- 1 - DRYWALL CONTRACT THIS DRYWALL CONTRACT (“Contract”), effective as of the date of the last party to sign
below, is between , having an address at
("Contractor") and ,
having an address at
("Owner").
For valuable consideration the parties hereby agree as follows:1. SCOPE OF WORK: Contractor shall provide all labor and materials, and perform all work
necessary for the completion of the residence, structure, or improvements as described in the
drawings and specifications signed by both Owner and Contractor (“Project”) and more
particularly described as Such drawings and specifications are hereby made a part of this Contract. Drawings and
specifications shall contain a scale drawing showing the shape, size, and dimensions of the
construction and equipment together with a description of the work to be done, materials to be
used, and the equipment to be used or installed. Bra n d N am e o f D ry w all: M ate ria l: ” D ry w all ” D ry w all ” D ry w all ” D ry w all ” D ry w allA re a s t o R eceiv e: H un g W it h : D ry w all N ails i n ch es o n
cen te r a n d g lu ed . i n ch es o n
cen te r a n d g lu ed . i n ch es o n
cen te r a n d g lu ed . i n ch es o n
cen te r a n d g lu ed . i n ch es o n
cen te r a n d g lu ed .S urfa ce a n d J oin t
Tr e a tm en t w ill b e t a p ed a n d c o at( s ) o f d ry w all c o m pound a p plie d , s a n ded a n d r e ad ie d f o r p ain tin g
or o th er w all c o verin gs.S pecia l W all
Tr e a tm en t C eilin g
Tre a tm en tL ab or a n d n ecessa ry m ate ria ls t o s p ra y c eilin gs w ith t e x tu re d s p ra y ; l a b or a n d n ecessa ry
mate ria ls t o a p ply t o c eilin gs.2. WORK SITE: The Project shall be constructed on the property of Owner located at and more
particularly described as (hereafter
"the Work Site"). Owner hereby authorizes Contractor to commence and complete the usual and
customary excavation and grading on the Work Site as may be required in the judgment of the
Contractor to complete the Project. Unless called for in the drawings or specifications, no
landscaping, finish grading, filling or excavation is to be performed at the Work Site by the
Contractor.
3. TIME OF COMPLETION: Contractor shall commence the work to be performed under this
Contract on or before and shall substantially complete the work on or before
.
Contractor shall not be liable for any delay due to circumstances beyond its control including
strikes, casualty, acts of God, illness, injury, or general unavailability of materials.
4. PERMITS: Contractor shall apply for and obtain such permits and regulatory approvals as may
be required by the local municipal/county government, the cost thereof shall be included as part of
the Project price.
- 2 - 5.INSURANCE: Contractor shall maintain general liability, workers compensation and builder's
risk insurance.6.SURVEY AND TITLE: If the Project is near the Owner’s property boundary, Owner will point
out property lines to the Contractor. If the Owner or Contractor has any doubt about the location
of the property lines, Owner shall provide Contractor with boundary stakes through a licensed
surveyor. In addition, Owner shall provide Contractor documentation that Owner has title to the
Work Site and shall provide Contractor copies of any covenants, conditions, or restrictions that
affect the Work Site.7.CHANGES TO SCOPE OF WORK: Owner may make changes to the scope of the work,
including changes to the drawings and specifications, from time to time during the construction of
the Project. However, any such change or modification shall only be made by written "Change
Order" signed by both parties. Such Change Orders shall become part of this Contract. Owner
agrees to pay any increase in the cost of the Project as a result of a Change Order. In the event the
cost of a Change Order is not known at the time a Change Order is executed, the Contractor shall
estimate the cost thereof and Owner shall pay the actual cost whether or not it is in excess of the
estimated cost.8.CONTRACT PRICE:{COST PLUS}Owner agrees to pay Contractor the actual cost to Contractor of materials plus the sum of$ for performing the services set forth in the scope of the work. Contractor
shall be paid as follows:
.OR{FIXED FEE}Owner agrees to pay Contractor the sum of $ for performing the services set
forth in the scope of the work. Contractor shall be paid as follows:
.Contractor shall furnish Owner appropriate releases or waivers of lien for all work performed or
materials provided at the time the next periodic payment shall be due.9.LATE PAYMENT/DEFAULT: A failure to make payment for a period in excess of ten (10)
days from the due date shall be deemed a material breach of this Contract. If payment is not made
when due, Contractor may suspend work on the job until such time as all payments due have been
made without breach of the Contract pending payment or resolution of any dispute. Owner agrees
to pay a late charge of 1% of all payments that are more than ten (10) days late plus interest at the
rate of 1% per month.
- 3 - 10.DESTRUCTION AND DAMAGE : If the Project is destroyed or damaged for any reason,
except where such destruction or damage was caused by the sole negligence of the Contractor or
its subcontractors, Owner shall pay Contractor for any additional work done by Contractor in
rebuilding or restoring the Project to its condition prior to such destruction or damage. If the
estimated cost of replacing work already accomplished by Contractor exceeds 20 percent of the
Contract price, either the Contractor or Owner may terminate this Contract. Upon termination by
either party, Contractor shall be excused from further performance under this Contract and Owner
shall pay Contractor a percentage of the Contract price in proportion to the amount of work
accomplished prior to the destruction or damage.11. ASSIGNMENT: Neither party may assign this Contract, or payments due under the Contract,
without the other party’s written consent. Any such assignment shall be void and of no effect.12.INTERPRETATION:(a)Interpretation of Documents. The Contract, drawings, and specifications are intended to
supplement one another. In the event of a conflict, the specifications shall control the drawings,
and the Contract shall control both. If work is displayed on the drawings but not called for in the
specifications, or if the work is called for in the specifications but not displayed on the drawings,
Contractor shall be required to perform the work as though it were called for and displayed in both
documents.(b) Entire Agreement. This Contract constitutes the entire agreement of the parties. No other
agreements, oral or written, pertaining to the work to be performed under this Contract exists
between the parties. This Contract may only be modified only by a written agreement signed by
both parties.(c) Governing Law. This Contract shall be interpreted and governed in accordance with the
laws of the State of New Jersey.13. ATTORNEYS’ FEES AND COSTS: If any party to this Contract brings a cause of action
against the other party arising from or relating to this Contract, the prevailing party in such
proceeding shall be entitled to recover reasonable attorney fees and court costs.14.PERFORMANCE:(a)Contractor may, at its discretion, engage licensed subcontractors to perform work pursuant
this Contract provided Contractor shall remain fully responsible for the proper completion of the
Project. (b) All work shall be completed in a workman-like manner and in compliance with all
building codes and applicable laws. To the extent required by law, all work shall be performed by
individuals duly licensed and authorized by law to perform said work.(c)Contractor agrees to remove all debris and leave the premises in broom clean condition.15.WARRANTY: Contractor agrees to repair any defects in workmanship to walls and ceilings
such as nail pops, blisters and hairline cracks in excess of " for a period of .
Contractor agrees to make such repairs at the following times: prior to final payment, days
after move- in, and days after the move-in date. Owner agrees to provide Contractor with a
- 4 - list of the defects and their exact location at each of the above-stated time periods; and Owner
agrees Contractor shall have a week time period in which to complete repairs. Contractor
shall not be responsible for any touch-up painting, nor be responsible for color mismatch of
painted surfaces, since this may be a result of oxidation or batch number of the painting mix.
Contractor's warranty shall be limited to defects in workmanship within the scope of work
performed by Contractor and which arise and become known within year(s) from the date
hereof. All said defects arising after year(s) and defects in material are not warranted by
Contractor. Contractor hereby assigns to Owner all warranties on materials as provided by the
manufacturer of such materials. A mortgage or security interest to be taken in connection with the financing or sale of the home
improvement applies and is described as follows: ______________________________.
A person other than the seller is to act as the general contractor or assume responsibility for
performance of the contract and is identified as:
Name: ______________________________Address: ______________________________ NOTICE TO OWNER Do not sign this contract in blank. You are entitled to a copy of the contract at the time you
sign. Keep it to protect your legal rights. Do not sign any completion certificate or agreement
stating that you are satisfied with the entire project before this project is complete. Home repair
contractors are prohibited by law from requesting or accepting a certificate of completion
signed by the owner prior to the actual completion of the work to be performed under the home
repair contract. Workmen's compensation and public liability insurance are carried by the home repair
contractor and applicable to the work to be performed under the contract. The home repair contractor is qualified as a self-insurer pursuant to Title 34; The home repair contractor is precluded from purchasing workmen's compensation under
chapter 15 of Title 34 of the Revised Statutes,and does not carry workmen's compensation
insurance. AGREED:CONTRACTOR:Signature OWNER:Signature
- 5 - Print Name & Title Date License Number Name and Address of License Holder Print Name of Salesperson (if applicable) Address of Salesperson (if applicable) Phone NumberPrint Name Date
- 6 - * Required for use in home solicitation sales only: RECEIPT ______________________________Contractor's Name ______________________________Contractor’s Place of BusinessDescription of the goods and services sold:______________________________Amount of money paid by the owner or the cash value of any goods delivered to the home repair
contractor at the time the home repair contract was entered into: ______________________________NOTICE TO OWNER: YOU MAY RESCIND THIS SALE PROVIDED THAT YOU NOTIFY THE
HOME REPAIR CONTRACTOR OF YOUR INTENT TO DO SO BY CERTIFIED MAIL, RETURN
RECEIPT REQUESTED, POSTMARKED NOT LATER THAN 5 P.M. OF THE THIRD BUSINESS
DAY FOLLOWING THE SALE. FAILURE TO EXERCISE THIS OPTION, HOWEVER, WILL NOT
INTERFERE WITH ANY OTHER REMEDIES AGAINST THE HOME REPAIR CONTRACTOR
YOU MAY POSSESS. IF YOU WISH YOU MAY USE THIS PAGE AS NOTIFICATION BY
WRITING "I HEREBY RESCIND' AND ADDING YOUR NAME AND ADDRESS. A DUPLICATE
OF THIS RECEIPT IS PROVIDED BY THE HOME REPAIR CONTRACTOR FOR YOUR
RECORDS.
Helpful hints for preparing your ‘Will Be Taped And’ online
Are you fed up with the inconvenience of handling paperwork? Look no further than airSlate SignNow, the premier eSignature solution for individuals and businesses. Bid farewell to the tedious task of printing and scanning documents. With airSlate SignNow, you can effortlessly complete and sign documents online. Take advantage of the powerful features integrated into this user-friendly and budget-friendly platform and transform your strategy for document management. Whether you need to approve forms or collect signatures, airSlate SignNow manages everything seamlessly, needing just a few clicks.
Adhere to this comprehensive guide:
- Log into your account or initiate a free trial with our service.
- Select +Create to upload a file from your device, cloud, or our form library.
- Open your ‘Will Be Taped And’ in the editor.
- Click Me (Fill Out Now) to finalize the document on your end.
- Add and assign fillable fields for other participants (if needed).
- Proceed with the Send Invite settings to request eSignatures from others.
- Download, print your copy, or convert it into a multi-use template.
No need to worry if you require collaboration with others on your Will Be Taped And or send it for notarization—our platform is equipped with everything you need to accomplish such tasks. Register with airSlate SignNow today and enhance your document management to a higher level!