Establishing secure connection…Loading editor…Preparing document…

Application for Certificate of Occupancy

This template is fully customizable. Edit the text, fill out the fields, and send it for signature. Give it a try!

CERTIFICATE OF OCCUPANCY APPLICATION

An incomplete application may delay the review process or cause denial of the application. PERMIT NUMBER:

Project name

D/B/A

Project address

Nature of Business

Renovations scheduled

APPLICANT

NAME & ADDRESS

EMAIL

TELEPHONE

FAX

BUSINESS OWNER

NAME & ADDRESS

EMAIL

TELEPHONE

FAX

PROPERTY OWNER

NAME & ADDRESS

EMAIL

TELEPHONE

FAX

 or 

Business/property use:

Is this a new business? or   Is this a change of ownership? or   Is this a change of business name? or

Current Occupant Load

Is this a medical facility? or   Is the building equipped with an automatic fire sprinkler system? or

Will you require a utility release prior to inspection or occupancy? or

Electrical provider is or

Gas provider is or

AREAS: Office space Restaurant Retail Sanctuary
Warehouse Manufacturing Other Square feet used for storage

Does this include ‘fixed seating’? or How many in ‘fixed seating’ area?

Does this include ‘patio seating’? or How many in ‘patio seating’ area?

TOTAL

Please select: , if the occupancy / business involves storage, sale or use of the following:

Other hazards (please specify)

(A) FOOD ESTABLISHMENTS ARE REQUIRED TO COMPLETE A HEALTH PERMIT APPLICATION AND SUBMIT TO HEALTH & FOOD SAFETY. If you have health-related questions, please contact Health & Food Safety at (972) 292-5304 or via email to health@friscotexas.gov.

(B) SIGNS: Please review the current Sign Ordinance at www.friscotexas.gov/departments/planningDevelopment/Pages/MostRequestedOrdinances.aspx for submittal and permit requirements.

APPLICANT’S SIGNATURE

DATE

APPLICANT’S PRINTED NAME

TELEPHONE

CELL

FAX

Applications with ‘original’ signatures ONLY. Facsimiles, e-mails or other forms of electronic media transmissions will not be accepted.

HOW TO GET A CERTIFICATE OF OCCUPANCY

Why do I need a certificate of occupancy? If you are a new tenant/owner of an existing business, changing the name of your business or changing the use of your building, records must be updated with the City to provide the best service to you in the future. In addition, this is the appropriate time for City inspectors to provide you with a general life safety inspection of your occupancy to ensure you have the minimum provision for light, heat, ventilation, sanitation and egress of your business.

If you are making changes to building elements, ex: wall construction, equipment installation, a Certificate of Occupancy Application does not apply to your project. You must submit a ‘Commercial Building Permit Application’ and that permit will conclude with a Certificate of Occupancy.

An application for Certificate of Occupancy can be found online at www.friscotexas.gov/building, then selecting ‘Plan Review & Forms’ located on the left-hand side of the webpage or at the Customer Service Desk located at 6101 Frisco Square Blvd, 3rd floor. It is recommended you make application in person at the Customer Service Desk and review your application with staff to ensure it is completed correctly during the time of submittal. This will help avoid delay in the review of your application. Additional information may also be required at the time of your application submittal.

Right to Occupy - The City needs to know you have the right to occupy the building. This can be remedied by providing a signed lease agreement or a recorded deed if you have purchased the property.

Site plan – A site plan may be required if you are changing the use of the occupancy to verify adequate site elements like parking and accessibility are being provided.

Space plan – A basic space plan shall be provided to ensure we understand what you are proposing to occupy and the use of each area within that space.

REQUIRED INSPECTION(S)

New Tenant/Owner or Name Change of an Existing Business – Not a Food Establishment

If there is no electrical and/or gas service established, you must first have an Electrical Release and Gas Release inspection by Building Inspections and service turned on before you can request any additional inspections. The franchise utilities require a release from the City if services have been disconnected for any period of time. If the electrical and gas are already established to the occupancy (and you do not anticipate a disconnection from the franchise service providers), only Courtesy CO and Courtesy Fire inspections are required. These two (2) inspections are requested to Building Inspections and coordinated to be completed during the same day.

New Tenant/Owner of an Existing Business - Food Establishment w/No Changes to Food Operations

It is recommended for any food establishment that you first contact Health & Food Safety to discuss any operational changes which may affect the requirements of occupancy. Additional documentation will be required to complete a review of a Certificate of Occupancy Application for Food Establishments. The ‘Minimum Standards for Food Establishments’ handout is available at the Customer Service Desk. If no electrical and/or gas service is established, you must first have Electrical Release and Gas Release inspections by Building Inspections and service turned on before you can request additional inspections. The franchise utilities require a release from the City if services have been disconnected for any period of time. If the electrical and gas are already established to the occupancy (and you do not anticipate any disconnection from franchise service providers) only Health Final, Courtesy CO and Courtesy Fire inspections are required. Heath & Food Safety and Building inspections may be completed the same day if coordinated through Building Inspections prior to request.

HOW TO REQUEST INSPECTIONS OF YOUR OCCUPANCY

There are two (2) ways to request an occupancy inspection of your business. Inspections may be scheduled at the Customer Service Desk, located at 6101 Frisco Square Blvd., 3rd Floor at the time of application. To request an occupancy inspection via telephone, please call (972) 292-5386. Please ensure to provide the permit number assigned at the time of application, along with the street address (and suite number, if applicable) and business name. The cut-off time for a telephonic inspection request is 8:00PM the prior evening of the inspection.

If the Courtesy Fire inspection fails, you must contact the Fire Marshal’s Office directly at (972) 292-6328 to schedule the reinspection.

1. Requirement for Gas Release inspection: Gas systems must be placed on pressure test by a licensed and register plumbing contractor for inspection. Low pressure systems require a 3lb. test on a 5 or 6lb. gauge. Intermediate pressure systems require a 10lb. test on a 15lb. gauge. Access shall be provided to all areas containing fuel fired equipment.

Enter text✕

What the Application for Certificate of Occupancy Is

The Application for Certificate of Occupancy is a municipal permit request that documents a building or space's compliance with applicable codes and approvals before it is used or occupied. It ties construction permits, inspections, and zoning approvals to a formal record that the structure meets safety, health and occupancy standards. Municipalities use the application to verify permitted use, approved plans, fire and life-safety systems, and any required trade inspections before issuing a certificate that authorizes lawful occupancy.

Why the Application for Certificate of Occupancy Matters

A correct application ensures lawful occupancy, protects liability for owners and tenants, and documents compliance with building, fire and zoning requirements. It is required by most local authorities before utilities are connected, businesses open, or leases commence.

Why the Application for Certificate of Occupancy Matters

Who Completes the Application and Why

Typical filers include property owners, general contractors, tenants, and design professionals who submit required plans and inspection evidence to the local building department.

  • Property owners and landlords prepare ownership and occupancy intent information when applying for or transferring a certificate.
  • General contractors supply permit numbers, contractor registration, and inspection sign-offs tied to construction or alteration work.
  • Design professionals (architects/engineers) submit approved plans, occupancy classification, and code compliance statements for review.

Knowing which role completes each section helps avoid delays: owners confirm legal ownership; contractors provide trade approvals; architects submit plans.

Who Signs and Who Manages the Application

Owner / CEO

The property owner or an authorized officer signs to attest to ownership, intended use, and truthfulness of application statements. Their signature establishes legal responsibility for compliance and ongoing maintenance obligations.

Licensed Contractor

A licensed contractor or construction manager signs portions related to completed work and inspections. Their endorsement links trade permits and inspection results to the application record.

Key Sections to Include in a Professional Application for Certificate of Occupancy

A complete application bundles identification, code classifications, permit history, inspection results, and required attachments so municipal reviewers can confirm compliance without follow-up requests.

Applicant Details

Full legal name, mailing address, contact phone and email for the owner or authorized agent; include licensing numbers where applicable for contractors and professionals.

Property Description

Street address, parcel or lot number, unit or suite identifiers, building square footage, floor numbers and current use classification per the local code.

Permit History

List original building permit numbers, alteration permits, final inspection dates, and any outstanding code enforcement matters related to the property.

Occupancy Classification

State the intended occupancy group (assembly, business, residential, etc.), maximum occupant load, and any mixed-use descriptions that affect code review.

Inspection Records

Attach final trade inspections, fire department approvals, elevator certifications, accessibility compliance and proof of required tests or system commissioning.

Supporting Attachments

Include approved plans, energy compliance reports, zoning approvals, certificate of insurance and any special permits required by local ordinance.

Required Data Elements on the Application

Applicant Name: Full legal name
Property Address: Complete street address
Parcel ID: Assessor parcel number
Permit Numbers: Existing permit references
Occupancy Type: Code classification
Contact Info: Phone and email

Step-by-Step: Completing the Application

Follow these ordered tasks to prepare a complete filing and reduce inspection or review cycles.

  • 01
    Prepare Documents: Gather permits, plans and inspection reports for attachment.
  • 02
    Complete Form: Enter applicant, property and occupancy details accurately.
  • 03
    Attach Evidence: Upload approved plans, trade sign-offs and safety certificates.
  • 04
    Submit & Pay: File online or in person and pay required fees to start review.

Configuring an Online Submission Workflow

When submitting electronically, configure fields and attachments so reviewers can quickly verify compliance without manual requests.

Field Configuration
Applicant Verification Require uploaded ID or business registration document
Plan Attachments Accept PDF/A plans with page bookmarks
Signature Method Enable eSignature or allow notarized PDF uploads
Inspection Scheduling Enable calendar link or preferred inspection window

Typical Submission to Issuance Workflow

The process generally moves from application receipt through review, inspection and certificate issuance; online systems vary by municipality.

  • Application Intake: Staff logs the submission and confirms fee payment.
  • Plan Review: Code officials check plans and occupancy classification.
  • Inspection Scheduling: Inspections are scheduled for required trades or systems.
  • Issuance: A certificate is issued once all requirements are satisfied.

Technical Options for eSubmission and Signing

Municipal ePortals accept PDF, DOCX and scanned attachments; eSignature acceptance varies by jurisdiction and document type.

  • File Formats: PDF, DOCX accepted by many portals
  • Authentication: Email/SMS or stronger ID proofing often supported
  • Integrations: Common connections include Google Workspace and MS 365

Typical Timelines and Processing Expectations

Review and issuance timeframes differ by municipality and project complexity; plan for review cycles and possible reinspection periods.

Initial Review Window:

Often 5–20 business days depending on workload and complexity

Inspection Lead Time:

Schedule inspections 3–15 business days after request

Correction Response:

Applicants commonly have 10–30 days to respond to review comments

Reinspection Timing:

Reinspection slots depend on inspector availability and readiness

Issuance After Approval:

Certificate typically issued within 1–5 business days post-final approval

Key Milestones from Filing to Occupancy

Track milestones to anticipate tasks and avoid occupancy delays; these stages represent common sequential checkpoints.

01

Application Filed

Submission recorded and payment confirmed; reviewer assigned.

02

Plan Review Complete

Reviewer issues approval or correction list for applicant response.

03

Final Inspections

All trade and fire safety inspections must pass before approval.

04

Certificate Issued

Official occupancy authorization is published and provided to applicant.

Common Mistakes That Delay Certificate Issuance

  • Incomplete attachments: missing trade sign-offs, incomplete plans, or absent final inspection reports often trigger administrative holds.
  • Incorrect property identifiers: wrong parcel numbers or address formats send applications to the wrong file and delay processing.
  • Mismatched names: applicant name not matching property ownership records can require notarized authorizations or owner confirmation.
  • Improper signatures: unsigned pages, unsigned contractor attestations, or unaccepted eSignature methods cause rejection or resubmission.

Consequences of Occupying Without a Certificate

Civil Fines: Monetary penalties imposed by local code enforcement
Utility Termination: Connections may be delayed or disconnected
Insurance Risk: Coverage claims may be denied for unpermitted occupancy
Contract Breach: Leases or loan agreements may be violated
Liability Exposure: Increased tort and safety liability risk
Enforcement Action: Injunctions or eviction notices can follow

eSignature Pricing and Feature Snapshot for Certificate Workflows

Compare typical vendor starting prices and feature availability for eSignature usage tied to permit submission and document routing.

signNow DocuSign Adobe Sign PandaDoc HelloSign
Starting Price $8/user/mo $15/user/mo $14/user/mo $19/user/mo $15/user/mo
Free Trial 7-day free trial Varies by vendor Varies by vendor Varies by vendor Varies by vendor
Bulk Send Yes Yes Yes Yes No
Audit Trail Yes Yes Yes Yes Yes
Envelope Cap No cap 100 envelopes/user/year Varies by plan Varies by plan Varies by plan

Real-World Examples of Application Use

Two representative scenarios illustrate typical filing needs and common outcomes when the application is correctly prepared.

Small Retail Tenant

A retail tenant submitted required trade approvals and an occupancy classification prior to opening.

  • Final electrical and fire inspections were completed within two weeks.
  • Properly bundled attachments and accurate property identifiers enabled issuance before the lease start date, avoiding utility activation delays and lease penalties.

Multi-Unit Conversion

A developer converted commercial space to mixed-use residential and commercial occupancy.

  • Multiple plan revisions and additional inspections were required.
  • Coordinated submissions from architect, contractor and fire marshal led to staged approvals and final certificate issuance once all systems complied with local codes.

Practical Tips for a Faster Approval

Adopt these practices to minimize review cycles, reduce oral follow-ups and ensure a smoother approval path.

Pre-Submission Checklist
Assemble permits, final trade inspection reports, approved plans and any special permits before filing to avoid incomplete-submission rejections.
Accurate Identifiers
Verify parcel numbers, legal property descriptions and owner names against county records to prevent misrouting and administrative delays.
Coordinate Inspections
Request all required trade inspections in a coordinated sequence and confirm the inspector’s acceptance criteria to limit reinspection cycles.
Confirm eSubmission Rules
Check the local building department’s guidelines for electronic filing, accepted signature types and whether remote online notarization is permitted.

Frequently Asked Questions About the Application for Certificate of Occupancy

Answers to common questions about signatures, inspections, electronic submissions, and what to do when the application is returned for corrections.


Need help? Contact support

be ready to get more
Join over 28 million airSlate SignNow users