Establishing secure connection…Loading editor…Preparing document…

Builders Risk Insurance

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

INSULATION CONTRACT

THIS INSULATION CONTRACT (“Contract"), effective as of the date of the last party to sign below, is between having an address at ("Cont

For valuable consideration the parties hereby agree as follows:

1. SCOPE OF WORK: Contractor shall provide all labor and materials, and perform all work necessary for the completion of the residence, structure, or improvements as described in the drawings and specifications signed by both Owner and Contractor ("Project") and more particularly described as

Such drawings and specifications are hereby made a part of this Contract. Drawings and specifications shall contain a scale drawing showing the shape, size, and dimensions of the construction and equipment together with a description of the work to be done, materials to be used, and the equipment to be used or installed.

Location Material Thickness R-Value Vapor Barrier Total Sq. Ft.

2. WORK SITE: The Project shall be constructed on the property of Owner located at

3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this Contract on or before and shall su

4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may be required by the local municipal/county government, the cost thereof shall be included as part of the Project price.

5. INSURANCE: Contractor shall maintain general liability, workers compensation and builder's risk insurance.

6. SURVEY AND TITLE: If the Project is near the Owner's property boundary, Owner will point out property lines to the Contractor. If the Owner or Contractor has any doubt about the location of the property lines, Owner shall provide Contractor with boundary stakes through a licensed surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that affect the Work Site.

7. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work, including changes to the drawings and specifications, from time to time during the construction of the Project. However, any such change or modification shall only be made by written "Change Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the estimated cost.

8. CONTRACT PRICE:

{COST PLUS}

Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of $ for performing the services set forth in the scope of the work.

Contractor shall be paid as follows:

OR

{FIXED FEE}

Owner agrees to pay Contractor the sum of $ for performing the services set forth in the scope of the work.

Contractor shall be paid as follows:

Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or materials provided at the time the next periodic payment shall be due.

9. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10) days from the due date shall be deemed a material breach of this Contract. If payment is not made when due, Contractor may suspend work on the job until such time as all payments due have been made without breach of the Contract pending payment or resolution of any dispute. Owner agrees to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the rate of 1% per month.

10. DESTRUCTION AND DAMAGE: If the Project is destroyed or damaged for any reason, except where such destruction or damage was caused by the sole negligence of the Contractor or its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in rebuilding or restoring the Project to its condition prior to such destruction or damage. If the estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by either party, Contractor shall be excused from further performance under this Contract and Owner shall pay Contractor a percentage of the Contract price in proportion to the amount of work accomplished prior to the destruction or damage.

11. ASSIGNMENT: Neither party may assign this Contract, or payments due under the Contract, without the other party's written consent. Any such assignment shall be void and of no effect.

12. INTERPRETATION:

(a) Interpretation of Documents. The Contract, drawings, and specifications are intended to supplement one another. In the event of a conflict, the specifications shall control the drawings, and the Contract shall control both. If work is displayed on the drawings but not called for in the specifications, or if the work is called for in the specifications but not displayed on the drawings, Contractor shall be required to perform the work as though it were called for and displayed in both documents.

(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other agreements, oral or written, pertaining to the work to be performed under this Contract exists between the parties. This Contract may only be modified only by a written agreement signed by both parties.

(c) Governing Law. This Contract shall be interpreted and governed in accordance with the laws of the State of New Hampshire.

13. ATTORNEYS' FEES AND COSTS: If any party to this Contract brings a cause of action against the other party arising from or relating to this Contract, the prevailing party in such proceeding shall be entitled to recover reasonable attorney fees and court costs.

14. PERFORMANCE:

(a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant this Contract provided Contractor shall remain fully responsible for the proper completion of the Project.

(b) All work shall be completed in a workman-like manner and in compliance with all building codes and applicable laws. To the extent required by law, all work shall be performed by individuals duly licensed and authorized by law to perform said work.

(c) Contractor agrees to remove all debris and leave the premises in broom clean condition.

15. WARRANTY: Contractor's warranty shall be limited to defects in workmanship within the scope of work performed by Contractor and which arise and become known within one (1) year from the date hereof. All materials and installations incorporated into the work shall be new, unless otherwise specified, and shall be of good quality. Contractor warrants for a period of year(s), that the installed wall insulation R-Value is and the installed ceiling insulation R- Value is . All said defects arising after year(s) and defects in material are not warranted by Contractor. Contractor hereby assigns to Owner all warranties on materials as provided by the manufacturer of such materials.

AGREED:

CONTRACTOR:

Signature

Print Name & Title

Date

License Number

Name and Address of License Holder

OWNER:

Signature

Print Name

Date

NOTICES TO BUYER

NEW HAMPSHIRE LAW, RSA 359-G, CONTAINS IMPORTANT REQUIREMENTS YOU MUST FOLLOW BEFORE YOU MAY FILE A LAWSUIT OR OTHER ACTION FOR DEFECTIVE CONSTRUCTION AGAINST THE CONTRACTOR WHO CONSTRUCTED, REMODELED, OR REPAIRED YOUR HOME. SIXTY DAYS BEFORE YOU FILE YOUR LAWSUIT OR OTHER ACTION, YOU MUST SERVE ON THE CONTRACTOR A WRITTEN NOTICE OF ANY CONSTRUCTION CONDITIONS YOU ALLEGE ARE DEFECTIVE. UNDER THE LAW, A CONTRACTOR HAS THE OPPORTUNITY TO MAKE AN OFFER TO REPAIR AND/OR PAY FOR THE DEFECTS. THERE ARE STRICT DEADLINES AND PROCEDURES UNDER STATE LAW, AND FAILURE TO FOLLOW THEM MAY AFFECT YOUR ABILITY TO FILE A LAWSUIT OR OTHER ACTION.

*Notice applicable only to home solicitation sales:

ANY BUYER MAY CANCEL THIS TRANSACTION ANY TIME PRIOR TO MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION

Enter text

What Builders Risk Insurance Covers and When It Applies

Builders Risk Insurance is a property insurance policy that protects structures, materials, and equipment during construction, renovation, or installation work. It typically covers physical loss or damage from named perils such as fire, wind, theft, vandalism, and certain weather events while the project is in progress. Coverage can be issued to the owner, contractor, or both and often includes transit and storage for building materials. Policies are temporary and tied to the project timeline, and they commonly require a written description of the project, insured values, and any mortgagee or lender interests.

Why Builders Risk Insurance Matters for Projects

Builders Risk Insurance limits financial exposure from damage during construction, protects invested materials and work-in-progress, satisfies lender requirements, and reduces the risk that a single loss will delay completion or raise project costs.

Why Builders Risk Insurance Matters for Projects

Primary parties who complete or request Builders Risk Insurance

Builders Risk Insurance is typically arranged by one of the main parties to a construction project; who completes the policy depends on contract terms and lender requirements.

  • General contractors: Arrange coverage when contract requires contractor to provide policy and certify insured values and project dates.
  • Project owners / developers: Purchase owner-controlled policies to protect project equity and meet lender conditions.
  • Lenders and mortgagees: Require evidence of coverage and mortgagee clause to protect their financial interest.

Clarify in the construction contract who is responsible for procuring and maintaining the policy, who pays premiums, and how claims will be handled between parties.

Core elements to expect in a professional Builders Risk Insurance policy

A complete Builders Risk Insurance policy and its supporting paperwork should clearly describe the project, coverage limits and deductibles, covered perils, policy period, and any lender or additional insured provisions.

Coverage Scope

Defines covered property (structure, materials, equipment, scaffolding) and whether soft costs, testing, or debris removal are included.

Policy Period

Effective and expiration dates tied to construction start, substantial completion, or a specified calendar date; extensions require endorsements.

Limits and Deductible

Total insured value and per-loss deductible; values should include materials in transit and stored off-site if insured.

Covered Perils

Lists named perils or all-risk coverage; exclusions such as wear and tear, design defects, and certain floods may apply.

Mortgagee Clause

Specifies lender/mortgagee rights and address for notice of loss; required language varies by lender.

Extensions & Endorsements

Optional coverages such as delay in completion, testing, ordinance or law, and pollution liability require specific endorsements.

Step-by-step: completing and binding Builders Risk coverage

Follow these sequential steps to gather information, complete the form, obtain approvals, and bind coverage promptly.

  • 01
    Gather documents: Collect contracts, schedules, valuation worksheets, and lender instructions.
  • 02
    Calculate values: Determine total insured value including materials and soft costs.
  • 03
    Complete application: Enter project details, dates, and mortgagee information accurately.
  • 04
    Bind coverage: Submit to insurer, confirm binder, and provide certificate to lender and stakeholders.

Configuring the digital workflow to complete Builders Risk documents

When using an online platform, configure fields, signer order, authentication, and delivery to match contractual and lender requirements.

Field Configuration
Signature fields Set required signer order and allow initials where contracts permit.
Authentication Use email+SMS or ID verification for lenders and high-value signers.
Conditional fields Show lender clause or endorsements only when applicable.
Delivery options Provide signed copies to owner, contractor, and mortgagee automatically.

Typical routing and submission flow for a Builders Risk policy

A standard digital process moves the document from preparer to signers to distribution with audit and storage steps.

  • Prepare: Upload application and place fields.
  • Invite signers: Send secure signing links or emails in role order.
  • Authenticate: Use chosen verification method before signing.
  • Distribute: Send executed policy and certificate to lender and parties.

Technical considerations for digital completion and sharing

Ensure the platform you use supports required file formats, integrations, and signer authentication consistent with lender expectations.

  • Integrations: Salesforce | NetSuite | Procore | Microsoft 365
  • File formats: PDF, DOCX, and fillable forms supported
  • Authentication: Email, SMS code, and optional knowledge-based checks

Keep an audit trail and retain executed copies in secure cloud storage that meets regulatory and lender record-retention policies.

Typical timelines and deadlines associated with Builders Risk policies

Builders Risk policies and related documentation have time-sensitive milestones; meet notice and renewal deadlines to avoid coverage lapses.

Policy Effective Date:

Date coverage begins; must precede or match construction start.

Cancellation Notice:

Insurer must provide notice per policy and state law; lenders typically require immediate notification.

Lender Evidence:

Provide certificate and mortgagee clause to lender before funding or as contract requires.

Claim Notification:

Report loss promptly per policy conditions to preserve coverage.

Renewal / Extension:

Request extensions before expiration to maintain continuous coverage.

Key project milestones that affect Builders Risk coverage

Link insurance actions to construction milestones so coverage aligns with project phases and lender requirements.

01

Design Completion

Confirm estimated completion date and update insured value if scope changes.

02

Groundbreaking / Start

Activate policy effective date and notify lender of coverage.

03

Substantial Completion

Review transition to operations or builder's risk termination requirements.

04

Final Acceptance

Obtain endorsements, final certificates, and convert to permanent property insurance as required.

Common preparation errors to avoid

  • Underreporting total insured value or omitting materials in transit, which can trigger coinsurance penalties at claim time.
  • Failing to add the lender as mortgagee or using incorrect mortgagee wording, causing denial of lender claim rights.
  • Allowing coverage gaps during extensions or delays by not obtaining timely endorsements for revised completion dates.
  • Submitting incomplete project descriptions or incorrect site addresses, which can delay binding and create disputes at claim time.

Risks and potential consequences of incorrect or missing Builders Risk coverage

Uninsured Loss: Significant out-of-pocket rebuilding costs
Lender Refusal: Funding delays or loan default risk
Claim Denial: Exclusions or lapses can void coverage
Increased Premiums: Higher rates on renewal after losses
Contractual Breach: Potential liability for failing to provide required coverage
Project Delay Costs: Extended soft costs and lost rent exposure

Practical tips for accurate and efficient Builders Risk completion

Adopt clear, consistent procedures to reduce errors, ensure lender satisfaction, and speed policy binding.

Maintain a schedule of values
Use a detailed schedule of values to calculate the total insured amount and track changes; reconciling values prevents underinsurance and simplifies claims.
Standardize mortgagee wording
Keep lender/mortgagee clause templates on file and confirm lender-preferred language before submitting the policy to avoid reissuance delays.
Use digital workflows
Configure pre-filled fields, conditional endorsements, and automatic distribution to owner, contractor, and lender to reduce manual steps and errors.
Document changes promptly
When scope, completion date, or contract value changes, secure endorsements and updated certificates immediately to avoid coverage gaps.

Typical Builders Risk scenarios and how coverage helped manage losses

Two brief examples show practical uses: a mid-size commercial build and a restoration after storm damage.

Commercial Site

A contractor listed as named insured

  • materials in transit were covered during theft
  • the insurer paid for replacement materials, avoiding a construction delay and extra financing costs.

Storm Restoration

An owner-controlled policy was active during severe weather

  • damage to partially completed structure occurred
  • policy covered debris removal, partial rebuild, and extended soft cost loss.

Representative eSignature vendor pricing and feature comparison for document execution

Comparing core pricing and common features can help teams choose a signing solution for insurance forms and certificates. signNow is listed first per platform comparisons.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial No No Yes, limited Yes, limited
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
HIPAA Compliant Yes Yes Yes No No

Frequently asked questions about completing Builders Risk Insurance

Answers to common procedural and legal questions when preparing, signing, and delivering Builders Risk policies and certificates.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users