Establishing secure connection… Loading editor… Preparing document…
Navigation

Fill and Sign the Community Service Timesheet Form

Fill and Sign the Community Service Timesheet Form

How it works

Open the document and fill out all its fields.
Apply your legally-binding eSignature.
Save and invite other recipients to sign it.

Rate template

4.8
33 votes
New Hampshire CO2 Budget Trading Program Offset Project Consistency Application Landfill Methane Capture and Destruction Version 1.1 June 2010 Consistency Application – Landfill Methane Capture and Destruction Version 1.1 Contents 1. Overview ................................................................................................................................ 3 2. Submission Instructions......................................................................................................... 3 3. Consistency Application Forms ............................................................................................. 4 Part 1. General Information Forms....................................................................................... 4 Part 2. Category-Specific Information and Documentation Forms .................................... 12 Part 3. Independent Verification Form................................................................................ 22 June 2010 Page 2 Consistency Application – Landfill Methane Capture and Destruction Version 1.1 1. Overview To demonstrate that a landfill methane capture and destruction project qualifies for the award of CO2 offset allowances, a Project Sponsor must submit to the New Hampshire Department of Environmental Services in accordance with these instructions, a fully completed Offset Project Consistency Application – Landfill Methane Capture and Destruction Version 1.1 (“Consistency Application”), including the coversheet and all forms and related attachments. An incomplete Consistency Application will not be reviewed to determine consistency. Following these instructions will ensure that the Consistency Application contains all necessary information and is submitted properly. Each Project Sponsor should review the CO2 Budget Trading Program regulations (EnvA 4700) addressing offset projects and the award of CO2 offset allowances. All offset application materials and other documents are available at http://des.nh.gov/organization/divisions/air/tsb/tps/climate/rggi/index.htm. Before the Consistency Application can be completed, the Project Sponsor must establish a general account and obtain an offset project ID code through the RGGI CO2 Allowance Tracking System (RGGI COATS). The Project Sponsor identified in the Consistency Application must be the same as the Authorized Account Representative for the RGGI COATS general account identified in the Consistency Application. For information about establishing a RGGI COATS general account and offset project ID code, consult the RGGI COATS User’s Guide, available at http://www.rggi-coats.org. Key eligibility dates and application submittal requirements for offset projects are as follows: 2. • For offset projects commenced between December 20, 2005 and December 31, 2008, the Consistency Application must be submitted by December 31, 2009. • For offset projects commenced on or after January 1, 2009, the Consistency Application must be submitted within six months after the project is commenced. • For an offset project located solely in one participating state, the Consistency Application must be filed with the appropriate regulatory agency in that state. • For an offset project located in more than one participating state, the Consistency Application must be filed in the participating state where the majority of the CO2equivalent emissions reduction or carbon sequestration due to the offset project is expected to occur. Submission Instructions Submit one (1) complete hardcopy original Consistency Application as well as an electronic copy in the form of a CD disk to the New Hampshire Department of Environmental Services at the location specified below. Submit hardcopies of forms requiring signatures as originally-signed copies and scan such signed forms for electronic submission. Facsimiles of the Consistency Application are not acceptable under any circumstances. June 2010 Page 3 Consistency Application – Landfill Methane Capture and Destruction Version 1.1 Attention: Joseph T. Fontaine, Trading Programs Manager State of New Hampshire Department of Environmental Services Air Resources Division P.O. Box 95, 29 Hazen Drive Concord, NH 03302-0095 The Consistency Application has three parts, as described below. Each part comprises specified forms and required documentation. The Consistency Application has been created as a Microsoft Word document with editable fields. Enter information directly into the fields provided or submit information or documentation as an attachment, as directed. Include headers on all attachments indicating the form to which each is attached, the offset project name, and offset project ID code. The Project Sponsor should save an electronic copy for his or her file to serve as a reference for any necessary remediation. 3. Consistency Application Forms The Consistency Application includes nine (9) forms divided into three parts, as follows: Part 1. General Information Forms • • • • • Form 1.1 – Coversheet Form 1.2 – General Information Form 1.3 – Attestations Form 1.4 – Project Sponsor Agreement Form 1.5 – Disclosure of Greenhouse Gas Emissions Data Reporting Part 2. Category-Specific Information and Documentation Forms • • • Form 2.1 – Project Description Form 2.2 – Demonstration of Eligibility Form 2.3 – Monitoring and Verification Plan Part 3. Independent Verification Form • Form 3.1 – Independent Verifier Certification Statement and Report The following instructions address each of the forms in numerical order. Note that the forms themselves include many embedded instructions. Part 1. General Information Forms The five (5) forms in Part 1 of the Consistency Application address general requirements applicable to landfill methane capture and destruction offset projects. Instructions for the Part 1 forms are provided below. Form 1.1 Coversheet Enter the requested information in the editable text fields in the form. June 2010 Page 4 Consistency Application – Landfill Methane Capture and Destruction Version 1.1 Check the boxes to indicate which forms are being submitted. For information about entering the Project Sponsor, offset project name and offset project ID code, and RGGI COATS account name and number, see instructions below for Form 1.2, General Information. Submit all forms including the Coversheet. If a required form is not submitted, the Consistency Application will not be considered complete for commencement of review by the New Hampshire Department of Environmental Services. Form 1.2 General Information Enter the requested information in the editable text fields in the form. If a text field is not applicable or is unanswerable, enter “NA.” Note the following: Offset Project ID Code: Enter the offset project ID code. The offset project ID code is the alphanumeric code generated when the Project Sponsor creates a record of the offset project in the RGGI CO2 Allowance Tracking System (RGGI COATS). See the RGGI COATS User’s Guide for more information about creating an offset project record in RGGI COATS, available at http://www.rggicoats.org. Project Information: Enter project information. The name of the offset project should be the same name entered by the Project Sponsor when creating a project record in RGGI COATS. The project location entered should be the primary location of the project if the project consists of actions at multiple locations. The summary narrative of the project should indicate all locations where project actions occur or will occur. Project Sponsor: Identify the Project Sponsor and provide his or her contact information. The Project Sponsor is the natural person who is the Authorized Account Representative for the RGGI COATS general account identified in the Consistency Application. Project Sponsor Organization: Provide the full legal name of the organization the Project Sponsor represents, including any alternative names under which the organization also may be doing business (e.g., John Doe Enterprises, Inc., d/b/a JDE). If the Project Sponsor is representing himself or herself as an individual, enter “NA”. RGGI COATS General Account Name and Number: Enter the RGGI COATS general account name and number. The RGGI COATS general account identified in the Consistency Application is the RGGI COATS account into which any awarded CO2 offset allowances related to the offset project will be transferred. Form 1.3 June 2010 Attestations Page 5 Consistency Application – Landfill Methane Capture and Destruction Version 1.1 Sign and date the form. Submit the originally signed form as part of the paper hardcopy Consistency Application. Scan the signed and dated form for submission as part of the electronic version of the Consistency Application. If the offset project includes an electric generation component, any and all attribute credits generated by the offset project that may be used for compliance with a renewable portfolio standard (RPS) or other regulatory requirement (other than awarded CO2 offset allowances), must be transferred to the New Hampshire Department of Environmental Services. If applicable, attach a copy of the Attribute Credit Transfer Agreement to this form. The attached agreement must include a header that indicates the transfer agreement is attachment to Form 1.3 and includes the offset project name and offset project ID code. Form 1.4 Project Sponsor Agreement Sign and date the form. Submit the originally signed form as part of the paper hardcopy Consistency Application. Scan the signed and dated form for submission as part of the electronic version of the Consistency Application. Form 1.5 Disclosure of Greenhouse Gas Emissions Data Reporting Check the appropriate box in the form to indicate whether greenhouse gas emissions data related to the offset project have been or will be reported to any voluntary or mandatory programs, other than the CO2 Budget Trading Program. For each program for which data have been or will be reported, provide the program name, the program type (voluntary or mandatory), program contact information (website or street address), the categories of emissions data reported, the frequency of reporting, when the reporting began or will begin, and reporting status (prior, current, future). The Project Sponsor must disclose future reporting related to current commitments made to voluntary programs as well as future reporting mandated by current statutes, regulations, or judicial or administrative orders. June 2010 Page 6 Offset Project Name Offset Project ID Code Form 1.1 – Coversheet Project Sponsor Project Sponsor Organization RGGI COATS General Account Name RGGI COATS General Account Number Each of the following forms must be submitted. Check the boxes below to indicate that the submitted Consistency Application includes each of the required forms: Form 1.2 – General Information Form 1.3 – Attestations Form 1.4 – Project Sponsor Agreement Form 1.5 – Disclosure of Greenhouse Gas Emissions Data Reporting Form 2.1 – Project Description Form 2.2 – Demonstration of Eligibility Form 2.3 – Monitoring and Verification Plan Form 3.1 – Independent Verifier Certification Statement and Report Form 1.1 – Coversheet Consistency Application – Landfill Methane Capture and Destruction Version 1.1 June 2010 Page 7 Offset Project Name Offset Project ID Code Form 1.2 – General Information Project Sponsor (RGGI COATS Authorized Account Representative) Telephone Number Fax Number Email Address Street Address City State/Province Postal Code Country RGGI COATS General Account Name RGGI COATS General Account Number Name of Offset Project Application Date Summary Description of Offset Project Project City Project County Project State Project Commencement Date Project Sponsor Organization Primary Street Address City State/Province Postal Code Country Brief Description of Project Sponsor Organization Telephone Number Website URL Independent Verifier (Company/Organization) States Where Verifier Accredited Primary Street Address Website URL City State/Province Postal Code Country Point of Contact for Project Contact Telephone Number Contact Fax Number Contact Email Address Contact Street Address City State/Province Postal Code Country Form 1.2 – General Information Consistency Application – Landfill Methane Capture and Destruction Version 1.1 June 2010 Page 8 Offset Project Name Offset Project ID Code Form 1.3 – Attestations The undersigned Project Sponsor certifies the truth of the following statements: 1. The offset project referenced in this Consistency Application is not required pursuant to any local, state, or federal law, regulation, or administrative or judicial order. 2. The offset project referenced in this Consistency Application has not and will not be awarded credits or allowances under any other greenhouse gas program. 3. Check the boxes that apply: The offset project referenced in this Consistency Application does not include an electric generation component. The offset project referenced in this Consistency Application does include an electric generation component. Any and all attribute credits generated by the offset project that may be used for compliance with a renewable portfolio standard (RPS) or other regulatory requirement, with the exception of CO2 allowances awarded under the CO2 Budget Trading Program, will be transferred to the New Hampshire Department of Environmental Services. An Attribute Credit Transfer Agreement is attached. 4. The offset project referenced in this Consistency Application has not and will not receive any funding or other incentives from the Greenhouse Gas Emissions Reduction Fund under the New Hampshire Public Utilities Commission regulation Puc 2600. 5. A Consistency Application for the offset project or any portion of the offset project referenced in this Consistency Application has not been filed in any other participating state. 6. All offset projects for which the Project Sponsor or project sponsor organization has received CO2 offset allowances, if any, under the Project Sponsor’s or project sponsor organization’s ownership or control (or under the ownership or control of any entity which controls, is controlled by, or has common control with the Project Sponsor or project sponsor organization) are in compliance with all applicable requirements of the CO2 Budget Trading Program in all participating states. 7. I am authorized to make this submission on behalf of the project sponsor organization. I certify under penalty of law that I have personally examined, and am familiar with, the statements and information submitted in this Consistency Application and all its attachments. Based on my inquiry of those individuals with primary responsibility for obtaining the information, I certify that the statements and information are to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false statements and information or omitting required statements and information, including the possibility of fine or imprisonment. Project Sponsor signature date printed name title organization notary Form 1.3 – Attestations Consistency Application – Landfill Methane Capture and Destruction Version 1.1 June 2010 Page 9 Offset Project Name Offset Project ID Code Form 1.4 – Project Sponsor Agreement The undersigned Project Sponsor recognizes and accepts that the application for, and the receipt of, CO2 offset allowances under the CO2 Budget Trading Program is predicated on the Project Sponsor following all the requirements of Env-A 4700. The undersigned Project Sponsor holds the legal rights to the offset project, or has been granted the right to act on behalf of a party that holds the legal rights to the offset project. The Project Sponsor understands that eligibility for the award of CO2 offset allowance under Env-A 4700 is contingent on meeting the requirements of Env-A 4700. The Project Sponsor authorizes the New Hampshire Department of Environmental Services or its agent to audit this offset project for purposes of verifying that the offset project, including the Monitoring and Verification Plan, has been implemented as described in this application. The Project Sponsor understands that this right to audit shall include the right to enter the physical location of the offset project. The Project Sponsor submits to the legal jurisdiction of the State of New Hampshire. Project Sponsor signature date printed name title organization notary Form 1.4 – Project Sponsor Agreement Consistency Application – Landfill Methane Capture and Destruction Version 1.1 June 2010 Page 10 Offset Project Name Offset Project ID Code Form 1.5 – Disclosure of Greenhouse Gas Emissions Data Reporting Check the box below that applies: No greenhouse gas emissions data related to the offset project referenced in this Consistency Application have been or will be reported to a voluntary or mandatory program other than the CO2 Budget Trading Program. Greenhouse gas emissions data related to the offset project referenced in this Consistency Application have been or will be reported to a voluntary or mandatory program other than the CO2 Budget Trading Program. Information for all such programs to which greenhouse gas emissions data have been or will be reported is provided below. Name of Program to which GHG Emissions Data Reported Check all that apply: Reporting is currently ongoing Reporting was conducted in the past Reporting will be conducted in the future Reporting is mandatory Reporting is voluntary Program Contact Information – Address Enter Frequency of Reporting Enter Reporting Start Date Program Website Categories of Emissions Data Reported Name of Program to which GHG Emissions Data Reported Check all that apply: Reporting is currently ongoing Reporting was conducted in the past Reporting will be conducted in the future Reporting is mandatory Reporting is voluntary Program Contact Information – Address Enter Frequency of Reporting Enter Reporting Start Date Program Website Categories of Emissions Data Reported Add extra pages as needed. Form 1.5 – Disclosure of Greenhouse Gas Emissions Data Reporting Consistency Application – Landfill Methane Capture and Destruction Version 1.1 June 2010 Page 11 Consistency Application – Landfill Methane Capture and Destruction Version 1.1 Part 2. Category-Specific Information and Documentation Forms The three (3) forms in Part 2 of the Consistency Application address category-specific requirements and documentation for landfill methane capture and destruction offset projects. Instructions for the Part 2 forms are provided below. Form 2.1 Project Description Attach a detailed narrative of the actions to be taken as part of the offset project. The attached narrative must include a header that indicates it as an attachment to Form 2.1 and identifies the offset project name and offset project ID code. The narrative must include the following information: 1. Type of Project. Indicate the type of project: a. Flaring offset project – Landfill employs an active gas collection system. The flaring system can utilize either an open or enclosed flare. b. Electricity generation offset project – Landfill gas is used as a fuel for internal combustion engines, gas turbines, or boilers to produce electricity. c. Direct-use offset project – Landfill installs a system that enables an end user to utilize collected landfill gas for direct use as a valuable fuel source. 2. Project Owner and Operator Information. Provide organization legal name(s), point(s) of contact information, and physical address for the offset project owner and offset project operator. Provide organization legal name, point(s) of contact information, and physical address for the parent company if the owner or operator is a subsidiary. 3. Landfill Location and Specifications. Provide the following information and include as an appendix to the narrative a copy of the state or local operating permit or certificate for the landfill where the offset project and landfill gas collection system are located: a. Landfill location (city, state, zip code) and site I.D. number from the state or local operating permit or certificate; b. Types of waste accepted (municipal solid waste, non-hazardous sludge, industrial waste, construction and demolition debris, medical waste, or specify other) as stated in the state or local operating permit or certificate; c. Opening year as stated in the state or local operating permit or certificate; d. Closing year (if applicable) or estimated date of closure as stated in the state or local operating permit or certificate or approved closure plan; e. Total design waste capacity (specify cubic feet or tons) as stated in the state or local operating permit or certificate; f. June 2010 Current area (specify hectares or acres) devoted to landfilling as stated in the state or local operating permit or certificate, or if not available, from contour maps and filling plans; Page 12 Consistency Application – Landfill Methane Capture and Destruction Version 1.1 g. Average waste depth (in feet) as stated in the state or local operating permit or certificate, or if not available, from contour maps and filling plans; h. Total waste in place from weigh scale records or another documented source; i. Waste characteristics (food waste, wood, plastics, metal, paper, and specify other) represented as either percent of total mass or volume currently accepted, from weigh scale records of waste characterization and site-specific density records; j. Annual quantity of accepted waste (specify cubic feet or tons) for most recent year from weigh scale records or another documented source; and k. Average annual rainfall for location of landfill from NOAA’s National Climatic Data Center (NCDC). 4. Landfill Owner and Operator Information. Provide organization legal name(s), point(s) of contact information, and physical address for the landfill owner and landfill operator. Include organization legal name, point(s) of contact information, and physical address for the parent company if the owner or operator is a subsidiary. 5. Equipment Specifications and Technical Schematic. Provide the following offset project equipment specifications: a. Landfill gas collection equipment and landfill gas flow and composition monitoring equipment specifications including: i. Type(s) of equipment and manufacturer(s); ii. Dates of installation; iii. Dates of initial calibration; iv. Design landfill gas flow capacity (standard cubic feet per minute); v. Installed landfill gas flow meter accuracy; and vi. Methane concentration instrument thresholds (percent by volume) and methane concentration instrument precision and accuracy levels as specified by the manufacturer. b. For on-site flare projects: i. Type of flare(s) (open, enclosed, or specify other) and manufacturer(s); and ii. Design capacity of flare flow rate in standard cubic feet per minute as specified by the manufacturer. c. For on-site or off-site electricity generation projects: June 2010 i. Type of electricity generation technology (reciprocating engine, gas turbine, cogeneration, microturbine, steam turbine, combined cycle, organic Rankine cycle, or specify other); ii. Make (or model), manufacturer, and date of installation of combustion unit; iii. Design electricity generation capacity in units of MWe, as specified by the manufacturer; iv. Heat rate of combustion (Btu/kWh), as specified by the manufacturer; and Page 13 Consistency Application – Landfill Methane Capture and Destruction Version 1.1 v. Name, address, and point(s) of contact for each off-site purchaser of landfill gas. d. For on-site or off-site direct-use projects: i. Type of direct-use project (boiler, direct thermal, leachate evaporation, high-Btu quality fuel, medium-Btu quality fuel, methanol synthesis, or specify other); ii. Make (or model), manufacturer, and date of installation of combustion unit; iii. Pipeline length, diameter, and material type as stated in the state or local operating permit or certificate; and iv. Name, address, and point(s) of contact for each off-site purchaser of landfill gas. e. A technical schematic outlining the overall landfill gas capture and destruction system for the type of offset project (flare, electricity generation, or on-site or offsite direct use). The schematic must trace the landfill methane from source to destruction by combustion. Form 2.2 Demonstration of Eligibility Attach documentation, with state and federal identification numbers, as applicable, that indicates that the landfill from which the offset project will draw landfill gas is not subject to federal New Source Performance Standards (NSPS) for municipal solid waste landfills, 40 CFR Part 60, Subpart Cc and Subpart WWW. The documentation must include the initial design capacity report submitted to the U.S. EPA pursuant to 40 CFR 60, Subpart WWW 60.752(a) or 40 CFR 60, Subpart Cc 60.33c(d), and in accordance with 40 CFR 60, Subpart WWW 60.757(a)(2). Note that for purposes of eligibility under Env-A 4700, a MSW landfill is considered to be subject to NSPS at 40 CFR 60, Subparts Cc and WWW if the landfill is subject to the federal emissions requirements at 40 CFR 60, Subpart Cc 60.33c(e) or Subpart WWW 60.752(b). Each attachment must include a header that indicates it is an attachment to Form 2.2 and includes the offset project name and offset project ID code. Form 2.3 Monitoring and Verification (M&V) Plan Provide the Monitoring and Verification Plan (M&V Plan) as an attachment to Form 2.3. The M&V Plan must include a header that indicates it is an attachment to Form 2.3 and includes the offset project name and offset project ID code. Check the boxes to indicate that the attached M&V Plan includes required components. The M&V Plan must include the following: June 2010 Page 14 Consistency Application – Landfill Methane Capture and Destruction Version 1.1 1. Procedures for Quantifying Annual CO2-equivalent Emissions Reductions. Specify the data source(s) and the calculations to be used to determine emission reductions. 2. Procedures for Quantifying Annual Volume of Methane Collected. Specify the data sources and calculations to be used for quantifying in standard cubic feet (scf) annual volume of methane collected. 3. Procedures for Quantifying Mass of Methane per Cubic Foot of Methane. Specify whether the default value of 0.04246 lbs/scf at 1 atmosphere and 20o C will be used, or specify the procedures that will be used to monitor temperature and pressure, derive an alternate representative temperature, and the data sources and value for the appropriate mass of CH4 per standard cubic foot of methane (lbs/scf). 4. Quality Assurance/Quality Control (QA/QC) Program for Measuring Equipment. Document the QA/QC program, including the following: a. Procedures for recording names and contact information for: personnel responsible for recording measurements and data entry, QA/QC managers, and third party analytical laboratory; b. Procedures for designated personnel to keep landfill gas sales records (in MMBtu or standard cubic feet), electricity sales records, records of measured heat rate of combustion device if applicable, and records of newly installed equipment and retired equipment; c. Procedures for annual comparison of collected methane measured by monitoring equipment with calculated methane in landfill gas used to generate electricity or sold for direct use, noting any discrepancies; d. Calculation procedures for standardizing landfill gas flow that correct for documented site-specific temperature and pressure measurements. (This procedure is not necessary when using flow meters that automatically measure temperature and pressure and express landfill gas flow in standard cubic feet); and e. Description of the contents of an annual quality control report describing the procedures for QA/QC of landfill gas collection and monitoring equipment during the reporting period and a schedule for the annual completion of such report. The report should identify findings of quarterly reviews, issues encountered, and remedial actions taken. 5. Maintenance, Operation, and Calibration of Measuring and Monitoring Equipment. Document the protocol for maintenance, operation, and calibration of measuring and monitoring equipment, including the following: a. Maintenance of Measuring and Monitoring Equipment. Document the protocol that will be used to ensure that the following required actions are performed and documented: i. Records are kept of landfill gas flow rate performance tests at least monthly to ensure: (A) June 2010 flow readings are recorded at least every 15 minutes; Page 15 Consistency Application – Landfill Methane Capture and Destruction Version 1.1 ii. (B) the accuracy of landfill gas flow meter readings is within +/- 5 percent of manufacturer specifications; and (C) methane concentration instrument manufacturer specifications for precision and accuracy are met; and Maintenance schedules for landfill gas flow meter and methane concentration instrument (for permanent and/or portable equipment) are performed in accordance with manufacturer recommendations and specifications. b. Operation of Measuring and Monitoring Equipment. Document the protocol that will be used to ensure that the following required actions are performed and documented: i. Records are kept at least daily of collected landfill gas flow rates and methane concentration; ii. Records are kept on a monthly basis of the number of hours that the landfill gas collection system was not in operation; iii. Records are kept on a monthly basis of the number of hours that the combustion device (e.g., flare, boiler, electricity generation unit) was not in operation; iv. Records are kept on a monthly basis of the calculation of landfill gas flow rate standardization (in standard cubic feet per day) to correct for sitespecific pressure and temperature measurements. (This procedure is not necessary when using flow meters that automatically measure temperature and pressure and express landfill gas flow in standard cubic feet); v. Records are kept on an annual basis of the measured heat rate of combustion of the electric generation unit(s) (in Btu/kWh) in accordance with manufacturer specifications for landfill gas, if applicable to the offset project; and vi. Records are kept on a monthly basis of the amount of landfill gas combusted in standard cubic feet (scf) in the combustion device. c. Calibration of Measuring and Monitoring Equipment. Document the protocol that will be used to ensure that the following required actions are performed and documented: 6. June 2010 i. Records are kept of calibration procedures for landfill gas flow monitoring equipment as specified by the manufacturer; ii. Records are kept of calibration procedures for permanent methane concentration measurement equipment as specified by the manufacturer; and iii. Calibration schedules for landfill gas flow meter and methane concentration instrument (for permanent and/or portable equipment) are maintained in accordance with manufacturer recommendations and specifications. Records Retention. Document the recordkeeping protocol that will be used to maintain record keeping throughout the duration of the offset project, including maintenance of an electronic index of all material to be collected, and storage Page 16 Consistency Application – Landfill Methane Capture and Destruction Version 1.1 procedures to ensure maintenance of collected information in electronic and/or hardcopy form for the following required information: a. QA/QC Program for Measuring Equipment. i. Names and contact information for the following: (A) personnel responsible for recording measurements; (B) personnel responsible for data entry; (C) QA/QC managers; and (D) third-party analytical laboratory; and ii. Annual QA/QC reports and the associated findings and remedial actions taken; and iii. Annual comparison of collected methane as measured by monitoring equipment with calculated methane used to generate electricity or landfill gas sold, if applicable to the offset project. b. Maintenance of Measuring and Monitoring Equipment. i. Records of all installed equipment and retired equipment related to landfill gas collection system and landfill gas combustion; ii. Landfill gas flow meter performance tests for each month; iii. Methane concentration instrument performance tests for each month; and iv. Maintenance schedules for landfill gas flow meter and methane concentration instrument. c. Operation of Measuring and Monitoring Equipment. i. Landfill gas sales records (in MMBtu or standard cubic feet of methane) or electricity sales records (in kWh) for each month, if applicable to the offset project; ii. Landfill gas flow meter readings in at least 15 minute intervals; iii. Methane concentration instrument readings in at least daily intervals; iv. Landfill gas collection system operating hours for each month; v. Combustion device operating hours for each month; vi. Landfill gas flow meter pressure and temperature measurements for each month; vii. Heat rate of combustion of electric generation unit(s) for reporting year, if applicable to the offset project; and viii. Methane combustion data for combustion device in at least 15 minute intervals. d. Calibration of Measuring and Monitoring Equipment. i. June 2010 Calibration procedures and schedules for landfill gas flow meter and methane concentration instrument (for permanent and/or portable equipment). Page 17 Consistency Application – Landfill Methane Capture and Destruction Version 1.1 7. June 2010 Independent Verification of Landfill Gas Methane Composition. Document the process that will be used to perform annual third-party analysis of sampled landfill gas methane composition. Provide as an appendix to the M&V Plan a copy of the contract (with financial information redacted) for annual third-party laboratory analysis of sampled landfill gas using U.S. EPA-approved laboratory testing methods (e.g., see U.S. EPA Method 3C available at: http://www.epa.gov/ttn/emc/ promgate.html). Document the protocol that will be used to ensure that the landfill gas samples will be taken at the same location as the landfill gas flow meter. Page 18 Offset Project Name Offset Project ID Code Form 2.1 – Project Description Attach a detailed narrative of the actions to be taken as part of the offset project. The attached narrative must include a header that indicates it is an attachment to Form 2.1 and identifies the offset project name and offset project ID code. Check the boxes below to indicate that the detailed narrative of the offset project includes the following required information: 1. Type of project 2. Project owner and operator information 3. Landfill location and specifications 4. Landfill owner and operator information 5. Equipment specifications and technical schematic Form 2.1 – Project Description Consistency Application – Landfill Methane Capture and Destruction Version 1.1 June 2010 Page 19 Offset Project Name Offset Project ID Code Form 2.2 – Demonstration of Eligibility Attach documentation that the offset project meets eligibility requirements. Attached documentation must include a header that indicates it is an attachment to Form 2.2 and includes the offset project name and offset project ID code. Check the box below to indicate that the following required documentation is attached: Documentation that the landfill methane offset project will occur at a landfill not subject to federal New Source Performance Standards (NSPS) for municipal solid waste landfills, 40 CFR Part 60 Subpart Cc and Subpart WWW. Documentation must include the initial design capacity report submitted to the U.S. EPA pursuant to 40 CFR 60, Subpart WWW 60.752(a) or 40 CFR 60, Subpart Cc 60.33c(d), and in accordance with 40 CFR 60, Subpart WWW 60.757(a)(2). Form 2.2 – Demonstration of Eligibility Consistency Application – Landfill Methane Capture and Destruction Version 1.1 June 2010 Page 20 Offset Project Name Offset Project ID Code Form 2.3 – Monitoring and Verification Plan Attach the Monitoring and Verification Plan (M&V Plan). The M&V Plan must include a header that indicates it is an attachment to Form 2.3 and includes the offset project name and offset project ID code. Check the boxes below to indicate that the attached M&V Plan includes the following required information: 1. Procedures for quantifying annual CO2-equivalent emissions reductions 2. Procedures for quantifying annual volume of methane collected 3. Procedures for quantifying mass of methane per cubic feet of methane 4. Documentation of the quality assurance/quality control (QA/QC) program for measuring equipment 5. Documentation of the protocol for maintenance, operation, and calibration of measuring and monitoring equipment 6. Documentation of the protocol for records retention 7. Documentation of the process for independent verification of landfill gas methane composition Form 2.3 – Monitoring and Verification Plan Consistency Application – Landfill Methane Capture and Destruction Version 1.1 June 2010 Page 21 Consistency Application – Landfill Methane Capture and Destruction Version 1.1 Part 3. Independent Verification Form The form in Part 3 of the Consistency Application addresses the requirements and documentation related to the independent verifier certification statement and report. Instructions for the form in Part 3 are provided below. Form 3.1 Independent Verifier Certification Statement and Report An accredited independent verifier must sign and date the form. Submit the originally signed form as part of the paper hardcopy of the Consistency Application. Scan the signed and dated form for submission as part of the electronic version of the Consistency Application. Provide the independent verifier report as an attachment to Form 3.1. The verifier report must include a header that indicates it is an attachment to Form 3.1 and includes the offset project name and offset project ID code. The verifier report must document the following: 1. The verifier has reviewed the entire Consistency Application and evaluated the contents of the application in relation to the applicable requirements of Env-A 4700. 2. The verifier has evaluated the adequacy and validity of information supplied by the Project Sponsor to demonstrate that the offset project meets the applicable eligibility requirements of Env-A 4700. 3. The verifier has evaluated the adequacy of the monitoring and verification plan submitted pursuant to Env-A 4700. The verifier report must include the following contents, in the order listed below: • • • • • • • • • • • • June 2010 Cover page with report title and date Table of contents List of acronyms and abbreviations Executive summary Description of objective of report Identification of the client, including name, address, and other contact information Identification of the offset project Description of evaluation criteria (applicable regulatory provisions and documentation requirements specified in Consistency Application) Description of the review and evaluation process, including any site visits and interviews Identification of individuals performing the verification work, including the verification team leader and key personnel, and contact information for the team leader Description of the materials provided to the verifier by the Project Sponsor Evaluation conclusions and findings, including level of assurance provided Page 22 Offset Project Name Offset Project ID Code Form 3.1 – Independent Verifier Certification Statement and Report An accredited independent verifier must sign and date Form 3.1. Attach the accredited independent verifier report. The attached verifier report must include a header that indicates it is an attachment to Form 3.1 and includes the offset project name and offset project ID code Name of Accredited Independent Verifier I certify that the accredited independent verifier identified above reviewed the Consistency Application, including all forms and attachments, in its entirety, including a review of the following: (a) The adequacy and validity of information supplied by the Project Sponsor to demonstrate that the offset project meets the applicable eligibility requirements of Env-A 4700, including the required documentation that must be provided in the Consistency Application. (b) The adequacy of the Monitoring and Verification Plan in accordance with the applicable requirements of Env-A 4700, including the required documentation that must be provided in the Consistency Application. A verification report is attached that documents the verifier’s review of the items listed above and includes evaluation conclusions and findings. Verifier Representative signature date printed name title notary Form 3.1 – Independent Verifier Certification Statement and Report Consistency Application – Landfill Methane Capture and Destruction Version 1.1 June 2010 Page 23

Practical advice on getting your ‘Community Service Timesheet’ ready online

Are you fed up with the inconvenience of managing paperwork? Search no further than airSlate SignNow, the premier eSignature solution for individuals and businesses. Say farewell to the tedious process of printing and scanning documents. With airSlate SignNow, you can smoothly finalize and sign documents online. Utilize the extensive features included in this user-friendly and cost-effective platform to transform your approach to document management. Whether you need to approve forms or gather signatures, airSlate SignNow manages it all effortlessly, with just a few clicks.

Follow this detailed guide:

  1. Sign in to your account or sign up for a complimentary trial with our service.
  2. Click +Create to upload a file from your device, cloud storage, or our template collection.
  3. Open your ‘Community Service Timesheet’ in the editor.
  4. Click Me (Fill Out Now) to set up the document on your end.
  5. Insert and assign fillable fields for other users (if needed).
  6. Proceed with the Send Invite options to solicit eSignatures from others.
  7. Save, print your version, or convert it into a reusable template.

Don't worry if you need to work with your teammates on your Community Service Timesheet or send it for notarization—our solution provides you with everything necessary to achieve such tasks. Sign up with airSlate SignNow today and elevate your document management to new levels!

Here is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.

Need help? Contact Support
Community service timesheet template
Community service timesheet pdf
Community service timesheet sample
Community service timesheet example
Sign up and try Community service timesheet form
  • Close deals faster
  • Improve productivity
  • Delight customers
  • Increase revenue
  • Save time & money
  • Reduce payment cycles