- 1 -
DRYWALL CONTRACT
THIS DRYWALL CONTRACT (“Contract”), effective as of the date of the last party to sign
below, is between , having an address at
("Contractor") and ,
having an address at
("Owner").
For valuable consideration the parties hereby agree as follows:
1. SCOPE OF WORK: Contractor shall provide all labor and materials, and perform all work
necessary for the completion of the residence, structure, or improvements as described in the
drawings and specifications signed by both Owner and Contractor (“Project”) and more
particularly described as
Such drawings and specifications are hereby made a part of this Contract. Drawings and
specifications shall contain a scale drawing showing the shape, size, and dimensions of the
construction and equipment together with a description of the work to be done, material s to be
used, and the equipment to be used or installed.
Brand Name of Drywall:
Material: ” Drywall ” Drywall ” Drywall ” Drywall ” Drywall
Areas to Receive:
Hung With:
Drywall Nails inches on
center and glued. inches on
center and glued. inches on
center and glued. inches on
center and glued. inches on
center and glued.
Surface and Joint
Treatment will be taped and coat(s) of drywall compound applied, sanded and readied for paint ing
or other wall coverings.
Special Wall
Treatment
Ceiling
Treatment Labor and necessary materials to spray ceilings with textured spray; labor and ne cessary
materials to apply to ceilings.
2. WORK SITE: The Project shall be constructed on the property of Owner located at
and more
particularly described as (hereafter
"the Work Site"). Owner hereby authorizes Contractor to commence and complete the usua l and
customary excavation and grading on the Work Site as may be required in the judgment of the
Contractor to complete the Project. Unless called for in the drawings or specificat ions, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before
.
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be include d as part of
the Project price.
- 2 -
5. INSURANCE: Contractor shall maintain general liability, workers compensation and builder's
risk insurance.
6. SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
out property lines to the Contractor. If the Owner or Contractor has any doubt about the locat ion
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions tha t
affect the Work Site.
7. CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the drawings and specifications, from time to time during the const ruction of
the Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contrac tor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not i t is in excess of the
estimated cost.
8. CONTRACT PRICE: {COST PLUS}
Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of
$ for performing the services set forth in the scope of the work. Contractor
shall be paid as follows:
.
OR
{FIXED FEE}
Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.
Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.
9. LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10)
days from the due date shall be deemed a material breach of this Contract. If paym ent is not made
when due, Contractor may suspend work on the job until such time as all payments due have bee n
made without breach of the Contract pending payment or resolution of any dispute. Owner agree s
to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the
rate of 1% per month.
- 3 -
10. DESTRUCTION AND DAMAGE: If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contra ctor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If t he
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
either party, Contractor shall be excused from further performance under this Contract and Owner
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.
11. ASSIGNMENT : Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.
12. INTERPRETATION: (a) Interpretation of Documents. The Contract, drawings, and specifications are intended to
supplement one another. In the event of a conflict, the specifications shall control the drawings,
and the Contract shall control both. If work is displayed on the drawings but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the drawings,
Contractor shall be required to perform the work as though it were called for and displayed in both
documents.
(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exi sts
between the parties. This Contract may only be modified only by a written agreeme nt signed by
both parties.
(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
laws of the State of Wyoming.
13. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing part y in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.
14. PERFORMANCE: (a) Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
this Contract provided Contractor shall remain fully responsible for the proper completion of the
Project.
(b) All work shall be completed in a workman-like manner and in compliance with all
building codes and applicable laws. To the extent required by law, all work shall be pe rformed by
individuals duly licensed and authorized by law to perform said work.
(c) Contractor agrees to remove all debris and leave the premises in broom clean condition.
15. WARRANTY: Contractor agrees to repair any defects in workmanship to walls and ceilings
such as nail pops, blisters and hairline cracks in excess of " for a period of .
Contractor agrees to make such repairs at the following times: prior to final payment , days
after move-in, and days after the move-in date. Owner agrees to provide Contra ctor with a
- 4 -
list of the defects and their exact location at each of the above-stated time periods; and Owner
agrees Contractor shall have a week time period in which to complete repairs. Contractor
shall not be responsible for any touch-up painting, nor be responsible for color mismatch of
painted surfaces, since this may be a result of oxidation or batch number of the painting mix.
Contractor's warranty shall be limited to defects in workmanship within the scope of work
performed by Contractor and which arise and become known within year(s) from the date
hereof. All said defects arising after year(s) and defects in material are not warranted by
Contractor. Contractor hereby assigns to Owner all warranties on materials as provided by the
manufacturer of such materials.
AGREED:
CONTRACTOR:
Signature
Print Name & Title
Date
License Number
Name and Address of License Holder
OWNER:
Signature
Print Name
Date
- 5 -
* Optional notice required only for home solicitation salesNOTICE OF CANCELLATION
You may cancel this transaction without any penalty or obligation within three (3) busine ss days from
_____________________ (enter date of transaction). If you cancel, any property traded in, any payments
made by you under the contract or sale and any negotiable instrument executed by you will be returned
within ten (10) business days following receipt by the seller of your cancellation notice . Any security
interest arising out of the transaction will be cancelled.
If you cancel, you must make available to the seller at your residence, in substant ially as good condition
as when received, any goods delivered to you under this contract or sale, or you may if you wish comply
with the instructions of the seller regarding the return shipment of the goods at the sell er's expense and
risk.
If you do make the goods available to the seller and the seller does not pick them up within twenty (20)
days of the date of your notice of cancellation, you may retain or dispose of the goods without a ny further
obligation. If you fail to make the goods available to the seller, or if you agree to return the goods to the
seller and fail to do so, then you remain liable for performance of all obligations under the contract.
To cancel this transaction, mail or deliver a signed and dated copy of this cance llation notice or any other
written notice, or send a telegram, to _____________________ (name of seller), at
_____________________ (address of seller's place of business) not later than 12:00 midnight of
_____________________ (date).
I hereby cancel this transaction._________________________ _____________________________________
(Date) (Buyer's signature)
- 6 -
* Optional notice required only for home solicitation salesNOTICE OF CANCELLATION
You may cancel this transaction without any penalty or obligation within three (3) busine ss days from
_____________________ (enter date of transaction). If you cancel, any property traded in, any payments
made by you under the contract or sale and any negotiable instrument executed by you will be returned
within ten (10) business days following receipt by the seller of your cancellation notice . Any security
interest arising out of the transaction will be cancelled.
If you cancel, you must make available to the seller at your residence, in substant ially as good condition
as when received, any goods delivered to you under this contract or sale, or you may if you wish comply
with the instructions of the seller regarding the return shipment of the goods at the sell er's expense and
risk.
If you do make the goods available to the seller and the seller does not pick them up within twenty (20)
days of the date of your notice of cancellation, you may retain or dispose of the goods without a ny further
obligation. If you fail to make the goods available to the seller, or if you agree to return the goods to the
seller and fail to do so, then you remain liable for performance of all obligations under the contract.
To cancel this transaction, mail or deliver a signed and dated copy of this cance llation notice or any other
written notice, or send a telegram, to _____________________ (name of seller), at
_____________________ (address of seller's place of business) not later than 12:00 midnight of
_____________________ (date).
I hereby cancel this transaction._________________________ _____________________________________
(Date) (Buyer's signature)
Useful tips on preparing your ‘Such As Nail Pops Blisters And Hairline Cracks In Excess Of’ online
Are you fed up with the inconvenience of handling paperwork? Look no further than airSlate SignNow, the premier electronic signature service for individuals and small to medium-sized businesses. Bid farewell to the monotonous task of printing and scanning documents. With airSlate SignNow, you can easily complete and sign documents online. Take advantage of the robust features integrated into this user-friendly and affordable platform and transform your approach to document management. Whether you need to authorize forms or gather eSignatures, airSlate SignNow manages everything effortlessly, requiring only a few clicks.
Adhere to these comprehensive instructions:
- Log into your account or initiate a free trial with our service.
- Click +Create to upload a document from your device, cloud storage, or our template repository.
- Open your ‘Such As Nail Pops Blisters And Hairline Cracks In Excess Of’ in the editor.
- Click Me (Fill Out Now) to prepare the file on your end.
- Add and designate fillable fields for others (if required).
- Proceed with the Send Invite settings to request eSignatures from additional parties.
- Download, print your version, or convert it into a reusable template.
No need to worry if you have to collaborate with your teammates on your Such As Nail Pops Blisters And Hairline Cracks In Excess Of or send it for notarization—our solution provides everything required to accomplish these tasks. Register for an account with airSlate SignNow today and enhance your document management to a higher standard!