Establishing secure connection… Loading editor… Preparing document…
Navigation

Fill and Sign the Girders Columns and Posts Sill Sealer under the Sill Plates Sheathing and Siding the Exterior Walls Siding Form

Fill and Sign the Girders Columns and Posts Sill Sealer under the Sill Plates Sheathing and Siding the Exterior Walls Siding Form

How it works

Open the document and fill out all its fields.
Apply your legally-binding eSignature.
Save and invite other recipients to sign it.

Rate template

4.7
64 votes
- 1 - FRAMING CONTRACT THIS FRAMING CONTRACT (“Contract” ), effective as of the date of the last party to sign below, is between , having an address at ("Contractor") and , having an address at ("Owner"). For valuable consideration the parties hereby agree as follows: 1. SCOPE OF WORK: Framing shall be to the plans including all details. Floor joist l ayout shall be as best to avoid plumbing for tubs and toilets. Framing includes the ins tallation of sill plates; rim joists; floor joists; sub flooring; plates; exterior and interior walls; ceiling joists; headers; rafters; r oof sheathing; sub fascia and fascia; bridging; joist hangers; rough framing materials for stair jacks, treads and risers; collar ties; other attic bracing materials; roof overhang and soffit; rake boards; steel and/or wood girders; columns and posts; sill sealer under the sill plates; shea thing and siding the exterior walls; siding corners; interior and exterior decorative beams and posts; exterior moldings; drip edge/Z-bar (including trim materials over z-bar); windows; exterior doors (excepting the garag e door); frame and case garage door as needed; back-out garage door as needed; ventilation materials; termite shield; furring blocks on concrete walls; bracing; stiffbacks; backing blocks; nailing blocks; shi mming windows and doors; caulking and gluing continuous as needed; set all finish nails; insul ation behind tubs located on exterior walls; drywall behind tubs as required; box in vent areas; box in heat runs as required; framing for future recessed fixtures; kitchen and bathroom cabinet drops; fire stopping as requi red; deck posts; deck girders; deck floor joists and flooring; deck handrail and seating; deck stair j acks, treads and risers; and . Contractor shall return all excess material and damaged materials. Contractor shall call for inspections of the work as required. Framing Materials: Sill Insulation: Termite Shield: Bridging Material: Joist Hangers: SubFloor Material: Size: Glue: Underlayment Material: Size: Glue: Wall Sheathing Material: Size: Corner Brace Material: Wall Siding Material: Size: Roof Sheathing Material: Size: Flitch Plate Material/Size: Bolts: Nails-Framing Members: Siding: Windows: Exterior Trim: Exterior Doors: Use Material Type Size Spacing Greatest Span Each Size Sill Plate N/A N/A Box Sill/Rim Joist N/A N/A 1st Floor-Floor Joists - 2 - 2nd Floor-Floor Joists Ceiling Joists Rafters/Roof Trusses Exterior Studs Interior Studs Top & Bottom Plates N/A N/A Headers, Windows & Doors N/A Headers, Garage Door N/A Beams N/A Roof Bracing/Collar Ties Exterior Trim Material Type Thickness Size Fascia Board Soffit Siding Corners Garage Door Trim Window Trim Door Trim Rake Board Exterior Beams Exterior Posts Flashing Material: Windows: Doors: Soffit Vents: Gable Vents: WINDOWS: Manufacturer/Style: Material: Insulated Glass: Screens: Storms: Grilles: Shutters: STAIRS: LOCATION JACKS TREADS RISERS Material Size Material Size Material Size Basement - 3 - 1st Floor 2nd Floor Disappearing Stairs-Make and Model Number: EXTERIOR DOORS: (Including Storm Doors) Door Brand/Model/Material Size Thickness Hardware Front Rear Sliding/Patio Garage 2. WORK SITE: The Project shall be constructed on the property of Owner located at and more particularly described as (hereafter "the Work Site"). Owner hereby authorizes Contractor to commence and complete the usual and customary excavation and grading on the Work Site as may be required in the judgment of the Contractor to complete the Project. Unless called for in the drawings or specifications, no landscaping, finish grading, filling or excavation is to be performed at the Work Site by t he Contractor. 3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this Contract on or before and shall substantially complete the work on or before . Contractor shall not be liable for any delay due to circumstances beyond its control including strikes, casualty, acts of God, illness, injury, or general unavailability of mate rials. 4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may be required by the local municipal/county government, the cost thereof shal l be included as part of the Project price. 5. INSURANCE: Contractor shall maintain general liability, workers compensation and builde r's risk insurance. 6. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point out property lines to the Contractor. If the Owner or Contractor has any doubt about the location of the property lines, Owner shall provide Contractor with boundary stakes through a licensed surveyor. In addition, Owner shall provide Contractor documentation that Owner has t itle to the Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that affect the Work Site. 7. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work, including changes to the drawings and specifications, from time to tim e during the constr uction of the Project. However, any such change or modification shall only be ma de by written "Change Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the cost of a Change Order is not known at the time a Change Order is executed , the Contractor shall estimate the cost thereof and Owner shall pay the actual cost whe ther or not it is in excess of the - 4 - estimated cost. 8. CONTRACT PRICE: {COST PLUS} Owner agrees to pay Contractor the actual cost to C ontractor of materials plus the sum of $ for performing the services set forth in th e scope of the work. Contractor shall be paid as follows: . OR {FIXED FEE} Owner agrees to pay Contractor the sum of $ for performing the services set forth in the scope of the work. Contractor shall be paid as follows: . Contractor shall furnish Owner appropriate releases or waivers of lien for al l work performed or materials provided at the time the next periodic payment shall be due. 9. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10) days from the due date shall be deemed a material breach of thi s Contract. If payment is not made when due, Contractor may suspend work on the job until such time as all payment s due have been made without breach of the Contract pending payment or resolution of any dis pute. Owner agrees to pay a late charge of 1% of all payments that are more than ten (10) day s late plus interest at the rate of 1% per month. 10. DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason, except where such destruction or damage was caused by the sole negli gence of the Contractor or its subcontractors, Owner shall pay Contractor for any additional work done by Contra ctor in rebuilding or restoring the Project to its condition prior to such destruction or damage. If the estimated cost of replacing work already accomplished by Contractor exc eeds 20 percent of the Contract price, either the Contractor or Owner may terminate this Contract. Up on termination by either party, Contractor shall be excused from further performance under this Contract and Owner shall pay Contractor a percentage of the Contract price in proportion to the amount of work accomplished prior to the destruction or damage. 11. ASSIGNMENT : Neither party may assign this Contract, or payments due under the Contra ct, without the other party’s written consent. Any such assignment shall be void and of no effec t. 12. INTERPRETATION: (a) Interpretation of Documents. The Contract, drawings, and specifications are intended to - 5 - supplement one another. In the event of a conflict, the specifications shall control the drawings, and the Contract shall control both. If work is displayed on the drawings but not called for in the specifications, or if the work is called for in the specifications but not displayed on the drawings, Contractor shall be required to perform the work as though it were called for and displayed in both documents. (b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No ot her agreements, oral or written, pertaining to the work to be performed under this Contr act exists between the parties. This Contract may only be modified only by a writ ten agreement signed by both parties. (c) Governing Law. This Contract shall be interpreted and governed in accordance with the laws of the State of Louisiana. 13. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action against the other party arising from or relating to this Contract, the pre vailing party in such proceeding shall be entitled to recover reasonable attorney fees and court costs. 14. PERFORMANCE: (a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant this Contract provided Contractor shall remain fully responsible for the proper compl etion of the Project. (b) All work shall be completed in a workman-like manner and in compliance w ith all building codes and applicable laws. To the extent required by law, all work shall be performed by individuals duly licensed and authorized by law to perform said work. (c) Contractor agrees to remove all debris and leave the premises in broom clean condition. 15. WARRANTY: WARRANTY: Contractor's warranty shall be limited to due to improper framing labor techniques, except for the following allowances: floor varianc e shall no t exceed 1/4 inch in 32 inches, bowed or out of plumb walls shall not exceed 1/4 inch in 32 i nches, non - excessive floor squeaks or pops which arise and become known within ________ year(s) f rom the date hereof. All said defects arising after one ________ year(s) and defects in material are not warranted by Contractor. Contractor hereby assigns to Owner all warranties on ma terials as provided by the manufacturer of such materials. AGREED: CONTRACTOR: Signature Print Name & Title Date OWNER: Signature Print Name Date - 6 - License Number Name and Address of License Holder

Useful tips for preparing your ‘Girders Columns And Posts Sill Sealer Under The Sill Plates Sheathing And Siding The Exterior Walls Siding’ online

Are you weary of the inconvenience of managing paperwork? Search no further than airSlate SignNow, the premier electronic signature solution for both individuals and businesses. Bid farewell to the lengthy process of printing and scanning documents. With airSlate SignNow, you can effortlessly complete and sign forms online. Take advantage of the powerful features included in this intuitive and budget-friendly platform and transform your method of document administration. Whether you need to sign documents or collect eSignatures, airSlate SignNow manages it all seamlessly, needing just a few clicks.

Follow this detailed guide:

  1. Log into your account or initiate a free trial with our service.
  2. Click +Create to upload a file from your device, cloud storage, or our template repository.
  3. Access your ‘Girders Columns And Posts Sill Sealer Under The Sill Plates Sheathing And Siding The Exterior Walls Siding’ in the editor.
  4. Click Me (Fill Out Now) to set up the document on your end.
  5. Insert and designate fillable fields for others (if necessary).
  6. Continue with the Send Invite options to solicit eSignatures from others.
  7. Save, print your copy, or convert it into a reusable template.

No need to worry if you need to collaborate with your coworkers on your Girders Columns And Posts Sill Sealer Under The Sill Plates Sheathing And Siding The Exterior Walls Siding or send it for notarization—our solution provides you with all you require to complete such tasks. Sign up with airSlate SignNow today and elevate your document management to the next level!

Here is a list of the most common customer questions. If you can’t find an answer to your question, please don’t hesitate to reach out to us.

Need help? Contact Support
Sill gasket under bottom plate
Sill seal Tape
Sill seal home depot
Sill seal Foam
Sill plate sealer
Neoprene sill sealer
Super sill Sealer
Is sill seal required by code

The best way to complete and sign your super sill sealer

Save time on document management with airSlate SignNow and get your super sill sealer eSigned quickly from anywhere with our fully compliant eSignature tool.

How to Sign a PDF Online How to Sign a PDF Online

How to complete and sign documents online

Previously, working with paperwork took pretty much time and effort. But with airSlate SignNow, document management is easy and fast. Our powerful and easy-to-use eSignature solution enables you to easily complete and eSign your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form online from any internet-connected device.

Follow the step-by-step guidelines to eSign your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form template online:

  • 1.Sign up for a free trial with airSlate SignNow or log in to your account with password credentials or SSO authorization option.
  • 2.Click Upload or Create and import a file for eSigning from your device, the cloud, or our form library.
  • 3.Click on the file name to open it in the editor and utilize the left-side toolbar to complete all the empty fields accordingly.
  • 4.Put the My Signature field where you need to approve your sample. Provide your name, draw, or import an image of your handwritten signature.
  • 5.Click Save and Close to finish editing your completed form.

As soon as your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form template is ready, download it to your device, export it to the cloud, or invite other people to electronically sign it. With airSlate SignNow, the eSigning process only requires several clicks. Use our powerful eSignature solution wherever you are to manage your paperwork efficiently!

How to Sign a PDF Using Google Chrome How to Sign a PDF Using Google Chrome

How to fill out and sign paperwork in Google Chrome

Completing and signing documents is simple with the airSlate SignNow extension for Google Chrome. Installing it to your browser is a quick and beneficial way to manage your forms online. Sign your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form template with a legally-binding eSignature in just a couple of clicks without switching between tools and tabs.

Follow the step-by-step guide to eSign your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form template in Google Chrome:

  • 1.Navigate to the Chrome Web Store, locate the airSlate SignNow extension for Chrome, and add it to your browser.
  • 2.Right-click on the link to a form you need to sign and select Open in airSlate SignNow.
  • 3.Log in to your account with your credentials or Google/Facebook sign-in option. If you don’t have one, sign up for a free trial.
  • 4.Utilize the Edit & Sign toolbar on the left to complete your sample, then drag and drop the My Signature option.
  • 5.Insert a picture of your handwritten signature, draw it, or simply enter your full name to eSign.
  • 6.Make sure all information is correct and click Save and Close to finish editing your paperwork.

Now, you can save your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form sample to your device or cloud storage, send the copy to other individuals, or invite them to electronically sign your form with an email request or a secure Signing Link. The airSlate SignNow extension for Google Chrome improves your document processes with minimum effort and time. Try airSlate SignNow today!

How to Sign a PDF in Gmail How to Sign a PDF in Gmail How to Sign a PDF in Gmail

How to fill out and sign paperwork in Gmail

When you get an email containing the girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form for approval, there’s no need to print and scan a file or save and re-upload it to another program. There’s a much better solution if you use Gmail. Try the airSlate SignNow add-on to quickly eSign any documents right from your inbox.

Follow the step-by-step guide to eSign your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form in Gmail:

  • 1.Visit the Google Workplace Marketplace and find a airSlate SignNow add-on for Gmail.
  • 2.Install the program with a corresponding button and grant the tool access to your Google account.
  • 3.Open an email with an attached file that needs approval and utilize the S symbol on the right panel to launch the add-on.
  • 4.Log in to your airSlate SignNow account. Choose Send to Sign to forward the file to other people for approval or click Upload to open it in the editor.
  • 5.Place the My Signature field where you need to eSign: type, draw, or upload your signature.

This eSigning process saves efforts and only takes a few clicks. Use the airSlate SignNow add-on for Gmail to update your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form with fillable fields, sign paperwork legally, and invite other parties to eSign them al without leaving your inbox. Improve your signature workflows now!

How to Sign a PDF on a Mobile Device How to Sign a PDF on a Mobile Device How to Sign a PDF on a Mobile Device

How to fill out and sign documents in a mobile browser

Need to rapidly fill out and sign your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form on a mobile phone while working on the go? airSlate SignNow can help without the need to set up extra software programs. Open our airSlate SignNow tool from any browser on your mobile device and create legally-binding eSignatures on the go, 24/7.

Follow the step-by-step guide to eSign your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form in a browser:

  • 1.Open any browser on your device and follow the link www.signnow.com
  • 2.Create an account with a free trial or log in with your password credentials or SSO authentication.
  • 3.Click Upload or Create and add a file that needs to be completed from a cloud, your device, or our form library with ready-to go templates.
  • 4.Open the form and complete the empty fields with tools from Edit & Sign menu on the left.
  • 5.Add the My Signature area to the form, then enter your name, draw, or add your signature.

In a few easy clicks, your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form is completed from wherever you are. As soon as you're finished editing, you can save the document on your device, generate a reusable template for it, email it to other people, or invite them electronically sign it. Make your paperwork on the go quick and effective with airSlate SignNow!

How to Sign a PDF on iPhone How to Sign a PDF on iPhone

How to fill out and sign paperwork on iOS

In today’s business world, tasks must be accomplished rapidly even when you’re away from your computer. Using the airSlate SignNow mobile app, you can organize your paperwork and approve your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form with a legally-binding eSignature right on your iPhone or iPad. Install it on your device to close deals and manage forms from just about anywhere 24/7.

Follow the step-by-step guidelines to eSign your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form on iOS devices:

  • 1.Go to the App Store, search for the airSlate SignNow app by airSlate, and set it up on your device.
  • 2.Open the application, tap Create to upload a form, and select Myself.
  • 3.Choose Signature at the bottom toolbar and simply draw your autograph with a finger or stylus to eSign the sample.
  • 4.Tap Done -> Save right after signing the sample.
  • 5.Tap Save or use the Make Template option to re-use this paperwork in the future.

This process is so easy your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form is completed and signed within a few taps. The airSlate SignNow application works in the cloud so all the forms on your mobile device remain in your account and are available any time you need them. Use airSlate SignNow for iOS to enhance your document management and eSignature workflows!

How to Sign a PDF on Android How to Sign a PDF on Android

How to fill out and sign forms on Android

With airSlate SignNow, it’s simple to sign your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form on the go. Install its mobile application for Android OS on your device and start improving eSignature workflows right on your smartphone or tablet.

Follow the step-by-step guide to eSign your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form on Android:

  • 1.Go to Google Play, search for the airSlate SignNow app from airSlate, and install it on your device.
  • 2.Sign in to your account or register it with a free trial, then import a file with a ➕ button on the bottom of you screen.
  • 3.Tap on the uploaded file and select Open in Editor from the dropdown menu.
  • 4.Tap on Tools tab -> Signature, then draw or type your name to eSign the sample. Complete blank fields with other tools on the bottom if required.
  • 5.Use the ✔ button, then tap on the Save option to end up with editing.

With an easy-to-use interface and total compliance with primary eSignature standards, the airSlate SignNow app is the perfect tool for signing your girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form. It even works offline and updates all form changes once your internet connection is restored and the tool is synced. Complete and eSign documents, send them for approval, and generate multi-usable templates whenever you need and from anywhere with airSlate SignNow.

Sign up and try Girders columns and posts sill sealer under the sill plates sheathing and siding the exterior walls siding form
  • Close deals faster
  • Improve productivity
  • Delight customers
  • Increase revenue
  • Save time & money
  • Reduce payment cycles