FOUNDATION CONTRACT
THIS FOUNDATION CONTRACT (“Contract”), effective as of the date of the last
party to sign below, is between , having an address at
("Contractor") and , having an address at
("Owner").
For valuable consideration the parties hereby agree as follows:
1. SCOPE OF WORK: Contractor is responsible for all scheduling delivery of all
materials. Excess concrete material ordered will be disposed of according to Owner’s
instructions. Contractor shall schedule inspections of the work as necessary.
FOOTING -Concrete Mix or PSI: Slump:
Width: Depth: Reinforcing: Number:
Spacing: Dowels: Spacing: Keyway:
FROST FOOTING -Concrete Mix or PSI: Slump:
Width: Depth: Reinforcing: Number:
Spacing: Dowels: Spacing: Keyway:
FOUNDATION WALL -Material: Block -Size:
Concrete Mix or PSI: Slump: *
Width: * Beam Pocket Size: Reinforcing:
Number: Spacing:
PIERS -Concrete Mix or PSI: Slump:
Diameter Depth: Spacing:
Reinforcing: Number: Spacing:
PILINGS -Material:
Size: Spacing: Depth:
FIREPLACE FTG. -Concrete Mix or PSI: Slump:
Width: Length: Depth:
Reinforcing: Number: Spacing:
FOUNDATION WINDOWS: Size:
FOUNDATION DOORS: Size: *
CRAWL SPACE -Ground Cover: * Vents:
Access: Drain:
DRAIN TILE -Material/Size: Material over Tile:
FOUNDATION WATERPROOFING: Vapor Barrier:
Foundation Insulation: R-Value:
Found. Bolt/Size: Spacing: Termite Protection:
GIRDERS -Material: Size: Span:
COLUMNS -Material: Size: Spacing:
2. WORK SITE: The Project shall be constructed on the property of Owner located at
and more particularly described as (hereafter "the Work Site").
Owner hereby authorizes Contractor to commence and complete the usual and customary
excavation and gradin g on the Work Site as may be required in the judgment of the
Contractor to complete the Project. Unless called for in the drawings or specifications,
no landscaping, finish grading, filling or excavation is to be performed at the Work Site
by the Contract or.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed
under this Contract on or before and shall substantially complete the work
on or before . Contractor shall not be liable for any delay due to circumstances
beyond its control including strikes, casualty, acts of God, illness, injury, or general
unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory
approvals as may be required by the local municipal/county gover nment, the cost thereof
shall be included as part of the Project price.
5. SOIL CONDITIONS: Contractor shall have no responsibility for the condition of the
soils at the Work Site. Any excavation, filling or other work required by the Owner
other than t he usual and customary excavation and grading shall be agreed to in a Change
Order for an amount in addition to the Contract Price. Contractor shall not be
responsible for any damages suffered by Owner as a result of the soil conditions at the
Work Site.
6. INSURANCE: Contractor shall maintain general liability, workers compensation and
builder's risk insurance.
7. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner
will point out property lines to the Contractor. If the Owner or Contractor has any doubt
about the location of the property lines, Owner shall provide Contractor with boundary
stakes through a licensed surveyor. In addition, Owner shall provide Contractor
documentation that Owner has title to the Work Site and shal l provide Contractor copies
of any covenants, conditions, or restrictions that affect the Work Site.
8. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the
work, including changes to the drawings and specifications, from time to time dur ing the
construction of the Project. However, any such change or modification shall only be
made by written "Change Order" signed by both parties. Such Change Orders shall
become part of this Contract. Owner agrees to pay any increase in the cost of the
Project as a result of a Change Order. In the event the cost of a Change Order is not
known at the time a Change Order is executed, the Contractor shall estimate the cost
thereof and Owner shall pay the actual cost whether or not it is in excess of the e stimated
cost.
9. CONTRACT PRICE:
{COST PLUS}
Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of
$ for performing the services set forth in the scope of the work.
Contractor shall be paid as follows:
_______________________________________________________
_______________________________________________________
_________________________________________________ .
OR
{FIXED FEE}
Owner agrees to pay Contractor the sum of $ for performing the services set forth
in the scope of the work. Contractor shall be paid as follows:
______________________________________________________
______________________________________________________
__________________________ ___________ ______ .
Contractor shall furnish Owner appropriate releases or waivers of lien for all work
performed or materials provided at the time the next periodic payment shall be due.
10. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of
thirty (30) days from the due date shall be deemed a material breach of this Contract. If
payment is not made when due, Contractor may suspend work on the job until such time
as all payments due have been made without breach of the Contract pe nding payment or
resolution of any dispute. Owner agrees to pay a late charge of 12% of all payments that
are more than thirty (30) days late plus interest at the rate of 12% per month.
11. DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged f or any
reason, except where such destruction or damage was caused by the sole negligence of
the Contractor or its subcontractors, Owner shall pay Contractor for any additional work
done by Contractor in rebuilding or restoring the Project to its condition prior to such
destruction or damage. If the estimated cost of replacing work already accomplished by
Contractor exceeds 20 percent of the Contract price, either the Contractor or Owner may
terminate this Contract. Upon termination by either party, Contract or shall be excused
from further performance under this Contract and Owner shall pay Contractor a
percentage of the Contract price in proportion to the amount of work accomplished prior
to the destruction or damage.
12. ASSIGNMENT : Neither party may assi gn this Contract, or payments due under the
Contract, without the other party’s written consent. Any such assignment shall be void
and of no effect.
13. INTERPRETATION:
(a) Interpretation of Documents. The Contract, drawings, and specifications are
inten ded to supplement one another. In the event of a conflict, the specifications shall
control the drawings, and the Contract shall control both. If work is displayed on the
drawings but not called for in the specifications, or if the work is called for in th e
specifications but not displayed on the drawings, Contractor shall be required to perform
the work as though it were called for and displayed in both documents.
(b) Entire Agreement. This Contract constitutes the entire agreement of the parties.
No other agreements, oral or written, pertaining to the work to be performed under this
Contract exists between the parties. This Contract may only be modified only by a
written agreement sign ed by both parties.
(c) Governing Law. This Contract shall be interpreted and governed in accordance
with the laws of the State of Kentucky.
14. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of
action against the other party ar ising from or relating to this Contract, the prevailing party
in such proceeding shall be entitled to recover reasonable attorney fees and court costs.
15. PERFORMANCE:
(a) Contractor may, at its discretion, engage licensed subcontractors to perform work
pursuant this Contract provided Contractor shall remain fully responsible for the proper
completion of the Project.
(b) All work shall be completed in a workman -like manner and in compliance with
all building codes and applicable laws. To the extent req uired by law, all work shall be
performed by individuals duly licensed and authorized by law to perform said work.
(c) Contractor agrees to remove all debris and leave the premises in broom clean
condition.
16. WARRANTY: Contractor agrees to repair any cracks in the foundation wall in excess
of 1/8 inch and any leaks occurring through foundation wall ties for a period of
years. Contractor shall not be responsible, if Contractor informed Owner in writing, prior
to installation of the foundation, tha t possible unstable soil conditions may exist and
Owner waived the right to take steps to ensure a soil level that would provide a stable
load bearing capacity of the soil for the dwelling. Contractor shall not be responsible for
structural damage to the d welling due to the Owner’s failure to maintain suitable soil
moisture content at the footing level. Contractor shall not be responsible for cracks or
failure of the foundation caused by Owner’s failure to divert water away from the
foundation. Contractor a grees that, should the fireplace footing settle 1 inch vertically or
should the fireplace walls separate or otherwise move away from the dwelling in excess
of 1 1/2 inch at the intersection of the roof line and the fireplace wall, within a
year perio d, then, Contractor agrees to furnish and pay for all costs to stabilize the
fireplace footing for an additional period of years from the date repairs was
effected, at no additional cost to Owner; provided however, Contractor shall not be
responsible , if Contractor informed Owner in writing, prior to installation of the fireplace
footing, that possible unstable soil conditions may exist and Owner waived the right
instruct changes be made to ensure additional fireplace footing support. Contractor shall
not be responsible after this period. Contractor shall not be responsible for Owner’s
negligence. Contractor agrees to assist in securing fulfillment of warranties provided by
the manufacturer on the equipment supplied by Contractor. In the event, a crack develops
within the above warranty period, then Contractor agrees to repair or replace within
days of notice, weather permitting. Contractor hereby assigns to Owner all warranties on
materials as provided by the manufacturer of such materials.
SEC TIONS 411.250 TO 411.260 OF THE KENTUCKY REVISED STATUTES
CONTAIN IMPORTANT REQUIREMENTS YOU MUST FOLLOW BEFORE YOU
MAY FILE A LAWSUIT FOR DEFECTIVE CONSTRUCTION AGAINST THE
BUILDER OF YOUR HOME. YOU MUST DELIVER TO THE BUILDER A
WRITTEN NOTICE OF ANY CONS TRUCTION CONDITIONS YOU ALLEGE ARE
DEFECTIVE AND PROVIDE YOUR BUILDER THE OPPORTUNITY TO MAKE AN
OFFER TO REPAIR OR PAY FOR THE DEFECTS. YOU ARE NOT OBLIGATED
TO ACCEPT ANY OFFER MADE BY THE BUILDER. THERE ARE STRICT
DEADLINES AND PROCEDURES UNDER STATE LA W, AND FAILURE TO
FOLLOW THEM MAY AFFECT YOUR ABILITY TO FILE A LAWSUIT.
AGREED:
CONTRACTOR:
Signature
______________________________
Print Name & Title
______________
Date
______________________
License Number
______________________________
Name and Address of License Holder
OWNER:
Signature
______________________________
Print Name
_______________
Date
*Optional addendum required only for home solicitation sales:
BUYER'S RIGHT TO CANCEL
If this agreement was solicited to your residence and you do not want the goods or services, you
may cancel this agreement by mailing a notice to the seller. The notice must say that you do not
want the goods or services and must be mailed before midnight of the third business day after
you sign this agreement. The notice must be mailed to:
____________________________
____________________________
____________________________
* Note: If this is a retail installment contract, the title "Retail Installmen t Contract" must be
added, along with the following notice, terms, and acknowledgment of receipt:
NOTICE TO THE BUYER. DO NOT SIGN THIS CONTRACT BEFORE YOU READ IT
OR IF IT CONTAINS BLANK SPACES. YOU ARE ENTITLED TO A COPY OF THE
CONTRACT YOU SIGN.
RETAI L INSTALLMENT AGREEMENT
(No Consumer Credit Protection Act Disclosures)
Purchase Price. The total purchase price shall be $____________________________.
Interest. Interest shall be __________% simple interest per annum.
Payment Terms. Principal and interest shall be payable to Seller at
____________________________ (address), or at such other place as the holder hereof may
designate in writing, in __________ consecutive monthly installments of $ ______________.
The first of said install ments shall be due and payable on the day of ______________, 20____,
and each subsequent monthly installment shall be due and payable on the first day of each
succeeding month thereafter until the entire indebtedness is fully paid. The maximum number of
pa yments is __________ .
Downpayment. The amount of to be paid upfront as downpayment is
$_____________________ , to be paid on ______________________________.
Late Fees. Purchaser shall pay Seller, or his/her assignee a late charge of ______% of any
monthl y installment not received by the Seller or assignee within ______________ days after the
installment is due.
Purchase Money Security Interest . Seller hereby reserves and Purchaser hereby grants to
Seller a purchase money security interest in __________ ______________ (collateral), together
with all additions, parts, replacements, attachments, accessions, and accessories thereto and all
proceeds thereof, to secure payment of the purchase price.
Total Amount of Fees is $________________________.
Principa l Balance . The amount of the sales price, total fees, minus any downpayment and the
time price differential, is $________________________.
Amount of Time Price Differential . The difference between a property's immediate purchase
price and the price the sa me property would cost if purchased on an installment plan is
$________________________.
Time Balance . The principal balance plus time price differential equals the sum of
$______________________ .
Buyer's acknowledgement of receipt of copy of retail inst allment contract:
_______________________________ ___________________________
Buyer's Signature Date
Useful advice on finishing your ‘Excess Concrete Material Ordered Will Be Disposed Of According To Owners’ online
Are you fed up with the complications of handling paperwork? Look no further than airSlate SignNow, the ultimate digital signature solution for individuals and businesses. Bid farewell to the lengthy process of printing and scanning documents. With airSlate SignNow, you can easily complete and endorse paperwork online. Make the most of the extensive features available in this user-friendly and cost-effective platform, and transform your method of paperwork organization. Whether you need to approve forms or gather signatures, airSlate SignNow manages everything seamlessly, needing just a few clicks.
Adhere to this comprehensive guide:
- Access your account or register for a free trial of our service.
- Select +Create to upload a document from your device, cloud storage, or our form library.
- Open your ‘Excess Concrete Material Ordered Will Be Disposed Of According To Owners’ in the editor.
- Click Me (Fill Out Now) to finalize the document on your end.
- Insert and allocate fillable fields for other parties (if necessary).
- Proceed with the Send Invite settings to solicit eSignatures from others.
- Download, print your copy, or convert it into a reusable template.
No need to worry if you need to collaborate with your teammates on your Excess Concrete Material Ordered Will Be Disposed Of According To Owners or send it for notarization—our solution provides you with everything necessary to complete such tasks. Create an account with airSlate SignNow today and elevate your document management to a new level!