifications, no landscaping, finish grading, filling or excavation is to be performed at the Work Site by the Contractor.3.TIME OF COMPLETION: Contractor shall commence the work to be performed
under this Contract on or before and shall substantially complete the work on or before . Contractor shall not be liable for any delay due to circumstances beyond its control including strikes, casualty, acts of God, illness, injury, or general unavailability of materials.4.PERMITS: Contractor shall apply for and obtain such permits and regulatory
approvals as may be required by the local municipal/county government, the cost thereof
shall be included as part of the Project price.5.SOIL CONDITIONS: Contractor shall have no responsibility for the condition of the
soils at the Work Site. Any excavation, filling or other work required by the Owner
other than the usual and customary excavation and grading shall be agreed to in a Change
Order for an amount in addition to the Contract Price. Contractor shall not be
responsible for any damages suffered by Owner as a result of the soil conditions at the
Work Site.6. INSURANCE: Contractor shall maintain general liability, workers compensation and
builder's risk insurance.7. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner
will point out property lines to the Contractor. If the Owner or Contractor has any doubt
about the location of the property lines, Owner shall provide Contractor with boundary
stakes through a licensed surveyor. In addition, Owner shall provide Contractor
documentation that Owner has title to the Work Site and shall provide Contractor copies
of any covenants, conditions, or restrictions that affect the Work Site.8.CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the
work, including changes to the drawings and specifications, from time to time during the
construction of the Project. However, any such change or modification shall only be
made by written "Change Order" signed by both parties. Such Change Orders shall
become part of this Contract. Owner agrees to pay any increase in the cost of the
Project as a result of a Change Order. In the event the cost of a Change Order is not
known at the time a Change Order is executed, the Contractor shall estimate the cost
thereof and Owner shall pay the actual cost whether or not it is in excess of the estimated
cost.9.CONTRACT PRICE:{COST PLUS}Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of
$ for performing the services set forth in the scope of the work.
Contractor shall be paid as follows:
.OR{FIXED FEE}Owner agrees to pay Contractor the sum of $ for performing the
services set forth in the scope of the work. Contractor shall be paid as follows:
.Contractor shall furnish Owner appropriate releases or waivers of lien for all work
performed or materials provided at the time the next periodic payment shall be due.10.LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of
ten (10) days from the due date shall be deemed a material breach of this Contract. If
payment is not made when due, Contractor may suspend work on the job until such time
as all payments due have been made without breach of the Contract pending payment or
resolution of any dispute. Owner agrees to pay a late charge of 1% of all payments that
are more than ten (10) days late plus interest at the rate of 1% per month.11.DESTRUCTION AND DAMAGE: If the Project is destroyed or damaged for any
reason, except where such destruction or damage was caused by the sole negligence of
the Contractor or its subcontractors, Owner shall pay Contractor for any additional work
done by Contractor in rebuilding or restoring the Project to its condition prior to such
destruction or damage. If the estimated cost of replacing work already accomplished by
Contractor exceeds 20 percent of the Contract price, either the Contractor or Owner may
terminate this Contract. Upon termination by either party, Contractor shall be excused
from further performance under this Contract and Owner shall pay Contractor a
percentage of the Contract price in proportion to the amount of work accomplished prior
to the destruction or damage.12. ASSIGNMENT: Neither party may assign this Contract, or payments due under the
Contract, without the other party’s written consent. Any such assignment shall be void
and of no effect.13. INTERPRETATION:(a)Interpretation of Documents. The Contract, drawings, and specifications are
intended to supplement one another. In the event of a conflict, the specifications shall
control the drawings, and the Contract shall control both. If work is displayed on the
drawings but not called for in the specifications, or if the work is called for in the
specifications but not displayed on the drawings, Contractor shall be required to perform
the work as though it were called for and displayed in both documents.(b)Entire Agreement. This Contract constitutes the entire agreement of the parties.
No other agreements, oral or written, pertaining to the work to be performed under this
Contract exists between the parties. This Contract may only be modified only by a
written agreement signed by both parties.(c) Governing Law. This Contract shall be interpreted and governed in accordance
with the laws of the State of Missouri.14. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of
action against the other party arising from or relating to this Contract, the prevailing party
in such proceeding shall be entitled to recover reasonable attorney fees and court costs.15. PERFORMANCE:(a)Contractor may, at its discretion, engage licensed subcontractors to perform work
pursuant this Contract provided Contractor shall remain fully responsible for the proper
completion of the Project. (b) All work shall be completed in a workman-like manner and in compliance with
all building codes and applicable laws. To the extent required by law, all work shall be
performed by individuals duly licensed and authorized by law to perform said work.(c)Contractor agrees to remove all debris and leave the premises in broom clean
condition.16. WARRANTY: Contractor's warranty shall be limited to defects in workmanship
within the scope of work performed by Contractor and which arise and become known
within one (1) year from the date hereof. All said defects arising after one (1) year and
defects in material are not warranted by Contractor. Contractor hereby assigns to
Owner all warranties on materials as provided by the manufacturer of such materials.
AGREED:CONTRACTOR:SignaturePrint Name & TitleDateLicense NumberName and Address of License HolderOWNER:SignaturePrint NameDate STATUTORY NOTICES TO OWNER: NOTICE TO OWNER FAILURE OF THIS CONTRACTOR TO PAY THOSE PERSONS SUPPLYING
MATERIAL OR SERVICES TO COMPLETE THIS CONTRACT CAN RESULT IN
THE FILING OF A MECHANIC'S LIEN ON THE PROPERTY WHICH IS THE
SUBJECT OF THIS CONTRACT PURSUANT TO CHAPTER 429, RSMO. TO AVOID
THIS RESULT YOU MAY ASK THIS CONTRACTOR FOR "LIEN WAIVERS" FROM ALL PERSONS SUPPLYING MATERIAL OR SERVICES FOR THE WORK
DESCRIBED IN THIS CONTRACT. FAILURE TO SECURE LIEN WAIVERS MAY
RESULT IN YOUR PAYING FOR LABOR AND MATERIAL TWICE. CONSENT OF OWNER CONSENT IS HEREBY GIVEN FOR FILING OF MECHANIC'S LIENS BY ANY
PERSON WHO SUPPLIES MATERIALS OR SERVICES FOR THE WORK
DESCRIBED IN THIS CONTRACT ON THE PROPERTY ON WHICH IT IS
LOCATED IF HE IS NOT PAID.___________________________(date)___________________________(owner's signature)
SECTIONS 436.350 TO 436.365 OF MISSOURI REVISED STATUTES PROVIDE YOU
WITH CERTAIN RIGHTS IF YOU HAVE A DISPUTE WITH A CONTRACTOR
REGARDING CONSTRUCTION DEFECTS. EXCEPT FOR CLAIMS FILED IN
SMALL CLAIMS COURT, IF YOU HAVE A DISPUTE WITH A CONTRACTOR, YOU
MUST DELIVER TO THE CONTRACTOR A WRITTEN CLAIM OF ANY
CONSTRUCTION CONDITIONS YOU ALLEGE ARE DEFECTIVE AND PROVIDE YOUR CONTRACTOR THE OPPORTUNITY TO MAKE AN OFFER TO REPAIR OR
PAY FOR THE DEFECTS. YOU ARE NOT OBLIGATED TO ACCEPT ANY OFFER MADE BY THE CONTRACTOR. READ THIS NOTICE CAREFULLY. THERE ARE
STRICT DEADLINES AND PROCEDURES UNDER SECTIONS 436.350 TO 436.365
WHICH MUST BE OBEYED IN ORDER TO PRESERVE YOUR ABILITY TO FILE A
LAWSUIT. OTHER THAN REPAIRS TO WORK DONE BY THE CONTRACTOR
THAT ARE NECESSARY TO PROTECT THE LIFE, HEALTH, OR SAFETY OF
PERSONS LIVING IN A RESIDENCE, OR TO AVOID ADDITIONAL SIGNIFICANT AND MATERIAL DAMAGE TO THE RESIDENCE PURSUANT TO SUBSECTION 10
OF SECTION 436.356, YOU MAY NOT INCLUDE IN CLAIMS AGAINST YOUR
CONTRACTOR THE COSTS OF OTHER REPAIRS YOU PERFORM BEFORE YOU
ARE ENTITLED TO FILE A LAWSUIT UNDER SECTIONS 436.350 TO 436.365.
* Optional notice required only for contracts to be paid from insurance proceeds:You may cancel this contract at any time before midnight on the fifth business day after
you have received written notification from your insurer that all or any part of the claim or
contract is not a covered loss under the insurance policy. See attached notice of cancellation
form for an explanation of this right. NOTICE OF CANCELLATION If you are notified by your insurer that all or any part of the claim or contract is not a
covered loss under the insurance policy, you may cancel the contract by mailing or
delivering a signed and dated copy of this cancellation notice or any other written notice to (name of contractor) at (address of contractor's place of business) at any time prior to
midnight on the fifth business day after you have received such notice from your insurer. If
you cancel, any payments made by you under the contract, except for certain emergency
work already performed by the contractor, will be returned to you within ten business days
following receipt by the contractor of your cancellation notice.I HEREBY CANCEL THIS TRANSACTION___________________________(date)___________________________(insured's signature)
* Optional notice required only for home solicitation sales: NOTICE OF CANCELLATION ___________________________(Date of transaction must be filled in at time of sale by seller.)If this agreement was solicited at your residence and you do not want the goods or services,
you may cancel, without further obligation, this agreement by mailing a notice to the seller
at the address as shown below, within 3 business days following the above date. You shall
return the goods to seller in substantially the same condition as when you obtained them.
Seller will then cancel all contracts and negotiable instruments executed by you and return
any property given by you to seller within 10 days from date of transaction. If seller does
not pick up the purchased goods within 20 days from date of your cancellation, you may
retain or dispose of the goods without any further obligation. The notice must be mailed to:
___________________________. (Name and mailing address of seller must be filled in at
time of sale.)
Valuable advice on getting your ‘Under This Contract On Or Before’ online
Are you fed up with the inconvenience of handling paperwork? Look no further than airSlate SignNow, the leading eSignature solution for individuals and organizations. Bid farewell to the labor-intensive process of printing and scanning documents. With airSlate SignNow, you can easily finalize and sign paperwork online. Utilize the powerful tools included in this simple and cost-effective platform and transform your method of document management. Whether you need to sign forms or gather electronic signatures, airSlate SignNow manages it all seamlessly, requiring just a few clicks.
Adhere to this detailed guide:
- Sign in to your account or initiate a free trial with our service.
- Click +Create to upload a file from your device, cloud, or our template library.
- Open your ‘Under This Contract On Or Before’ in the editor.
- Click Me (Fill Out Now) to finalize the form on your end.
- Add and designate fillable fields for other participants (if needed).
- Continue with the Send Invite options to solicit eSignatures from others.
- Save, print your copy, or transform it into a reusable template.
No worries if you need to collaborate with your colleagues on your Under This Contract On Or Before or send it for notarization—our solution provides everything you need to undertake such tasks. Create an account with airSlate SignNow today and elevate your document management to new levels!
How long can a house be under contract
Under contract vs pending
What happens when house is under contract
How long is a house under contract before sold
Does under contract mean sold
Can a house under contract fall through
Under contract meaning
Contingent vs under contract